Summary of greening and cleaning work
Summary model essay on greening and cleaning work

Time flies, and a period of work has come to an end. Looking back on the work during this period, we must have made a lot of achievements, so we should make a good summary. Are you still worried about writing a work summary? The following is a summary essay on greening and cleaning that I have carefully arranged, for reference only, and I hope it will help everyone.

Summary of Greening and Cleaning Work 1 1. Greening Work

At the beginning of the work, the time to face the problems is tight, the workload is heavy, there are many maintenance work and many problems left over from the project, which brings great difficulties to the greening work. Basically, large-scale maintenance work is carried out simultaneously in the whole process, which leads to the problems of secondary pollution and repeated cleaning in the completion of greening work. There is no doubt that the water is not boiled, which has a great influence on greening. However, under the leadership of Manager Wang of the Property Department, through various communication, the construction waste was cleared away, and I arranged for a small amount of construction waste to be cleared by land reclamation personnel. In addition, I temporarily borrowed fire water through coordination. Overcome many difficulties and complete the greening work.

Second, the daily cleaning work management

As a grass-roots worker, there are many problems in company cleaning, such as older age, lower quality and greater mobility. The working environment is wide and the conditions are harsh, and the area under everyone's jurisdiction is also large and the task is heavy. Within the company, provide training on cleaning tools, cleaning skills and knowledge, organize oral examinations one by one on a regular basis, and implement PK to ensure everyone to improve as soon as possible. Similarly, in the daily work of cleaning staff, we pay more attention to their rest and diet. Every employee will send birthday cards and bonuses on their birthdays, so that everyone can work with peace of mind. In the case of insufficient personnel, the department cleaned the garbage after the household cleaning construction in time and cleaned the house for more than 350 times; During the cleaning and maintenance period, the construction waste in the public * * * area was piled up 1000 times, so as to ensure the sanitary requirements of the owner indoors and in the public * * * area before moving in.

At the same time, combined with the detailed rules of actual work, summarize and constantly modify various cleaning rules and regulations in daily work. It has successively updated the company's cleaning operation instructions, formulated and revised a series of management regulations, detailed rules and specific measures, so that the management division of labor is clear and the responsibility lies with people. According to the field situation, the post division, work flow, responsibilities, safety operation norms, emergency plans and other contents of cleaning personnel were formulated. Similarly, in order to check the work of employees at any time, the supervisor of the outsourcing company fills in the working day report and the cleaning patrol checklist I fill out every day.

I will summarize the daily work of employees, find problems and rectify them, and communicate with the security supervisor and greening personnel in time to supervise each other, so as to make up for the fact that I am the only one patrolling and checking in the cleaning department. Understand their work and quality through records and lists, so as to be well aware and well documented, and keep them on file for future reference. Work closely with customer service department to deal with the cleaning problems at home and take corresponding measures in time. Communicate and cooperate with other departments to successfully complete the reception task of each visit and inspection by superior leaders.

Third, regular disinfection work.

In the routine disinfection work, the company proposed to purchase drugs and equipment by itself, arrange personnel to collect information and consult professionals, and make a set of operating procedures and a list of drugs and equipment suitable for the current situation of the project, which saved the cost. At the same time, it cooperated with the mosquito killer installed in the garage and the weekly disinfection frequency, and achieved due results, and made written records for archiving. Gradually improved the environmental problem of mosquitoes in the park garage.

Fourth, garbage removal.

In the early stage, the garbage removal was mainly based on engineering garbage. With the increase of the occupancy of the owners and the daily work of the decoration households, domestic garbage also joined in.

Looking back on the work in the past six months, with the help and care of the superior leaders, although some achievements have been made, the cleaning work in the park has been on the right track. However, there is still a certain gap with the requirements of leaders at all levels of the company, and the management level and communication ability are still lacking. Sometimes things are not calm enough, and sometimes rushing for success will be counterproductive. These shortcomings require me to strengthen my study, guide my work with what I have learned, and strive to repay the trust of leaders with better results.

