I'll show you a catalogue and you'll know. The first is the safety education and training for employees, and then you can combine the catalogue with the safety information catalogue.
Classification number. Construction safety data table name number (or data source) storage unit
Construction unit supervision unit construction unit leasing unit demolition unit
Safety management data of AQ-AQ-c 1 AQ-c 1+0 project.
Project Overview Table AQ-C 1- 1 ●
Control measures for major hazard sources in AQ-C 1-2 project ●
AQ-C 1-3 Project Major Hazard Identification Summary ●●
Expert argumentation table AQ-C1-4 ●●●●●●
Summary table AQ-C1-5●●●●●
AQ-C 1-6 ●
Beijing Construction Site Inspection Scoring Record (Safety Management) AQ-C 1-7 ●
Beijing Construction Site Inspection Scoring Record (Living Area Management) AQ-C 1-8 ●
Beijing Construction Site Inspection Scoring Record (Site and Material Management) AQ-C 1-9 ●
Beijing Construction Site Inspection Scoring Record (Environmental Protection) AQ-C 1- 10 ●
Scoring Record of Beijing Construction Site Inspection (Scaffolding) AQ-C1-1●
Beijing Construction Site Inspection Scoring Record (Safety Protection) AQ-C 1- 12 ●
Scoring record of Beijing construction site inspection (construction electricity consumption) AQ-C 1- 13 ●
Beijing Construction Site Inspection Scoring Record (Tower Crane, Lifting) AQ-C 1- 14 ●
Beijing Construction Site Inspection Scoring Record (Mechanical Safety) AQ-C 1- 15 ●
Beijing Construction Site Inspection (Fire Control) Scoring Record AQ-C 1- 16 ●
Project intends to safety production responsibility system construction unit ●●
●●●● Setting of safety management organization of the project management department of the construction unit
Safety management system of the construction unit, post certificates of safety production personnel, etc. And a monitoring unit for reviewing data.
Project intends to safety production management system construction unit ●
Safety management agreement for general subcontracting of construction unit ●●
Table AQ-B2- 1 (Table B2-1) for Submitting for Approval of Engineering Technical Documents●●
Construction organization design and special safety technical measures ●●
Construction scheme of the construction unit in winter and rainy season ●●
Audit data of special safety construction scheme of construction unit and emergency rescue plan of engineering project supervision unit ●●
AQ-C 1 safety technical disclosure summary AQ-C 1- 17 ● ●
Operator safety education record AQ-C 1- 18 ●
Construction unit safety capital investment record ●
AQ-B2-4●●●●
AQ-B2-5●●●●
Construction site safety accident registration form AQ-C 1- 19 ● ●
Registration Form of Special Operations Personnel AQ-C1-20●●●
Data transmission table AQ-A-2 for above-ground and underground pipelines and buildings (structures)
AQ-C 1-2 1 ● ●
Construction unit safety protection articles certificate and test data ●
Construction unit of emergency plan for production safety accidents ●●●
Safety sign construction unit ●
Construction unit violation records ●
Construction permit ●●●●●● Construction unit
Construction site safety supervision registration form AQ-A- 1 (table JD-1) ●●●●
List of main management personnel of the construction unit of the project department ●
Construction unit safety operation procedures ●
Construction site safety management target construction unit ●
Living quarters data of AQ-C2 AQ-C2 project
Layout plan of sanitary facilities in the construction unit's site and living area ●
Office, living quarters, canteens and other health management system construction units ●
Registration and use records of first-aid drugs and equipment construction units ●
Emergency measures and plans for acute occupational poisoning of the project ●
Certificate of Construction Unit for Canteen and Cooking Personnel ●
Summer dormitory heatstroke prevention and mosquito bite prevention measures construction unit ●
Winter dormitory heating (including soil heating) management responsibility system construction unit ●
Requirements for dormitory lighting installation ● Construction unit
Site and materials of AQ-C3 AQ-C3 project
Residents visiting record construction unit ●
Site storage plan of materials in each stage and division of responsibilities of the construction unit ●
Material preservation and storage measures ● Construction unit
Construction unit finished product protection measures ●
All kinds of garbage storage and disposal management data of the site construction unit ●
Construction unit of civilized construction scheme on construction site ●
