structure chart
65438+
2. Structural construction: steel bars are processed centrally and bound on site. The formwork is made of bamboo plywood and supported by wood. Concrete is mixed on site and transported to the site by dump truck for pouring.
3. Time plan: the construction period is 60 days.
Construction preparation work
1, measuring unreeling, and determining the position of this project according to the axis position and elevation of the original fence.
2, organizational learning, familiar with the construction drawings, understand the design intent, to do a good job of design disclosure and the blue prints.the design.
3. Organize the training and study of construction technicians and operators, and make classified disclosure.
4. Prepare the detailed rules for the implementation of construction schedule control, decompose the project schedule control objectives, clarify their respective responsibilities, and ensure the construction period.
5. Prepare detailed rules for the implementation of project quality, determine quality control points, decompose construction quality objectives, establish a construction quality assurance system, and prepare work instructions for special parts such as measuring and setting out.
Main engineering construction methods and technical measures
A, basic engineering
1, construction technology
Site leveling → positioning and setting out → foundation trench excavation → formwork erection → pouring concrete strip foundation → inspection and acceptance → formwork removal → backfill soil → moistureproof layer → foundation acceptance.
① Among them, the earthwork excavation process is as follows:
Positioning survey-burying axial pile-spreading excavation line-manual digging-foundation trench inspection-foundation abnormality treatment-and entering the next process.
2. Key points of construction
1) The earthwork volume during earthwork excavation shall be piled up near the site for backfilling.
2) During excavation, surveyors should level the site at any time, and nail elevation control piles on the pit wall, so as to grasp the excavation depth at any time and prevent overbreak.
3) When excavating, find out the distribution of underground pipelines in advance and handle them properly.
4) During earthwork construction, attention should be paid to the safe use of construction machinery, and maintenance should be carried out before entering the site. During excavation, other operations are not allowed within the working scope of the excavator. When loading soil, the driver should leave the cab, and it is forbidden for anyone in the trunk to load soil.
② This project is C20 concrete.
After the foundation axis size and basement elevation are accepted, the measuring and setting-out personnel shall mark the elevation control line of 400mm thick concrete epithelium in time. Before concrete pouring, check whether the size and shape of cushion are correct and whether the formwork support is firm. When pouring cushion concrete, assign personnel to randomly check the quality of commercial concrete at any time. The concrete surface shall be leveled with a scraper, and then leveled with a wood trowel for calendering. During construction, samples shall be taken in time and test blocks shall be reserved.
③ Earthwork backfilling
After the foundation project is completed, earthwork backfilling shall be carried out after the acceptance of the quality inspection station.
1) process
Grassroots cleaning → soil quality inspection → layered soil spreading and harrowing → compaction → compactness inspection → trimming and leveling → acceptance.
2) Construction method
Before filling the soil, the garbage and other sundries at the bottom of the foundation trench should be cleaned up. Before backfilling the foundation, it must be cleaned to the elevation of the bottom surface of the foundation to remove loose garbage, mortar, stones and other sundries.
Check whether there are sundries in the backfill, whether the particle size meets the requirements and whether the water content is within the control range. If the water content is high, measures such as loosening soil, airing and mixing dry soil evenly can be taken; When the water content of backfill soil is low, measures such as watering and wetting in advance can be taken.
After the completion of filling, the surface shall be leveled by pulling wires, and the places exceeding the design elevation shall be leveled by lines in time, and the places below the design elevation shall be filled and compacted.
3) Quality standard
Main control items: the allowable value of elevation deviation is-30mm, and the layered compaction coefficient meets the design requirements.
General project: Backfill materials must comply with design or construction specifications, layered thickness and water content should comply with design or construction specifications, and the allowable deviation of surface flatness is not more than 20mm.
Second, the fence project
Pay-off → formwork support → cast-in-place concrete foundation → maintenance and formwork removal → bricklaying column → installation and fixation of wrought iron railings.
(1) foundation cushion concrete
During the construction of foundation concrete, the concrete cushion and surface must be cleaned, and no water or soil can fall into the groove. When the side formwork is supported on the foundation pit wall, attention should be paid to the stability of reinforcement. The formwork support rod cannot be directly supported on the soil wall, and the support lower mouth must be supported on the dense soil layer with a cushion block to prevent the formwork from running off when pouring concrete. The formwork of foundation beam can be strengthened by diagonal bracing and opposite bracing, and the width of bayonet reinforcement or special angle steel at the upper mouth of beam body should be limited.
When pouring foundation concrete, no construction joints shall be left.