In the new year, I will strive to do the following with more enthusiasm and positive working attitude:

1, personnel added, leaving a radish and a pit.

2. Strengthen communication to improve cleaning service quality and work efficiency, strengthen training in all aspects, and improve the overall quality of employees.

3. Strengthen the cleaning of vacant buildings, at least once a month. Health inspection and building inspection in each area should be statistically and finely managed.

4. Do a good job in the first phase: afforest Huazheng, East District and West District, cultivate professional green chemical industry, and equip each district with designated personnel.

5. Improve the company's clean image and establish a good reputation for the company.

Please supervise and correct the above report.

Summary of greening and cleaning work 2 1, personnel management

After the night shift of cleaning, employees' mood fluctuates and it is very difficult to carry out their work. Therefore, under the premise of not affecting the quality of work, we should communicate with employees in various ways to stabilize their emotions. According to the work requirements of each post, we should rationally allocate personnel, assess the workload, strengthen the characteristics and requirements of actual operation, and adjust the shift and duty time, so as to basically meet the requirements of cleaning operation without increasing the number of personnel.

At present, there are 0/4 employees/kloc, and 9 people have left and transferred jobs this year.

Among them, the reservoir area was transferred 1 person, and 8 people left their jobs.

Step 2 cultivate

Train new cleaning staff in different positions in cleaning theory and practical operation, so that cleaning staff can master cleaning knowledge and meet the requirements of office cleaning.

On the premise of training cleaning staff in cleaning manual, combined with the actual situation in the work, the following training is focused on: classification and use of cleaning agents, cleaning procedures, cleaning stainless steel ornaments, cleaning furniture, cleaning ashtrays, cleaning wallpaper, cleaning and maintenance of elevators, and handling rust.

We have strengthened the training of staff assessment system, excellence and standards implementation, and established the sense of responsibility of staff. At present, employees have been able to work hard and complete according to the prescribed standards, but they still need supervision and management in observing work discipline, behavior and other details. The next step is to strengthen this kind of training and make it a habit.

After continuous training and running-in, the cleaning staff has adapted to the existing management methods and workflow, and the staff is basically stable.

3. Cleaning work mode.

Under the guidance of the leaders of the group company, "unmanned cleaning" and "natural cleaning" have achieved good results.

On the basis of the original day shift, it is divided into two shifts, and the main cleaning work is carried out at night shift. In order to ensure the sanitary quality while implementing "unmanned cleaning", the frequency of cleaning inspection has been strengthened. With the existing staffing of 7F- 16F, a cleaner can basically solve health problems at any time within 30 minutes. However, during the rush hour 1 16f, it often happens that the cleaning staff 1 hour can't enter the men's bathroom, which leads to the dirty toilet.

In the aspect of "natural color cleaning", the cleaning frequency has been strengthened, from the original fixed planned cleaning to cleaning at any time. When dirt is found, it should be cleaned immediately to restore the original natural color, which has achieved good results, but the cleaning cost has increased. Recently, due to the construction of the second floor and municipal roads, the overall environmental dust is relatively large. Although cleaning has been strengthened, the overall sanitary condition has not met the requirements, and the cleaning cost has increased. After the construction is completed, it will be thoroughly cleaned to meet the hygiene standards.

In order to ensure that the elevator carpet hygiene meets the standard requirements, vacuum every 20 minutes.

4. Completion of cleaning work

(1) Complete the establishment of cleaning staff and timely correction of working mode.

(2) Complete the daily sanitary maintenance of the public areas of the building.

(3) Complete the land reclamation of the newly settled floor.

(4) Complete the stone crystal hardening treatment and carpet maintenance of the building.

(5) Complete the removal of construction waste.

(6) Finish the second cleaning of the external wall of the building.

(7) Complete the peripheral ground scouring work.

(8) Clean the B 1 parking lot twice a month. (Not responsible for daily cleaning)

(9) Complete special cleaning service. Secondary crystal surface treatment of stone floor in reservoir area and cleaning of carpet, bedside and sofa. Clean the carpet on the third floor.

(10) Finish waxing and maintenance of wood every quarter.

