What information do you need for self-built construction?
Question 1: What do I need to provide to apply for construction? 1. Written report, power of attorney of legal person, and client and client's ID card;

2. Construction Application Form in duplicate;

3. The approval document of the development and reform department;

4 "State-owned Land Use Right Certificate" (provided by real estate development projects);

5 "Construction Land Planning Permit" (including approval form and attached drawings);

6 "Construction Project Planning Permit" (including approval form and attached drawings);

7. Implementation of construction project funds (bank credit certificate or approval document, 50% of the required funds are in place within 1 year, and 30% of the required funds are in place above 1 year);

8. Design contracts for construction projects;

9. Engineering geological investigation report (stamped with the special seal for examination by the drawing examination organization);

10. Record materials for the review of building construction drawings and municipal infrastructure (including review results, review opinions and reply opinions of survey and design construction drawings, and record forms for the review of energy-saving design of civil (residential or public * * *) buildings);

1 1. Letter of Commitment on Strict Enforcement of Mandatory Standards for Building Energy Efficiency (original in quadruplicate, two copies to be returned after review);

12. Commitment to strictly implement all mandatory standards (original in quadruplicate, two copies to be returned after review);

13. Other materials specified by laws and regulations.

Question 2: What materials should be prepared for the construction application? All procedures of a construction project from project initiation to completion (including project initiation, planning and design, construction application and completion acceptance).

I. Project approval

1, project application report (one original)

2 project proposal or project feasibility study report (one copy)

3, construction land ownership documents or construction project land pre-trial opinions (a)

4, the project construction investment budget (a)

5. Capital certificate issued by the banking department (one original)

6. Copy of the business license of the enterprise as a legal person (one copy); (Qualification certificate is required for real estate projects)

7. Topographic map of the project (one copy)

8. Opinions of relevant functional departments.

Second, the planning and design

1. The Municipal Planning Bureau issues a red line for survey and design according to the overall urban planning and project documents, providing planning and design conditions.

2. Architectural design is divided into three stages, namely scheme design, preliminary design and construction design.

3. The Urban Construction Bureau is responsible for contacting relevant municipal departments for joint examination and approval of preliminary design.

Third, the construction project construction

(a) construction projects, first of all, to provide the following information to the Construction Committee for registration.

1, the fixed assets investment license issued by the planning department or the plan task book approved by the competent department;

2, the planning department issued the "construction land planning permit" and "construction project planning permit";

3 state-owned land use certificate issued by the land department;

4, in line with the project design qualification design unit design construction drawing and construction drawing design documents review and approval;

5, the civil air defense office issued the "civil air defense project construction permit";

6, the fire department issued the "building fire design audit opinion";

7, lightning protection facilities testing institutions issued by the lightning protection facilities design audit book;

8, issued by the earthquake office "seismic fortification audit opinion";

9, proof of construction funds;

10, the project budget book and the construction project category verification book issued by the cost department;

1 1, other information stipulated by laws and regulations.

(two) the construction project of public bidding, to supplement the following information to the bidding office for formalities.

1, the certificate of the legal representative of the construction unit or the certificate entrusted by the legal representative;

2, the construction project construction public bidding application form;

3. Application Form for Public Bidding of Construction Project Supervision.

(3) For the construction project invited for bidding, the following information shall be supplemented to go through the formalities in the bidding office.

1, the certificate of the legal representative of the construction unit or the certificate entrusted by the legal representative;

2, the construction project construction invitation bidding approval form;

3, the construction project supervision invitation bidding approval form;

4. Private enterprise certificate issued by the industrial and commercial department;

5. Business license of legal person;

6. Other reasons for applying for invitation to bid.

(four) the construction project directly contracted, need to supplement the following information to go through the formalities in the bidding office.

1, the certificate of the legal representative of the construction unit or the certificate entrusted by the legal representative;

2, the construction unit for the construction unit to arrange the construction project report;

3, the construction unit to apply for the report of the construction project supervision unit;

4. Private enterprise certificate issued by the industrial and commercial department;

5. Business license of legal person;

6. Direct Approval Form for Construction Project Contract.

(five) to handle the quality supervision of construction projects, it is necessary to provide the following information to go through the formalities at the quality supervision station.

1, planning permit;

2, the project construction bid-winning notice or project construction contract approval form;

3, the engineering supervision bid-winning notice or the engineering supervision contract approval form;

4, the construction contract and its unit qualification certificate copy;

5, supervision contract and its unit qualification certificate copy;

6, construction drawing design documents review and approval;

7. Application Form for Quality Supervision of Construction Project;

8. Other materials as prescribed by laws and regulations.

(six) to handle the safety supervision of construction projects, the following information shall be provided to the safety supervision station for formalities.