Provisions of Hanjian Group on the Construction Unit of Envelope ●
Construction site board (electronic version) construction unit ●
"Five certificates and one map" system card content construction unit ●
Environmental protection data of AQ-C4 AQ-C4 project
Project environmental management scheme construction unit ●
Environmental protection management organization and division of responsibilities of the construction unit ●
AQ-C4- 1 ● ●
Examination and approval procedures for night construction ●●
Measures for not disturbing the people at the construction site ●●
◆ Construction unit of sewage sedimentation measures at the front desk ●
◆ Dust prevention and dust prevention measures ●
Measures to prevent vehicle transportation leakage and spillage ● Construction unit
Measures to prevent pipeline from running, leaking, dripping and leaking in the construction site ●
On-site road hardening, drainage measures, safety technical disclosure implementation and acceptance records ●
Cleaning measures for transport vehicles of the gate construction unit ●
Measures for garbage storage and timely removal at the construction site ●
Construction unit construction site inspection records and rectification records ●
Construction unit site environmental inspection records ●
Records of people's comments and handling work (residents' reception room). Construction unit ●
Scaffolding data of AQ-C5 AQ-C5 engineering project
Design and construction scheme of scaffolding, unloading platform and support system construction unit ●●
Acceptance Form of Steel Pipe Fastener Support System AQ-C5- 1 ● ●
Floor (or cantilever) scaffold acceptance table AQ-C5-2 ●
Tool scaffolding installation acceptance table AQ-C5-3 ●
Safety protection data of AQ-C6 AQ-C6 engineering project
Foundation pit, earthwork and slope protection scheme, formwork construction scheme and construction unit ●●
Safety measures for upper and lower passages of foundation pit construction units ●
Measures to prevent the pit from being overloaded ● Construction unit
Protection measures for foundation pit edge of construction unit ●
Construction unit for drainage measures and dewatering measures ●
Inspection record of safety protection facilities of the construction unit ●
Foundation pit support acceptance table AQ-C6- 1 ● ●
Observation record of foundation pit supporting settlement AQ-C6-2 ● ●
AQ-C6-3 Observation Record of Horizontal Displacement of Foundation Pit Support
Manual digging pile protection list AQ-C6-4●●●●
AQ-C6-5 Gas Detection Record of Special Parts●●●
Template support temporary fixed measures construction unit ●
Anti-dumping measures for storing large formwork by the construction unit ●
Construction unit for installation and removal of formwork edge protection and hole sealing measures ●
Management measures When entering the construction site, you must wear safety helmet correctly. Construction unit ●
When working at height, please fasten the seat belt system correctly. Construction unit ●
Safety protection measures of stair construction unit ●
Safety protection measures for elevator wellhead construction device ●
Safety protection measures for reserved holes, pits and wells ●
Safety protection measures for construction safety passage Construction unit ●
Construction electricity consumption data of AQ-C7 AQ-C7 project
Temporary electricity construction organization design and change data construction unit ●●
Construction site temporary electricity acceptance table AQ-C7- 1 ● ●
General subcontracting temporary electricity safety management agreement construction unit ●●
Construction unit electrical equipment test and debugging records ●
Electrical wiring insulation strength test record AQ-C7-2 ● ●
Temporary electricity grounding resistance test record AQ-C7-3 ● ●
Electrician patrol maintenance record AQ-C7-4 ●
Construction scheme for erection and demolition of external protection ●●
Warning measures for external protection ●●
Tower crane and hoisting data of AQ-C8 AQ-C8 project
Tower crane lease, use, disassembly management information 1, lease contract and safety management agreement signed with the leasing unit, which clearly defines the rights and responsibilities of both parties ●●●●●
2. Dismantling contract and safety management agreement signed with demolition unit ●●●●●● Construction unit
3, lifting machinery unified number. ●●●●●●●● The construction unit that provides inspection report and product certificate of hoisting machinery products without uniform number.