5, greening work

In May, about 100 plants of green plants were purchased in the building, and the office and lobby grew generally. In other places, due to insufficient sunshine and humidity, especially poor ventilation, there are many green plants and pests, and most of the plants in the elevator hall die. Others barely survived, but they had no ornamental value. Efforts should be made to overcome unfavorable factors during maintenance, so as to change soil every two seasons, increase nutrients, kill insects in time and focus on maintenance for a certain period of time. Hawaii coconut successfully bred two. It is suggested that outsourcing should be considered for indoor greening in 20xx to ensure the ornamental of plants.

Summary of Greening and Cleaning Work 3 Since the beginning of this year, our unit has achieved remarkable results in all aspects of work in accordance with the development ideas of revitalizing the three major economies and promoting the three major goals put forward by the municipal party committee and the municipal government, unifying thoughts, rallying strength, pioneering and enterprising, and working in a down-to-earth manner. Now the greening work in 20XX and the work plan in 20XX are reported as follows.

First, the landscaping work in 20XX years

According to the task of urban landscaping determined by the city's economic work conference this year, our unit undertakes the creation of a national garden city. At present, the establishment of national garden city has been completed, and it has entered the stage of upgrading and consolidating achievements.

(A) public * * * greening construction

This year's greening construction task will increase the greening area by 200,000 square meters. At the end of the year, it is estimated that the city will add 210.4 million square meters of green area, including 44,400 square meters of road greening, 22,500 square meters of park green space, 6.7 square meters of residential area and unit compound, 40,000 square meters of production green space and 40,000 square meters of ecological construction.

1. Complete the greening, upgrading and reconstruction project of Xintian Road. The greening of Xintian Road isolation belt extends eastward from Leifeng Street to the second-class intersection of the original Universiade, with a road length of more than 5,000 meters and a flower pond length of more than 8,500 meters. The greening area is 24,000, and the project construction has been completed. At present, it has entered the stage of seedling management and protection. More than 0/500 flowering shrubs such as Forsythia suspensa, Lilac, Lagerstroemia indica, Mume Fructus and Pomegranate were planted in the middle flower pond, and the missing Sabina vulgaris, Euonymus japonicus, Euonymus japonicus, Rosa chinensis and Populus tomentosa were replanted to achieve the effect of blooming in three seasons and evergreen in all seasons.

2. Accelerate the implementation of the project of transforming the zoo into kings park. The park covers an area of 52 mu, with a green area of 1.97 million square meters, an artificial water system area of 1.500 square meters and a green rate of 64%. It is planned to build antique buildings, squares, water systems, cliff stone carvings, post booths, horse sculptures, tree planting, etc. in the Qin and Han Dynasties. At present, 85% of landscape construction projects have been completed, and other projects will be accelerated to freeze before the end of the construction period.

3. Complete the transplanting work of widening and greening seedlings on the sidewalk of Xintian Road. From He Huan Street to Wudaokou Road, sidewalk widening and green seedling transplantation have all been completed. At present, the engineering seedlings are carefully managed and protected, such as watering, spraying, loosening soil, pruning and cleaning up dead branches.

4. Complete the greening project of Wang Cheng Road overpass. Four flower ponds with a length of 280 linear meters and a width of 2 (see final draft for details) of Wang Cheng Road overpass were afforested. Four varieties of Euonymus japonicus, Ligustrum lucidum, Begonia and Peach were planted inside, and plants such as Cedar and Euonymus japonicus were planted on both sides of the overpass, with an additional green area of more than 3,000 square meters. At present, the management and protection stage of engineering seedlings is under way.

5. Complete replanting in spring. This spring, in order to actively cooperate with the Daxi High-speed Railway Project and Xintian Road Reconstruction Project, the missing seedlings of Xintian Road, Shifu Road, Kuaibin Street, Dayun Expressway Link, Wen Ming East Road, Beihuan Road and other gardens were replanted, and more than 70,000 trees and shrubs such as Cedar, Populus tomentosa, Sabina chinensis, Boxwood, Ligustrum lucidum and Chinese rose were transplanted.