(2) Brick foundation
Before the construction of brick foundation, when backfilling the side of foundation beam, soil should be avoided from scattering on the foundation beam. If so, the foundation beam should be cleaned up, the center line and sideline of the brick foundation will pop up, a layer of cement mortar will be laid to level the local unevenness of the foundation beam upper wall, and then the brick wall will be built. It is also possible to fill the soil after the brick foundation is laid, so as to keep the original concrete surface clean during the brick foundation laying stage and further ensure the laying quality.
Third, the main structure engineering
1, wall engineering
Masonry materials for this project:
Brick for wall building: building materials:
MU 10 cement is used for condensation, M7.5 cement mortar is used for masonry, and gray-white cultural stone is pasted outside.
(1) Materials used in masonry engineering must be tested before use, and unqualified materials are strictly prohibited.
(2) Masonry mortar: the variety and label of mortar must meet the design requirements. Yellow sand shall not contain sundries. To use tap water, the impurity content of yellow sand should be controlled below 3%.
(3) Construction preparation: Before laying, bricks or blocks must be soaked in water, but they must not be too wet or uneven.
(4) Before laying, the mortar sundries on the surface of the base must be cleaned, watered and moistened, and placed at the same time; Before laying, the pipes and embedded parts at the mouth of the cave shall be reserved according to the design requirements of drawings.
(5) We should operate in strict accordance with the construction specifications of brick masonry, calculate the skin number and mortar joint thickness of this layer of brick according to the height of floor slab, window sill and window top, pop up the wall axis at the construction site, set up a number of skin rods, control the mortar joint thickness to control the height of masonry, and use seven-divided bricks or small-sized blocks to cooperate with the whole brick to build corners and wall ends to achieve the purpose of staggered joints.
(6) When masonry meets mortar joint, the surface of mortar joint must be cleaned, watered and wetted, and filled with mortar to keep mortar joint straight.
(7) When repairing the wall, check the corrosion of Rachel. If the corrosion is serious, tools such as wire brushes must be used to remove rust before the building is concealed.
(8) Do mortar test blocks according to the specification requirements, and conduct tests on schedule.
(9) Both internal and external scaffolding adopt mobile temporary scaffolding.
Key points of construction:
Before the installation of wrought iron fence, it is necessary to ensure that the concrete bearing is formed and the position of embedded parts is correct. The finished wrought iron should also be paid attention to during transportation, and it should not be forcibly deformed and distorted. When installing, put it on the shaft and fix it firmly.
2, steel engineering
1.2. 1 reinforcement processing
A, steel bar in the field reinforcement workshop (see construction general layout) centralized processing, production should pay attention to whether the shape of the steel bar is correct, no warping uneven phenomenon on the plane; The clearance of the hook at the end of the steel bar is not less than 2.5 times the diameter of the steel bar; There must be no cracks at the bending point of the steel bar, so the steel bar above the second level cannot be bent and then bent back; The allowable deviation after reinforcement processing and molding is10.5 mm, and the side length of stirrup is 5 mm.
B, each batch of steel bar mechanical properties test in accordance with the provisions, qualified rear can processing and binding. The inspection must witness the sampling, otherwise it cannot be used as the inspection specimen. To approach and make good molding reinforcement must be listed and piled up according to specifications and parts. Reinforced piles should be padded to prevent corrosion.
B, steel bar connection adopts binding connection,
8. 1. 3. 2 c, a bill of materials shall be prepared before binding, that is, check whether the finished steel bars are in conformity with the bill of materials; Prepare the required reinforcement pad; Draw the rebar position line at the binding site.
B, binding raft foundation reinforcement, upper and lower two layers of reinforced cross should be fastened at each point. When binding, pay attention to the wire buckle of the eight-shaped adjacent binding point to avoid the skew deformation of the mesh. The upper reinforcement of raft foundation is supported by reinforced horse stool.
C, reinforced protective layer is guaranteed by 1: 1 cement mortar as cushion block. The thickness of the pad should be consistent with the required size of the protective layer.
3 template engineering
The shaped composite steel formwork shall be adopted, and the formwork shall have sufficient strength and rigidity. Formwork shall be neatly stacked according to specifications and models after entering the factory, and the stacking height shall not exceed1.5m.
The template should be cleaned and leveled before use, and the release agent should be brushed. After form removal, it should be piled up to the designated place in time.
Template installation if you don't catch up with the shuttering, with a small amount of wood, wood surface should be scraped flat, the connection between steel and wood is firm and smooth, to prevent the concrete construction from convex and concave phenomenon.