1, information provided by the construction unit:

(1) engineering construction safety supervision report;

(two) the bid-winning notice of the project construction or the approval form of the project construction contract;

(3) The bid-winning notice of project supervision or the approval form of project supervision contract;

(4) Engineering geological investigation report (conclusion part);

(5) Ding Gong's drawings (including plan, vertical and sectional drawings of the basement);

(6) Project budget (total construction area, number of floors, total height and cost);

2, the information provided by the construction unit:

(1) Safe production and civilized implementation ... >>

Question 3: What is the application procedure of the project? What information do you need? first step

After completing the planning and project bidding, receive the project construction application form:

1, construction project application form (in quintuplicate);

2, the construction permit application form (2 copies).

Second step

Handling construction project expenses (and paying the expenses):

1. The Industry Management Section will calculate the relevant fees and draw up the fee schedule;

2, by the Development Zone Finance Bureau accounting, fees and invoices.

Third step

Construction contract filing of construction projects:

1, and obtain relevant forms for filing construction contracts of construction projects;

2, the information provided by the construction unit (table 1);

3. Send it to the Municipal Construction Bureau for approval and publish it on the website of the municipal construction project.

Fourth step

Handle the construction permit.

The construction unit shall provide the information listed in Schedule 2.

Step five

Sign for the setting-out of construction projects.

Construction contract filing and submission materials

1, the certificate of the legal representative of the applicant and the certificate of authorization of the legal representative (1 original);

2. The client's ID card (1 copy, original inspection);

3. Two copies of the supplementary agreement to the construction contract (two copies, original inspection) (each with the official seals of both parties);

4, the contractor qualification certificate (1 copy, the original inspection);

5, the project manager qualification certificate (1 copy, the original inspection);

6, the project contractor's safety production license (1 copy, the original inspection);

7, the project manager's production safety assessment certificate (1 copy, the original inspection);

8. Personnel files of the project department of the construction unit (1 original);

9. Certificate of practice or employment of members of the project department (except the project manager) of the custody unit (1 copy, original inspection);

10, bid-winning notice (1 original);

1 1, capital availability certificate issued by the bank or payment guarantee and performance guarantee provided by the bank, insurance company or professional guarantee company (1 copy, original inspection);

12, bill of quantities quotation or tender quotation budget (1 copy);

13, other explanatory materials.

Note: If a copy of the above materials is provided, the official seal of the provider shall be affixed.

The following materials shall be submitted when going through the construction application procedures and obtaining the construction permit:

1, land use certificate

2. Reply to the bid-winning notice, transaction service fee payment voucher and bid form.

3. Drawing approval information of the drawing approval center

4, building fire information.

5. Business license, qualification certificate, project manager certificate and five-member certificate of the construction unit.

6. Business license and qualification certificate of the design unit

7 business license and qualification certificate of the reconnaissance unit

8, supervision unit business license, qualification certificate

9. Construction Land Permit

10, construction project planning permit

1 1 Construction Permit Application Form

12, construction project construction contract

13, Construction Project Application Form

14, schedule of construction costs of construction projects

15, project quality supervision declaration

16, project quality assurance system review form

17, commencement report

18, Safety Supervision Notice

19, the safety production license of the construction unit and the project manager, builder, safety officer and safety training certificate.

20. capital guarantee or certificate ... >>

Question 4: What information should be provided for home improvement construction? The following materials should be prepared before application:

1, property ownership certificate, and the non-owner shall issue the owner's power of attorney;

2, hired decoration construction team qualification certificate, project leader's ID card, business license and other copies; Simple decoration, the owner must issue a decoration guarantee, do not need qualification certificates and other materials;

3, building plan, construction plan, elevation, water and electricity construction drawings and other information.

4. After the information provided is submitted to the management office for review, the owner or the owner's authorized person shall fill in the decoration project declaration form.

5. The decoration engineering application form and building materials shall be submitted to the engineering and technical personnel of the management office for examination and approval, and then the decoration shall be approved by the director of the management office.

6, after approval, decoration construction director and management office signed a decoration responsibility.

7. Decoration management service fee and deposit: the management service fee shall be paid by the construction unit to the management office according to the 2 yuan per square meter; The deposit shall be paid by the construction unit to the management office according to the standard of per square meter 10 yuan (the deposit can be fully refunded after three months of decoration acceptance without any engineering problems);

8. The management office shall issue a decoration start-up sheet and a decoration responsibility card, and the construction unit shall handle the temporary pass for the construction personnel before carrying out the construction. Two. Information required for fire control examination and approval (1) "Shanghai Construction Project Construction Site Fire Control Audit Declaration Form"; (2) Review opinions on fire protection design of building engineering; (three) fire safety measures and the system of using fire and electricity; (4) Fire safety agreement signed by Party A and Party B; (5) Construction organization design scheme (expressed in the form of general construction plan and text, indicating the fire lane and fire equipment).