6. Complete the installation of ornamental flowerpots on Shifu Road. In order to build a civilized demonstration road, wrought iron flower stands and flower pots were installed on the advertising poles of Shifu Road, which are currently in the maintenance stage.

(2) Social greening construction

The new green area of residential area and unit compound is 60,000-70,000. Family Planning Service Center, Fortune Home Community, Ludong Office and other social units are carrying out the management and protection of newly planted seedlings. Hui Ze Garden Phase II, Jindu Classic Phase II, Fortune Home and other greening projects have been completed.

(3) Greening management and protection work

1, to promote the transformation from garden to horticulture. In Xintian Road, Shifu Road, some street gardens, Xintian Square and Citizen Park, the native plants were trimmed and landscaped in spring, and the landscaping plants were maintained and finely trimmed in the later period, and the transformation from garden to gardening was initially tried. In 20XX, the city's hedges and patterned belts have a trimming area of more than 400,000 square meters.

2. Promote the transformation from extensive management to fine management. The Center continues to innovate the garden management mechanism in accordance with the Measures for the Management of Green Space in Garden Center, the Measures for the Inspection and Assessment of Greening in Garden Center and the Management Standards for the Maintenance of Landscaping. By taking measures such as establishing accounts at the beginning of the year, quarterly assessment, rewarding the superior and punishing the inferior, the center strengthened the management of seedlings, implemented a new standardized management model of landscaping, comprehensively improved the management level of landscape conservation, and promoted the transformation from extensive management to fine management. This year, in order to build a civilized demonstration road, our unit has carried out five times of dead branches pruning and fine pruning on street trees such as Xintian Road and Shifu Road. The litter and white garbage in the green belt were cleaned up six times, and the garbage such as intertillage weeding, loosening soil in tree holes and branches were cleaned up and managed. At the same time, urge the social greening units along the street to carry out fine management and protection of the greening of their sections.

3. Daily standardized management and seedling protection are carried out in an orderly manner. Since the beginning of this year, in order to alleviate the spring drought, in March and April, the center dispatched more than 200 irrigation vehicles, all of which started sprinkler irrigation facilities to fight drought and protect seedlings. In the spring pruning work of main streets in urban areas such as parking lots, street parks and square parks, the pruning area of hedges and patterned belts has reached more than 300,000 square meters. Diseases, aphids and grubs in Wang Qiao Street, Wen Ming East Road, Expressway Lead, Zijin Garden, Street Park and Citizen Park were prevented, and the application area was more than 200,000 square meters. The newly transplanted seedlings are mainly managed to ensure the survival rate.

4. City appearance and environmental improvement. In order to improve the city appearance and environment, the center painted more than 250 thousand trees six times. Focus on removing more than 90,000 square meters of weeds and 360 cubic meters of garbage in the green belt of Beihuan Road and He Huan Street.

(4) Construction and management of Xintian Square and Citizen Park

In terms of construction, Xintian Square (Citizen Park) has successively completed four tasks: cleaning the lake bottom, repairing the lake wall, laying landscape stones in the lake and painting the platform railings; The renovation of the stage lighting facilities in the square is completed, and the landscape lights on the periphery of the square are installed and the lights are running. * * * 28 street lamps, 26 courtyard lamps, 2 diamond lamps, spotlights 10 lamps have been installed, and 40 new light sources with pole lamps have been installed. This year, the area of replanting and transplanting of seedlings in the square is about 5000*** planting ground cover plants 1500, lawns are more than 20XX, patterns such as Ligustrum lucidum with golden leaves 1800 and shrubs are 4000. In terms of management, Xintian Plaza Management Office closely follows the general idea of scientific organization, strict discipline, clear division of labor and responsibility to people.

(five) to create provincial garden units, communities and roads.

Organize social greening units such as Beifeng Thunder, Jindu Jiayuan and Urban Pioneer to declare provincial garden units, and Universiade Expressway to declare provincial garden roads. At present, the compilation and submission of materials have been completed.

(six) strictly enforce the law and carry out greening work according to law.

