1. Technical Summary Report on Equipment Work
20____ is an extraordinary year. In this year, our workshop basically focused on two aspects: first, to ensure the stable, safe and long-term operation of equipment; Second, under the premise of stable operation of the equipment, we will continue to study and explore, carry out technical transformation and increase output. Many things happen. After a year's hard work, under the correct leadership of the company, the departments and workshops United and successfully completed various technical transformation and maintenance tasks, and finally achieved gratifying results. Looking back on this year, there are experiences, lessons, achievements and shortcomings, which are summarized as follows: 1. Adhere to the good operation of the equipment to ensure the continuous and stable production. After many technical improvements, there are 400 sets of equipment in our workshop, and the monthly equipment integrity rate is above 99.6%, and the leakage rate of dynamic and static sealing points is kept within the required value. The whole equipment runs well throughout the year, which can completely guarantee normal production.
1. Solving equipment hidden dangers This year, after many researches and explorations, several equipment hidden dangers that have long affected normal production have been solved: for example, the vibration of induced draft fan exceeds the standard; The balance plate of multistage pump is often worn; The reducer vibrates greatly.
2. Planned maintenance According to the equipment operation records and daily observation records of equipment operation conditions, planned maintenance (i.e. preventive maintenance) is carried out for major equipment. This year, the planned maintenance of two centrifugal compressors, a reciprocating compressor and other major equipment was mainly completed, and the lubricating oil of these equipment was completely replaced according to the oil change analysis and oil change cycle. Through preventive maintenance, the loss of downtime and the cost of fault prevention are minimized, which lays the foundation for the long-term stable operation of equipment.
3. After adopting new technology, the tube side of heat exchanger in our factory is too thick due to scaling, and the flow rate is too small. High pressure cleaning has been used before, and the effect is not obvious. This time, after careful study and analysis by the company's technicians, heat exchange equipment was used for separate circulating chemical cleaning. The deposits in the equipment are loosened, stripped and dissolved by chemical agents, and the metal surface of the equipment is passivated after cleaning, and a polymer protective film is formed on the metal surface to achieve the purposes of scale prevention, oxidation prevention and corrosion prevention, thus protecting the equipment and prolonging its service life. From the start-up effect, the process of the equipment meets the technical requirements, and this success is of far-reaching significance for us to solve similar problems in the future.
Second, pay close attention to management, attach importance to talents and strive for the development and progress of a society. Productivity and production relations should be adapted. If an enterprise wants to develop, it also needs advanced production technology and advanced management system, and excellent talents to implement and apply it.
1. To create a civilized workshop and implement TPM employee management, we should pay attention to both hands, and both hands should be hard. This year, our workshop not only made a lot of efforts in increasing production, but also did a lot of homework in management. June+10, 5438, our workshop actively responded to the company's call, paid close attention to equipment management according to the company's requirements, and implemented preventive maintenance as the basis and spot inspection as the core. This year, our workshop has basically completed the preparatory work for the early stage of spot check according to the spot check promotion plan required by the company, which has been implemented in some positions, making full preparations for the implementation of spot check management in the whole workshop and laying a good foundation for creating qualified workshops!
2. Improve system construction and strengthen implementation. System construction is an important guarantee for enterprise development. If the company wants to develop, it must seize the opportunity, persevere, operate flexibly, rely on the support of employees and strict system management. In terms of implementation system, our workshop adheres to the principle that everyone is equal and rewards and punishments are clear. At the same time, it integrates emotional management into the whole process of management by combining the humanistic management mechanism of "moving with emotion and understanding with reason", continuously improving the management quality, and truly turning the restraint mechanism into the conscious action of employees.
3. Pay attention to personnel training and arrange training and study. In the increasingly competitive market, enterprises must have learning ability and high-quality talents to survive and develop in the market competition. In 20____, according to the training plan made at the beginning of the year, our workshop was trained in safety management, technology, equipment and management, and the technical backbone of the workshop was sent to the factory for study 15 days. Through training, the comprehensive quality of employees in our workshop has been improved and the continuous appreciation of human resources has been realized.