Three: fire approval procedures

First, fill in the Declaration Form for Fire Prevention Audit of Building Interior Decoration Design and the Declaration Form for Fire Prevention Audit of Construction Site. Remember that the applicant should be the construction unit, not the construction unit. The construction unit needs to affix its official seal and present the rental agreement or purchase agreement. If it is handled by the construction unit, it can only be said that it is an agent.

2. The contents filled in the declaration form are basically the main building materials, such as partition materials/floor materials/top materials.

3. It is necessary to prepare a copy of the drawings for the overall fire control acceptance of the place (generally available in the property management office).

4. It is necessary to prepare the plan, electrical diagram and fire-fighting reconstruction diagram of the specific construction site (the fire-fighting facilities can be explained in the remarks). The above drawings need to be blueprinted and stamped by units with design qualification (such as architectural design institute).

5. The local fire brigade will inspect the site within 10 working days and put forward written opinions. If it agrees, it can start working; If not, you may need to modify the renovation plan.

6. Two weeks before the renovation, you can submit a declaration form for fire control acceptance of construction projects, and the contents of the declaration form are basically the same as those of the declaration form. Generally, the fire brigade will randomly check 2~3 kinds of building materials for testing (PVC pipes, blockboards, curtains, etc.). ).

7. If they pass the examination, at least 2 people from the construction unit shall participate in the fire protection training (compulsory).

8. After the project is completed, the fire brigade will go to the site for inspection, and some rectification opinions will be listed. Just do it. Then, it will send a fire inspection and approval letter to the construction unit.

Question 5: What are the procedures for building application? The procedure for applying for a building is as follows:

1, land use procedures, land delivery, site leveling, entrusted piling, pre-examination of land for land acquisition and construction of the project, joint examination of land use, and land acquisition reply.

2, for the construction land planning permit, signed a contract for the transfer of state-owned land.

3, for the construction project planning permit, construction permit, tender.

4. Pre-sale permit of commercial housing and confirmation of completion acceptance.

Question 6: Which projects do not need to be submitted for construction?

1, with an investment of less than 300,000 yuan or a construction area of less than 300 square meters.

2. Farmers build low-rise houses by themselves.

3. Temporary buildings.

4. Emergency rescue and disaster relief.

5. Military residence shall be stipulated separately by Guo Wuyuan and Zhongyang.

Application for construction refers to the application for construction of engineering construction projects. Construction project application refers to the behavior of the construction unit or its agent to submit a construction application to the local construction administrative department or its authorized institution after the feasibility study report or other project approval documents of the project are approved, and submit the approval documents of the project approval, including the credit certificate issued by the bank and other relevant documents such as the approved construction land.

Question 7: What materials are needed for building construction application and urgent construction project application?

I. Preliminary design review (5 working days)

1. Application:

2, the Planning Commission for the record notice or approval (copy);

3, planning approval plan general plan (original inspection, a copy of the official seal of the construction unit);

4, survey and design contract (copy);

5. Preliminary design documents: two elevation renderings, one preliminary design description and one set of preliminary design drawings (including general plan 1, preliminary construction drawing 1, preliminary wiring diagram 1, preliminary water diagram 1, preliminary high voltage diagram 1, and preliminary weak current diagram 65430/) In addition, basement plan 1 copy, general water supply and drainage plan 1 copy, preliminary plan of TV broadcasting system of residential project 1 copy (there is no special preliminary plan for TV broadcasting, so it can be replaced by weak current preliminary plan), lightning protection plan 1 copy (for projects with a building height exceeding 80m) and transfer water tank (pool).

6. Electronic documents of preliminary design documents, including a full set of preliminary drawings, design descriptions and renderings. ;

7 residential projects should be reported to the household statistics.

Two, building energy efficiency review for the record (5 working days)

Building Energy Conservation Review Record Form

Building energy-saving design drawing

Calculation sheet of building thermal design

Three, construction drawing design review for the record (3 working days)

(1) Administrative reconsideration

Notice of project establishment (one copy)

Administrative reconsideration opinions issued by the departments of fire protection, planning, environmental protection and radio and television (one for each).

Original design contract and qualification certificate (one for each)

Original survey contract and qualification certificate (one for each)

(2) Technical review

For specific details and legal provisions, please consult a real estate lawyer and visit tieba.baidu/p/4313353742, the lawyer who posted it with Baidu.