Since the beginning of this year, our center has continued to strictly implement the Regulations on Urban Greening in the State Council, the Measures for the Implementation of Urban Greening in Shanxi Province and the Measures for the Administration of Urban Greening in Linfen City. Intensify the investigation and punishment of acts of destroying urban garden facilities. Up to now, the Central Law Enforcement Inspection Team has investigated (broken) more than one case of destroying greening facilities 10, which has saved more direct economic losses in 5 yuan and effectively safeguarded the achievements of urban greening construction in our city.

(seven) the work of building a clean and honest government.

1, continue to improve the system of building a clean and honest government, and earnestly implement the responsibility system for building a clean and honest government.

2. Further improve the system of punishing and preventing corruption. There are no major problems in our unit this year, such as eating and getting cards, private use of buses and cases.

3. Improve the management and use system of official vehicles. Increase the daily supervision and inspection of bus management and use, and seriously investigate and deal with illegal equipment and use of official vehicles.

4. Continue to carry out centralized rectification activities, stop the bad style of doing big things and doing big things to collect money, and continue to implement the system of declaration, examination and approval, publicity and on-site supervision of weddings and funerals. The General Party Branch of the Central Committee urged party member cadres to conscientiously implement the relevant regulations and requirements of provinces and cities on stopping weddings, funerals and celebrations, and regarded the work of stopping weddings, funerals and celebrations of party member cadres as an important part of the assessment of the responsibility system for building a clean and honest government. Grass-roots cadres and workers are punished for the problem of doing big things and causing adverse effects, and the responsible persons of grass-roots units are admonished to talk.

(eight) to carry out centralized education and rectification activities.

This year, according to the spirit of the relevant documents of the Municipal Party Committee and the Municipal Government on doing a good job in consolidating basic management and implementing centralized education and rectification activities for work responsibilities, our unit has earnestly carried out centralized education and rectification activities for consolidating basic management and implementing work responsibilities. After five stages of centralized education and rectification, through careful search and careful analysis, three outstanding problems in the current garden work are summarized:

First, the greening management is simple and extensive, and there is still a big gap with the national garden city standards.

Second, the consciousness of changing from garden to gardening in work is not enough, gardening pruning and landscaping lack artistry, and they still stay in simple pruning and green space management and protection.

Third, the management of social greening is weak and needs to be strengthened urgently. In view of the above problems, we make full use of the results of the problem-finding stage, focusing on the outstanding problems in ideological understanding, responsibility implementation, system construction, work style, etc., sort out the rectification projects in categories, fields and levels, establish the rectification ledger, determine the responsible person for rectification, and clarify the rectification time limit. In 20XX, the Measures for the Management of Green Space, the Technical Standards for the Maintenance of Green Space Plants and the Measures for the Inspection and Acceptance of Green Space formulated and implemented by our unit were revised and improved, the responsibilities of various departments were redefined, the tasks and responsibilities were further refined, and the refinement, standardization and standardization of urban landscaping work were promoted.

Two. 20XX work plan

1, speed up the implementation of Wang Cheng park construction project, and strive to put it into use before the end of 20XX.

2, the implementation of the North Ring Road (Suibin Street-East Ring Road) isolation belt greening project, Xintian East Road (Wudaokou-Fengcheng section) greening project, Xintian Road greening and upgrading project.

Around the rose party to be held in May next year, the city will plant 20 roses.

4. Strengthen the daily management and protection of existing seedlings and newly planted seedlings, and do a good job in drought and waterlogging prevention and pest control.

5. Implement the green chapter system to solve the problem of weak social greening management. Supervise and guide all units and residential areas to do a good job in greening courtyard greening and residential areas, and vigorously carry out activities to create municipal garden units and garden communities.

6. Drawing lessons from Changzhi City's landscaping management mode, combining the experience and ideas of observation and learning, gradually establish a long-term mechanism of landscaping management with clear division of labor, strong supervision and scientific norms, further promote the two changes of landscaping from extensive management to fine management, and comprehensively improve the management level of landscaping construction.

;