After formwork installation, aim at the pouring point to ensure the accuracy of formwork position, verticality and surface smoothness, and ensure that there is no problem and it is fixed in time (guaranteed by pulling the top).
When the formwork is removed, the concrete strength of the side formwork can ensure that the components are not deformed and the edges and corners are complete, and the internal formwork with reserved holes can only be removed after the concrete strength can ensure that the surfaces of the components and holes do not collapse and crack; The form removal time of bearing formwork shall be strictly controlled according to the specification requirements.
4 concrete engineering
1.4. 1 concrete supply
A JGZ350 concrete mixer is set up at the site for mixing, and it is transported to the pouring site by motor dump truck.
1.4.2 concrete pouring and vibrating
The foundation concrete is poured at one time, leaving no construction joints. During construction, attention should be paid to pouring speed and thickness.
When vibrating concrete, the vibrating time of each vibrating point should make the concrete surface appear laitance and no bubbles. When using plug-in vibrator, it is forbidden to collide with steel bars, templates, etc. Should be avoided; The vibrator shall be inserted into the lower concrete to a depth of not less than 50 mm. When the surface vibrator is used, its moving distance should ensure that the flat plate of the vibrator can cover the edge of the vibrated part.
When pouring in rainy days, covering measures should be taken after concrete pouring to prevent rain from washing away mud and affecting concrete quality.
1.4.3 curing and testing of concrete
After concrete pouring, cover and water within 12 hours; The water curing time of concrete mixed with portland cement, ordinary portland cement or slag portland cement shall not be less than 7d and shall not be less than14d; For concrete mixed with additives or with impermeability requirements; Watering times should be able to keep the concrete in a wet state; Concrete curing water should be the same as mixing water.
1.4.4 concrete transportation and pouring
The foundation pouring concrete is transported to the site by motor dump truck. After the mixed concrete is transported to the site, it should be watered in time to avoid construction joints.
5 maintenance
Cover with plastic sheets or grass curtains for wet curing, and spray some curing liquid.
6 shelf project
1.6. 1 In order to ensure that the construction will not interfere with each other, external scaffolding is needed to meet the construction requirements.
1.6.2 material requirements
Scaffolding use? 48mm, 3.5mm thick steel pipe, steel pipe with serious corrosion, bending, flattening or crack is strictly prohibited;
Fasteners must use qualified Maanshan Iron and Steel Fasteners and obtain the production certificate. When the fastener clamps the steel pipe, the minimum distance at the opening should be not less than 5 mm;
Wooden scaffolding should be made of pine or Chinese fir with a thickness of not less than 50 mm, and two galvanized steel wires with a diameter of 4mm should be used at both ends of the scaffold.
1.6.3 Removal of external frame
A, demolition sequence should be carried out step by step from top to bottom, it is forbidden to work at the same time;
B, all the wall pieces should be dismantled step by step with the scaffold, it is forbidden to dismantle the whole layer or several layers of wall pieces before dismantling the scaffold;
C, when the scaffold is dismantled to the height of the last long steel pipe (about 6.5m) at the lower part, temporary supporting steel bars shall be set at the proper position first, and then the wall pieces shall be dismantled;
1.6.4 allowable deviation of scaffolding
Correct the vertical and horizontal deviation of bar at any time to avoid excessive deviation.
A, vertical deviation of vertical pole, the overall height deviation is not greater than100 mm; ;
B, the horizontal deviation of the same row of ledger does not move by 50 mm ..
7 Other requirements for scaffolding:
A, the operator must wear a seat belt in the process of erection;
B, the extension positions of the upper and lower rails are staggered within different vertical distances of the vertical poles, and the distance between adjacent vertical poles is not more than 500mm;;
C, small bar close to the stud, draped over the crossbar, fastened with right-angle fasteners;
8 masonry engineering
1.8. 1 bricklaying construction
Material requirements:
A. Brick: the variety and strength grade must meet the design requirements, and there is a factory certificate or test sheet.
B, cement: cement varieties and labels should be selected according to the environment of masonry parts.
C. sand: medium sand.
Operating conditions:
A, according to the design of pop-up fence axis.
B, according to the elevation, set a number of leather poles, and the distance between leather poles is 20m.
Key points of masonry:
A. Brick pouring: The clay brick must be watered and wetted the day before laying, and it is advisable to immerse water in all sides of the brick for 50mm, and the water content is 12%.