Question 8: Do rural houses need to be built? 30 points: projects without construction permit 1, construction projects with project cost less than 300,000 yuan and construction area less than 300m2 without construction permit1; 2, farmers do not need to apply for construction permits for self-built low-rise residential buildings;

Question 9: What is the application procedure of the project? What information do you need? first step

After completing the planning and project bidding, receive the project construction application form:

1, construction project application form (in quintuplicate);

2, the construction permit application form (2 copies).

Second step

Handling construction project expenses (and paying the expenses):

1. The Industry Management Section will calculate the relevant fees and draw up the fee schedule;

2, by the Development Zone Finance Bureau accounting, fees and invoices.

Third step

Construction contract filing of construction projects:

1, and obtain relevant forms for filing construction contracts of construction projects;

2, the construction unit to provide (table 1) in the gallbladder column data;

3. Send it to the Municipal Construction Bureau for approval and publish it on the website of the municipal construction project.

Fourth step

Handle the construction permit.

The construction unit shall provide the information listed in Schedule 2.

Step five

Sign for the setting-out of construction projects.

Construction contract filing and submission materials

1, the certificate of the legal representative of the applicant and the certificate of authorization of the legal representative (1 original);

2. The client's ID card (1 copy, original inspection);

3. Two copies of the supplementary agreement to the construction contract (two copies, original inspection) (each with the official seals of both parties);

4, the contractor qualification certificate (1 copy, the original inspection);

5, the project manager qualification certificate (1 copy, the original inspection);

6, the project contractor's safety production license (1 copy, the original inspection);

7, the project manager's production safety assessment certificate (1 copy, the original inspection);

8. Personnel files of the project department of the construction unit (1 original);

9, the construction unit project department members (except the project manager) practice or mount guard certificate (1 copy, the original inspection);

10, bid-winning notice (1 original);

1 1, capital availability certificate issued by the bank or payment guarantee and performance guarantee provided by the bank, insurance company or professional guarantee company (1 copy, original inspection);

12, bill of quantities quotation or tender quotation budget (1 copy);

13, other explanatory materials.

Note: If a copy of the above materials is provided, the official seal of the provider shall be affixed.

The following materials shall be submitted when going through the construction application procedures and obtaining the construction permit:

1, land use certificate

2. Reply to the bid-winning notice, transaction service fee payment voucher and bid form.

3. Drawing approval information of the drawing approval center

4, building fire information.

5. Business license, qualification certificate, project manager certificate and five-member certificate of the construction unit.

6. Business license and qualification certificate of the design unit

7 business license and qualification certificate of the reconnaissance unit

8, supervision unit business license, qualification certificate

9. Construction Land Permit

10, construction project planning permit

1 1 Construction Permit Application Form

12, construction project construction contract

13, Construction Project Application Form

14, schedule of construction costs of construction projects

15, project quality supervision declaration

16, project quality assurance system review form

17, commencement report

18, Safety Supervision Notice

19, the safety production license of the construction unit and the project manager, builder, safety officer and safety training certificate.

20. capital guarantee or certificate ... >>

Question10: What information does J construction project need to apply for construction? 1. Project establishment: (Sino-foreign joint venture and wholly foreign-owned project)

1, project application (approved by Development Zone and District Planning Commission);

2. Location map of construction land;

3, the project feasibility study report, a copy of the reply;

4. A copy of the reply on the establishment of the company (MOFTEC);

5. A copy of the business license;

6. Copy of capital verification report.

Second, the civil air defense examination and approval:

1, Registration Form for Architectural Design of Air Defense Basement (obtained from Civil Air Defense Office);

2, project, review, approval and other documents;

3. General plan and construction drawing (except factory building).

Third, the fire approval:

1, application form for fire prevention audit of building fire protection design (obtained from the fire department);

2, project, review, approval and other documents;

3, the construction unit application report;

4. Full set of drawings.

Four, planning approval:

1, Application Form for Construction Project Planning Permit (obtained from District Planning Bureau);

2, project, review, approval and other documents;

3, civil air defense approval form;

4, fire approval;

5. Two sets of semi-construction drawings: namely, two sets of construction drawings, and the semi-set refers to the cover, catalogue, general plan, building plan, elevation, section and foundation plan. The covers of two and a half sets of drawings shall be stamped by the design unit to be valid.

Verb (abbreviation of verb) Construction Committee (handling construction permit):

1, documents such as project establishment, review and approval;

2, the construction registration form;

3. Construction planning permit;

4, design bidding and bid-winning notice;

5, construction drawing review and approval;

6, construction bidding and bid-winning notice;

7. Survey and design contracts;

8. Construction contract.