Third, summarize the shortcomings of this year's work and establish the rectification plan for next year. Although our workshop has done a lot of work in the past 20 years and achieved gratifying results, there are still some shortcomings in the work.
1. The new management system makes some employees unable to keep up. Some employees' ideas are still old and changing slowly, lacking initiative, enterprising spirit, hardship consciousness and competition consciousness.
2. The comprehensive quality of employees needs to be improved, and the professional and technical personnel in the workshop need to be trained. Individual managers have poor innovation consciousness, low management level and lack of breakthrough in management.
3. The new equipment management system needs to be explored, studied, further improved and revised.
4. The maintenance work strictly implements the ticket processing, requires technical disclosure, and cannot be conveyed orally; The management system and methods are difficult to implement from beginning to end, and the execution is weak.
5. Anti-corrosion of equipment and pipelines is not in place, and there are potential safety hazards.
The above shortcomings will be overcome, rectified, constantly summarized and improved in the coming year. We will use our hardworking hands and wise brains to create a new look of the workshop and create greater benefits for the company.
IV. 20 _ _ _ My workshop equipment management objectives:
1. Workshops with qualified equipment management are up to standard.
2. Fully implement the daily inspection and management of promotional equipment.
3. Ensure the long-term, safe, stable and efficient operation of the production device.
4. Establish a good equipment management team and cultivate new technical management talents.
2. Technical summary report of equipment work
Looking back on the past year, the equipment management team fully implemented the company's management policy of SQCDPD in _ _ _ _ _, guided by "reducing costs and increasing efficiency, saving energy and reducing consumption, and improving the completeness rate of equipment and tools", earnestly implemented all the work of equipment management proposed in the work deployment, and strived to achieve the annual goal of "meeting the production demand to the maximum extent and cultivating an efficient professional team". Throughout the 20-year work of the equipment management team, with the support of leaders at all levels and the cooperation of other departments, the tasks assigned by the company have been well completed. This year, with the increase of new equipment, new facilities and new tools, and the redistribution of equipment management team, special work involves many aspects, and many difficulties and problems have been encountered in practical work. However, all members of the equipment management team have successfully exceeded the annual work by summing up and analyzing carefully, drawing lessons from the problems, exercising their abilities in difficulties, and improving themselves in reflection. First, earnestly study the maintenance and calibration and related professional knowledge, earnestly practice and improve the ability.
Due to the wide variety of equipment and tools in our company, a considerable part of them are cutting-edge products of science and technology. As maintenance and calibration personnel, they should be familiar with the principles and performance of various equipment and tools, so as to better manage, use and maintain the equipment and tools and ensure the smooth production. The equipment management team starts from learning the most basic knowledge and principles such as mechanical design, electricity and hydraulics. He completed a series of related training, such as electrician operation training, fitter basic training, hydraulic testing training, TES calibration process, safety management training and so on. And keep studying at least 1 hour every day. In his spare time, he seriously discussed the experience with the master, grasped and summarized their experiences and lessons in production, carefully consulted various operating instructions, and learned as much as possible about the performance, maintenance procedures and operating procedures of some equipment and tools.
Second, organize operators to learn knowledge and improve the operation and maintenance skills of equipment and tools.
Whether the equipment and tools can run normally and efficiently is the key factor to successfully complete the production task. The operating skill of operators is the key to the normal and efficient operation of equipment. In order to ensure the smooth progress of production, ensure that the delivery task is completed according to the time node, let the field operators better understand the equipment and tools, and effectively maintain the production equipment and tools, so only by improving the equipment maintenance and operation skills of the operators can the equipment work more effectively. According to the requirements of the department and the site, we have established the daily maintenance process of all equipment and tools with high failure rate.
Third, insist on equipment inspection.