B, mortar mixing: mortar mixture ratio should be weighed, cement measurement accuracy should be 2%, and sand and gypsum should be controlled within 5%. It is recommended to use mechanical stirring for not less than 65438 0.5 minutes.
C. Mortar: The following requirements shall be met:
D, after 28 hours of standard curing and hardening, should meet the design requirements of strength.
E, mortar in transportation and use, shall not produce bleeding, stratification, segregation and other phenomena, to ensure the uniformity of mortar composition.
Operating conditions:
A, on-site brick storage site should be compacted, smooth, no water, should be neatly packed. Handle with care during shipment to avoid damage and minimize secondary transshipment.
B, according to the wall size and block specifications, reasonable arrangement of masonry typesetting design, as far as possible to reduce the amount of on-site cutting. C, corner, block should be divided into skin bite, staggered build by laying bricks or stones.
D, masonry horizontal mortar joint thickness is generally 8-65438 02 mm; The width of vertical mortar joint is generally 8- 12mm.
Fourth, the paint project
The wrought iron fence must be well protected against corrosion and rust. Therefore, every dead corner and every gap should be carefully handled during painting and welder construction. Brush one coat of antirust paint and two coats of silver powder paint. Before painting, the paint must be stirred evenly (to prevent the pigment from precipitating during storage) and adjusted to a suitable viscosity. Generally speaking, judging by experience, 30-50 drops of paint flow naturally every minute after being lifted with a brush. Brush less, from top to bottom, from left to right, from inside to outside, from oblique to straight, from difficult to easy, from vertical to horizontal. Pay attention to the last brush: the vertical plane should be carried out from top to bottom; For horizontal surfaces, it should be carried out in the direction of light irradiation.
Main construction methods of cast iron railing installation project
The first section approach quality inspection
1 After the railing enters the site, organize the relevant personnel of the construction unit to carry out acceptance inspection, check the certificate and other documents, and check whether the geometric dimensions are accurate. Products that do not meet the quality requirements are prohibited from entering the site.
2, check the quality of asphalt coating, whether there is a brush or spray brush frequency does not meet the requirements.
Section 2 Installation Method
Clean up the sundries on the capping beam, check the dimensions, install the cast iron guardrail on the capping beam and fix it firmly, and fill the joints with fine stone concrete.
Chapter VI Time limit for a project plan and time limit for a project guarantee measures
The first section schedule
The wrought iron fence and temporary fence are scheduled to start on March 26th and end on May 24th, with a planned construction period of 60 days.
Overall measures to ensure the construction period in the second quarter
1, organizational measures:
A strong command system:
The project manager with rich construction experience is responsible for the construction management of this project. At the same time, a strong project department is set up, equipped with professional construction technical management personnel, with clear responsibilities and strict post responsibilities, which not only ensures the leadership authority of the project manager, but also pays attention to the subjective initiative of various functional departments. Qi Xin made concerted efforts to do a good job.
B, excellent construction team:
A labor reinsurance team with good reputation and high quality is one of the basic conditions to ensure that the project can be completed on schedule. Choose people who have engaged in similar projects, with high quality, good reputation and hard work style to carry out the construction of this project, so as to ensure that the project is carried out as planned.
2, material measures:
A. Adopt advanced horizontal transportation machinery: put three electric dumpers on site to be responsible for the horizontal transportation of materials on site. Accelerate the construction progress.
B, emergency measures, first of all, consider: using fire pool and underground well to store water to ensure the normal construction when water is suddenly stopped. Improve the stock exchange ability when materials are in short supply, and ensure the timely supply of on-site materials.
Quality assurance measures
1, material inspection regulations
Organize the inspection and acceptance of all raw materials and semi-finished products entering the site, and establish the account.
Raw materials that need re-inspection, such as cement, steel, steel bars, sand and gravel, various additives, covered electrode, flux, waterproof materials, etc. , must be in accordance with the provisions, timely sampling test, and submit the test report to the supervision and inspection.
2, process inspection and inspection regulations
Strictly implement the current national norms, standards and enterprise regulations, and organize the construction in strict accordance with the design requirements.
Before each subdivisional work (process) starts, technical and quality disclosure shall be made to the operation team in strict accordance with the requirements of process standards.
The "three-inspection system" is implemented in engineering construction. Do a good job of team self-inspection, set up full-time quality inspectors, supervise team self-inspection and fill in self-inspection records.
3, partial (process) after the completion of the project, organize the self-inspection and handover inspection between processes, unqualified component or process, without repair qualified shall not be carried out in the construction of next working procedure.
After the subdivisional work or process is qualified, fill in the inspection form and submit it to the supervisor and chief engineer for review and acceptance. The inspection sheet is accompanied by self-inspection, handover inspection records, hidden records, pre-inspection records, quality evaluation and other materials.
Organize and inspect the construction quality of each process in strict accordance with the "three inspection system". Be sure to check the last process to ensure that this process serves the next process. Really strictly control the process quality, and the unqualified process will not be handed over.
4, quality inspection personnel must strictly control the quality in the process of construction, in the process of construction strictly, shall not conceal the quality problems in the construction, and urge the operators to timely rectification.
Civilized construction guarantee measures
1, civilized construction to create standards and strive for goals.
Safety and civilized management goal of this project: to ensure civilized construction order with civilized construction management. According to the evaluation standard of "civilized construction site" in Chishui city, the management is carried out. Strive for this project to create a "civilized construction site" again. According to the relevant standards of civilized construction site construction, we specifically achieve: no major industrial accidents; The flow of people on the construction site is smooth, and the construction area is strictly separated from the non-construction area; Civilized construction cards shall be set up at the site, and management personnel shall take posts with Pekka; Living facilities are clean and civilized.
2, on-site facilities management regulations
2. 1, health management
(1) Go out without sediment, and don't leave things lying around along the way.
(2) The construction site is always kept clean and tidy. The road is smooth, solid and smooth, with drainage facilities.
(3) A special person shall be responsible for the hygiene work in the canteen, and the Food Hygiene Law and other relevant systems shall be strictly implemented.
(4) drinking water to ensure the supply of boiled water, drinking utensils hygiene.
(5) The toilet on site shall be cleaned by special personnel.
2.2, pollution control
(1) air pollution
Construction waste should be set in a closed temporary special garbage passage or lifted by containers. It is forbidden to throw it into the air at will, and the waste should be removed in time and sprayed with appropriate amount of water to reduce dust.
Fine materials such as cement should be stored indoors (or sealed) or tightly covered, and effective measures should be taken to reduce dust during loading, unloading and transportation.
The ground of temporary roads on site should be hardened to prevent road dust.
When mixing equipment is set up on site, dust-proof device shall be installed.
(2) Water pollution
1) At the site where concrete, mortar and other mixing operations are carried out, a sedimentation tank is set up, so that the wastewater generated by cleaning machinery and transport vehicles can be discharged into the municipal sewage pipeline after sedimentation or recycled for sprinkling water to reduce dust.
2) Control the flow direction of sewage generated by construction to prevent overflow, and set up a sedimentation tank at a reasonable position, which will be discharged into the sewage pipeline after sedimentation. It is forbidden to flow out of the construction area and pollute the environment.
3) The warehouse where the oil is stored on site should be treated for leakage prevention, and measures should be taken to prevent water from running, leaking, dripping and leaking during storage and use.
(3) Noise pollution
1) The construction site shall formulate corresponding noise reduction systems and measures according to Noise Limits at Construction Sites in People's Republic of China (PRC) (GB 12523-90).
2) When working with strong noise and vibration, strictly control the working time. If continuous operation is needed day and night, noise reduction and shock absorption measures should be taken to do a good job for the surrounding people and report to relevant environmental protection units for the record before construction.
2.3, field capacity and appearance management
(1) Closed construction shall be carried out as required, the construction area shall be fenced, the gate shall be guarded, and other personnel shall not enter.
(2) The site capacity management of the construction site shall be divided into blocks, and the responsibility area shall be marked on the list, and the living quarters management regulations of all people shall be marked on the list.
(3) Establish the management, inspection, appraisal and assessment system of the living sanitation on the construction site.
(4) Work safety in production is on the wall, with seven cards and one map (basic information of the project, name of the person in charge of the project, six cards of safety discipline, safety production counting card, ten safety technical measures, fire prevention information card, health information card and site construction general plan).
(5) Set up safety signs and warning signs on site to ensure no violation.
(6) Hang signs in the construction area, office area and living area, and set up safety warning signs in dangerous areas. Set up traffic signs on the main construction roads.
(7) Ensure that the surrounding environment is clean and sanitary, so that there is no sewage overflow, muck, materials and garbage piled up outside the fence.
(8) Clean environment and smooth ditches. Domestic garbage is transported out in woven bags every day, and the living quarters are regularly sprayed with potions to sterilize and kill insects.
2.4, temporary road management
(1) Assign a special person to take charge of the command before entering and leaving the vehicle.
(2) The on-site construction road is clear.