Strengthen on-site equipment inspection, eliminate hidden dangers of equipment and tools in time, and ensure the good operation of equipment and tools. The equipment management team shall regularly inspect the on-site equipment and tools every Friday, check and analyze the use of equipment and tools, and strengthen inspection and notification. Through the implementation of a series of reward and punishment measures, the damage to equipment and tools caused by improper use and untimely daily maintenance has been effectively reduced.
Iv. Maintenance and calibration of equipment and tools and production plan of turnplate
In _ _ _ _ _, the equipment management team completed the work plans such as equipment verification plan, tool verification plan, annual hob drill verification plan, tooling car maintenance plan and pressure gauge verification plan in strict accordance with the time node, and completed the assembly of 49 sets of plugs, which met the needs of field production and escorted the delivery of the company's wings.
Five, save costs and improve the intact rate of equipment and tools.
According to our company's document No.20 _—07, the equipment management team organized and participated in special plans such as "improving the integrity rate of pneumatic tools and reducing the procurement cost of spare parts", "providing the integrity rate of process equipment and reducing the maintenance cost of process equipment" and "sharpening drill bits". The equipment management group sorts out the scrapped spare parts, establishes an account of the usable scrapped spare parts, and analyzes the feasibility of using the scrapped spare parts before maintenance. Count the non-critical spare parts that are easy to make, list the self-made spare parts, and make the non-critical spare parts that are easy to make on the self-made equipment and tools to ensure that the service life and performance of the equipment and tools will not be affected after using the self-made spare parts or reusable spare parts. In the process of maintenance, if this part of spare parts is damaged, it should be given priority; At the same time, the daily maintenance of equipment and tools is strengthened, and the key equipment and tools are maintained once per shift, which reduces the unconventional damage and wear of equipment and tools and saves the maintenance cost for the company.
In the bit grinding scheme, the equipment management team cooperates with technicians to improve and debug the equipment, and the customer service needs to repeat the difficulties of tool alignment. In the absence of standard tool alignment method and only relying on experience, they actively learn from it, and with the cooperation of Qi Xin, the grinding speed and quality of the drill bit are greatly accelerated. At the beginning of the project, 50 bits will be ground every month, which is 1/8 bits. Now, with sufficient personnel,
Six, patent project R&D declaration plan
The equipment management team actively responded to the provisions of our company's document No.20-07, and put forward the special schemes of the patent projects of "an automatic data acquisition instrument for airfoil angle" and "a tool to prevent electrical connectors from being unplugged by mistake". This year, the application of the project "Automatic data acquisition instrument for airfoil angle" has been submitted, and the physical product has been made, which has been verified by 102 and has been used in the field. The patent drawing of the project "A Tool for Preventing Misinsertion and Plugging of Electrical Connectors" has been completed and is still under examination and approval.
Seven. Promote the construction of the company's internal control system
In the process of promoting the construction of the company's internal control system, the equipment management team earnestly performed their duties, successively completed the document review and issuance of the Regulations on the Management of Fixed Assets and the Regulations on the Management of Construction in Progress, and completed the preparation of the internal control compliance diagnosis table, the preparation of the process framework, the preparation of the flow chart and the filling of the process risk points on time and with good quality.
Eight. Acceptance of equipment, tools and facilities
This year, the acceptance of heavy-duty battery forklift, crane crane, weak current monitoring system, pipeline leak detection and maintenance project, hangar gate and new logistics warehouse equipment and facilities was completed, and all new tools and spare parts of the company were accepted. The equipment management team conducts acceptance in strict accordance with relevant laws, standards, technical agreements and contract requirements, and puts the interests of the company first. When the acceptance standard is different from the arrival standard, the equipment management team can take the initiative to contact the supplier for maintenance.
Nine, team building
According to the requirements of the department, the equipment management team strictly abides by the company's performance appraisal methods to ensure fairness and justice. Every employee can actively and optimistically integrate into the company, be good at communicating with team members, have good team cohesion, get along well with team colleagues, be willing to help colleagues, actively resist or not participate in bad phenomena, actively promote the positive energy of the team, and actively assist in completing non-post work when the temporary tasks of the department are heavy, without overstepping the mark. Qi Xin cooperates to complete every task arranged by the company.