(3) Do a good job in drainage facilities, and there will be no water in the site and roads.
(4) Make a temporary service road before construction. The pavement of temporary construction access road is higher than the natural ground, and a drainage ditch is set outside the road.
2.5, material stacking management
(1) All kinds of equipment and materials shall be kept away from the operation area as far as possible, and shall not be piled too high to prevent people from falling.
(2) The materials entering the site shall be piled up in strict accordance with the location specified in the site layout.
(3) On-site material engineers should conscientiously do a good job in the acceptance of incoming materials (including quantity, quality and warranty) and make records (including car number, train number and transportation unit, etc.). ).
(4) The cement warehouse has management regulations and systems, and the cement is stacked in ten packages and one pile, and listed for management. Cement should be allocated according to the quota application form and the quota should be allocated. Warehouse managers should keep a detailed account of the receipt, delivery and storage of cement.
(5) Stack materials in strict accordance with the site layout to prevent littering, misplacing and mixing, especially put materials behind fences and billboards to prevent accidents such as stress collapse.
2.6, construction personnel management
The standards and requirements for building offices and toilets shall be implemented in accordance with relevant regulations.
Formulate the "Office and Toilet Hygiene Management System" to make the construction site clean and hygienic.
The office is well ventilated and bright, equipped with toilet facilities and managed by special personnel.
There is a tea supply point on the construction site, and the tea has detoxification facilities to ensure hot water supply in winter and cold water supply in summer.
In order to ensure the health of the construction staff on site, medical points were set up on site.
2.7, public security management measures
Education, improve the consciousness of the broad masses of workers to defend the project construction and abide by the law. Often carry out safety inspections centered on fire prevention, explosion prevention and theft prevention, plug loopholes, and the management regulations of the owner in social security, comprehensive management, traffic management and environmental protection. And signed a safety responsibility agreement with various professional construction units.
Establish a special safety organization to lead the safety work in a unified way. Set up a guard at the gate and strictly implement the access system. All personnel must wear badges when entering the site. Non-engineering personnel must register when entering the gate and contact the doorman before entering.
Staff are not allowed to drink or work on the spot after drinking, and are not allowed to bring contraband into the scene to ensure the safety of property and personnel.
After loading and unloading the materials vehicles to the unit, leave the site immediately and park in the designated parking lot.
Strengthen the management of valuable materials, important equipment and large equipment on the construction site, strictly implement relevant systems, and set up protective facilities and alarm equipment to prevent materials from being looted, stolen or destroyed.
Extensively carry out legal publicity and "four defenses", find hidden dangers in time, and take preventive measures to nip in the bud.
Strengthen the management of the outsourcing team, assign a special person to be responsible for educating the outsourcing team on the legal system and rules and regulations, audit and register the migrant workers involved in the construction, obtain a temporary residence permit and issue a work permit before they can take up their posts. Investigate and understand suspicious people.
2.8, measures to prevent nuisance
Reasonable site layout, and increase the necessary environmental protection measures and environmental protection to reduce the harm to the surrounding environment.
Assist the owner to coordinate the surrounding environment and ensure the normal operation of the project.
Set up a public relations coordination department to strengthen cooperation with community neighborhood committees and police stations.
Take the responsibility of general contracting management for possible nuisance problems, and be fully responsible for coordinating all aspects of work.
Before construction, register with the environmental protection monitoring station and accept environmental monitoring at any time.
Before entering the site for construction, get in touch with the local government and neighborhood committees, invite representatives of surrounding units and residents to participate in symposiums and press conferences, inform the general situation, nature and construction significance of the project, actively listen to the opinions and suggestions of surrounding units and residents, and try to adopt reasonable construction schemes to reduce the impact on the surrounding environment. And get the support and understanding of the influence of surrounding units and residents on the project construction.
Take corresponding necessary remedial measures for units and residents affected by construction noise, strong light and dust. At the same time, take effective preventive measures to reduce these hazards and protect the interests of surrounding units and residents as much as possible.
Set up a leading group for handling and coordination within the project system. Civilized standardization management team has designated personnel to deal with disturbing people, so as to find and solve problems in time.
The special process exceeds the environmental protection requirements of continuous construction and night construction, so please ask the relevant competent department for approval. And cooperate with the local government to coordinate the work of local residents.
2.9, reasonable layout of the site and mechanical equipment, using new mechanical equipment with low noise. The lighting layout of the construction site should be as far away from residential areas as possible.
For more information about bid writing and improving the winning rate, click on the bottom customer service for free consultation.