Insufficient
The equipment management team should constantly strengthen the study of management theory knowledge, improve their theoretical literacy, self-cultivation and equipment management ability, so as to better carry out their work and do their best for the company's development; Work should be busy but not chaotic, pay close attention to the equipment and tools that affect the on-site production and wing delivery, and make various preparations in advance; There is inefficiency in external maintenance and calibration work, and the next step should be to negotiate with company leaders on how to improve maintenance efficiency.
Eleven, the main work in _ _ _
1. Continue to put safety management in the first place, establish the idea that safety production will always be our weak link, and firmly establish the consciousness that "inadequate training is a major safety hazard".
2, step up preparations for preventive maintenance.
3, strengthen professional knowledge training, important operations to be managed and operational procedures controllable, any major work must have a plan.
4. Do a good job in special care and fault analysis of key equipment and tools, further optimize the operation, and ensure the smooth and continuous operation of equipment and tools.
5. Establish the concept of cost, improve the awareness of energy saving, standardize the economic analysis and operation control of the team, continue to strengthen the detailed control of the expenses of the equipment management team, arrange the expenses reasonably, and use the limited funds on the cutting edge.
6. Actively adopt new materials, new technologies and new methods, carry out public relations and transformation on the existing technical problems that restrict the development of production, improve the production efficiency of equipment and tools, reduce the energy consumption and maintenance costs of equipment and tools, and ensure the continuous operation and stable and safe production of equipment and tools.
7. Pay attention to the training of maintenance and calibration technicians and team operation backbones, and create opportunities to learn advanced management experience and the application of new technologies from surrounding units.
In short, only by taking the company as the center and thinking about the work everywhere can we further improve the management of equipment and tools, improve the work level, further mobilize the initiative and enthusiasm of the equipment management team, enhance the execution, and implement the conscientious team culture. With the rapid development of the company, the requirements for the equipment management team will be higher. In the future work, I will actively learn all kinds of knowledge, strive to improve the quality of all personnel in the equipment management team, achieve high standards and strict requirements, improve business skills, manage, use and maintain equipment and tools well, nip the failures and hidden dangers of equipment and tools in the bud, ensure the normal and smooth production, and make my own contribution to the better and faster development of the company.
3. Technical summary report of equipment work
In _ _ _ _ _ _ _ _, under the correct leadership of the leaders of the construction company, I seriously implemented the equipment and facilities management measures of the group company and Luqiao Company, and closely focused on the work policy of "people-oriented, honest and trustworthy, hard and pragmatic" of Luqiao Company, strengthened management, made pioneering efforts, and did all the work well. As the new project department of advanced sewage treatment plant was established in _ _ _ this year, I am responsible for the equipment management of the construction company and the mechanical equipment management of the project department of advanced sewage treatment plant. Since August, he has temporarily served as the head of the safety equipment management department of the project department of the advanced sewage treatment plant. Because there are many jobs in charge, the work pressure and difficulty are naturally great. However, with the care and support of the branch leaders and relevant departments, I worked hard to learn the knowledge of construction machinery and equipment management and hse safety management of project construction, and tried to do a good job in equipment management and hse safety management of the project department and advanced sewage treatment plant of the construction company. _ _ _ _ _ _ _ _ _ _ _ _ _ _ The equipment management and hse safety management of the project department have achieved good results _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
1. Comply with the company's laws and regulations.
Over the past year, I have abided by the national laws and regulations and the company's rules and regulations, carried out the relevant instructions of my superiors and the company, and completed my job according to the deployment of the company's production coordination department and branch leaders. At the same time, seriously study relevant business knowledge, and strive to improve their business knowledge and work ability.
Second, in terms of equipment management, I will start with the basic knowledge (principle) of the most basic mechanical equipment and construction machinery.
From _ _ _ _ _ to _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Learn as much as possible and master some basic knowledge about their performance, maintenance procedures and basic operating procedures. I spent nearly _ _ _ hours at noon and evening studying the knowledge of mechanical equipment management. While studying, I will apply the equipment management knowledge I have learned to my work practice, which will benefit me a lot. Adhere to the self-defined daily inspection system, and inspect the equipment and construction machinery in use every morning. Check the implementation of operating procedures and maintenance procedures by operators of equipment and construction machinery. And solve the problems found in time.
In the past year, the specific items of equipment management are briefly described as follows:
1. Check _ _ mobile welding machines, _ _ motor dumpers, _ _ transport motor vehicles, _ _ loaders, _ _ cranes, AC and DC welding machines and other construction machinery. Find the problem _ _. Supervision and rectification qualified _ _ _. Check the implementation of equipment, construction machine operation, inspection records, equipment management system, equipment operation procedures and equipment maintenance procedures _ _ times. Find out the unqualified items _ _ _ times. Supervision and rectification qualified _ _ _. Make sure that there is no hidden danger of braking safety for motor dumpers, transport motor vehicles, loaders and cranes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
2. Organize a training for the operators of equipment and construction machinery. Train operators in the management system, operation procedures and maintenance procedures of equipment and construction tools, and fill in the records of files, operation, inspection and maintenance correctly. The number of operators participating in the training has reached _ _ _ _.
3. Organize the on-site emergency repair of machines and equipment, and solve the mechanical equipment failure on the construction site in time. Ensure the normal operation of mechanical equipment and construction tools during construction. Put an end to the occurrence of safety accidents during the driving of equipment and construction tools.
4. Carry out dragnet investigation and statistics on the hidden dangers of the equipment and construction machinery being used by the branch, and eliminate the faults and hidden dangers of mechanical equipment in the bud. Due to the timely elimination of hidden dangers, the auxiliary equipment and construction machinery are ensured to run without safety accidents all year round.
5. Prepare _ _ _ _ copies of equipment and construction tools account, annual equipment purchase plan, equipment statistics, monthly equipment accident report, equipment maintenance plan, equipment technical performance, equipment maintenance application, etc. The basic information of equipment management of Jian _ _ _ _ company and advanced sewage treatment plant project department has been improved, and the management of equipment and construction tools of Jian _ _ _ _ company and advanced sewage treatment plant project department has been strengthened.
4. Technical summary report of equipment work
In order to strengthen the management of audio-visual education and improve the application level of audio-visual education equipment, according to the work arrangement, the audio-visual education information center carried out information technology teaching lectures, research, general survey and maintenance of audio-visual education equipment and special room training in primary and secondary schools in the middle and late days of. In this activity, * * * investigated _ _ many schools, attended _ _ audio-visual classes, distributed _ _ many questionnaires, and repaired _ _ many sets of audio-visual teaching equipment. The relevant information is summarized as follows: 1. Leaders attach importance to it and the system is sound.
Most school districts and public schools can recognize the importance of audio-visual education, and the school has formulated the work plan of audio-visual education, the school-level information technology training plan and the management system of each professional room in combination with the teaching practice. In this activity, most principals can actively prepare, and carry out their work in the form of research or lectures in view of the existing problems, and implement the responsibility of people and bind them, which has received good results. Responsible persons accompanying the investigation of audio-visual equipment are: _ _, etc.
Second, the equipment management in place, the use of norms
The audio-visual equipment of most units can be used in the designated special room, registered, incorporated into the fixed assets sequence, and designated persons are responsible for management. The special classroom equipment has good protection, high utilization rate and detailed use records, which gives full play to the role of audio-visual education equipment. Number and classify the audio-visual equipment, register them one by one, and establish an "ID card". Audio-visual teaching resources in most units can be continuously enriched on the original basis, and the utilization rate has been greatly improved. The professional quality of professional room managers has been greatly improved in their work.
Units that do well in equipment management are: _ _ _ _ _ _. Schools with high equipment integrity rate and utilization rate are: _ _ middle school, etc.
Third, the information technology teaching has a good order and a strong atmosphere.
Most schools can offer information technology courses above grade three according to the requirements of the information technology syllabus. Information technology teachers can arrange courses with lesson plans and exercises after class. The computer classroom has a computer register with detailed records, which are consistent with the teaching progress. In the classroom, students are scrambling to answer questions, and the teaching methods of group cooperation, group one, good grades and poor grades create a good learning atmosphere. The units offering information technology courses are: _ _ primary schools, etc. Teachers with strong sense of responsibility, good professional ability and good classroom effect are: _ _ _.
Four. Existing problems and phenomena
1. The leaders of individual units don't know much about audio-visual education, and there are no corresponding management systems and measures. The main manifestations are: no work plan, no special classroom system, incomplete files and incomplete records. Insufficient attention is paid to audio-visual knowledge training and the use of audio-visual equipment, and the measures are ineffective. Some leaders can use it more or less, dare not use it, refuse to use it, and are afraid of using it badly and wasting electricity.
2. Equipment management in individual schools is not in place. For example, the equipment of the special room is not used, misappropriated and borrowed, the sanitation of the special room is poor, and even the roof of some units leaks rain, and the equipment is "bathed".
3. In the maintenance of audio-visual teaching equipment, some schools have the idea of "waiting for help", and the damaged equipment can't be repaired in time and can't provide services for teaching normally.
5. Technical summary report of equipment work
Configuration protection is a project to prolong the normal operation cycle of configuration and minimize the incidence of common obstacles. Therefore, we must have an excellent team with the spirit of "intensive repair and careful inspection", and the degree of repair is above the intermediate level. At present, there are only 1 senior workers and 3 intermediate workers in the protection class, and other protection employees are junior workers. Therefore, when the initial nursing class was just established, I helped the monitor to conduct targeted training and practice on the details and requirements of protective work for two months, so as to consolidate the skills of protective staff, such as data backup and standardization of agm, tvm and bom. In order to better help the opening of Line 3 and Line 4, we have trained the configuration of Line 3 and Line 4 for one month, expanding the knowledge of employees and quickly adapting to the local environment wherever they go.
In July and August, the monitor of each inspection and repair work arrived at the post for internship in batches. In the protection work, they put forward many valuable reform opinions on the work and management of this class. Whenever they launch, I will collect transcripts in time, because this is a bridge similar to protection and inspection.
The working class holds regular meetings twice a month. Before the regular meeting, I will summarize the meetings held in the past two weeks to protect the working class and launch related events of concern, and set up my own blog on Sohu's website, which involves the meeting summary of the working class and the surface of initiating working class management by myself, so as to share the working class's experience, skills and management with others, and strive to integrate humanized China management into the management of the working class.
In order to better help each other with the work and development of 6s, I study articles about 6s in my spare time to improve my understanding of 6s and rational use. Now, the protection of shift has ended the related 6s contents, such as: standardized and fair placement of tools and instruments, the model of shift computer files, and the joint identification of folders, tools and instruments, consumables, spare parts, cloakroom and cabinets.
It is worth mentioning that Deng Yiting really participated in the afc testing workshop in Zhujiang New Town, and every time she went, she got a lot of inspiration for 6s improvement! In particular, the fair placement of computer electronic files in shifts, in addition to classifying files and archives, also lists the file storage pictures of several shifts of computers, which can clearly show the placement position of this computer electronic file and reduce the time of blindly looking for relevant data to enter the tense report.
Because there are many protection classes, class activities are basically once a month, one is to link the friendship between colleagues, and the other is to reduce the pressure on employees at work. Every activity can be successfully concluded.
I hope that in 10, the confusion, continuous development and reform of 09 work report management can make the employees in the protection class feel the second healthy and warm family.