4, lifting machinery operators, installation and disassembly workers, lifting signalman special operation qualification certificate construction unit ●●●●●
5. Demolition unit construction unit installation qualification certificate●●●●●
6. Construction units such as special installation scheme and technical measures for hoisting machinery approved and signed by the person in charge of the demolition unit ●●●●●
7. Auxiliary hoisting machinery periodic inspection certificate, lifting performance table and other documents●●●●● Construction unit
Registration Form for Use of Lifting Machinery by Beijing Construction Unit ●●
Construction site lifting machinery disassembly report AQ-B2-2●●●●
Construction site hoisting machinery acceptance list AQ-B2-3 ● ●
Unified Inspection and Acceptance Form for Disassembly of Tower Crane in Beijing AQ-C8-1●●●●●●●
Tower crane disassembly scheme, tower group operation scheme and special construction scheme for hoisting operation ●●●●●● Construction unit
Tower crane layout construction unit ●●●●
●●●●●● The construction unit shall make safety technical disclosure for tower crane and bell man.
Construction hoisting machinery AQ-C8-2 ● ●
Tower crane "ten don't lift" principle construction unit ●
Mechanical safety data of AQ-C9 AQ-C9 engineering project
Mechanical lease contract, safety management agreement between lessor and lessee ●●●●●● Construction unit
Dismantling scheme of material hoist, external elevator and electric hanging basket Construction unit ●●●●●●●
Unified Acceptance Form for Disassembly and Assembly of Beijing AQ Construction Elevator-C9-1●●●●●●
Construction machinery inspection and acceptance form (electric hanging basket) AQ-C9-2●●●●●●●●
Acceptance record of piling (drilling) machinery AQ-C9-3
Construction machinery inspection and acceptance form (concrete mixer) AQ-C9-4 ●
AQ-C9-5●●●●
Construction machinery inspection and acceptance form (gantry crane) AQ-C9-6●●●●●●
Construction machinery inspection and acceptance form (truck crane) AQ-C9-7 ●
Construction machinery inspection and acceptance form (excavator) AQ-C9-8 ● ●
Construction machinery inspection and acceptance form (loader) AQ-C9-9 ● ●
Construction machinery inspection and acceptance form (material hoist) AQ-C9-10 ●●●●●●●
Construction machinery inspection and acceptance form (concrete pump) AQ-C9- 1 1 ● ●
Construction machinery inspection and acceptance form (reinforcement machinery) AQ-C9-12 ●●●●●●
Construction machinery inspection and acceptance form (woodworking equipment) AQ-C9-13 ●●●●●●
Construction machinery inspection and acceptance form (other small and medium-sized) AQ-C9- 14 ● ●
Construction unit AQ-C8-2●●●●
Mechanical equipment inspection and maintenance records AQ-C9- 15 ● ●
Measures for the administration of construction machines and tools ●
Construction machinery inspection system construction unit ●
Construction unit of shift system of construction machinery ●
Construction unit of construction machinery maintenance system ●
AQ-c 10AQ-c 10 Project Fire Protection Data
AQ construction site fire key parts registration form -C 10- 1 ●
Planned construction unit of fire fighting equipment ●
On-site fire safety system, scheme and preplan of the construction unit ●
On-site fire safety agreement of the construction unit ●
AQ-C 10 Site Fire Organization and Activity Record of Construction Unit ●
Fire control approval procedures for construction projects ●●
Inspection and acceptance data of building insulation materials ●
Fire fighting equipment account ●
Acceptance and maintenance records of fire control facilities and equipment ●
Safety measures for waterproof construction and disclosure by the construction unit ●
Inspection record of safety personnel on duty of the construction unit ●
AQ-C 10-2 ●
Aq-c11aq-c1/other information.
Safety technical disclosure AQ-C 1 1- 1 ●
Team education records of the company, project department and construction unit ●
Construction unit of three-level safety education registration card and safety test paper ●
Copy of registration form and employment certificate of special operation personnel of the construction unit ●
Construction safety log AQ-C 1 1-2 ●
Pre-shift speech record AQ-C 1 1-3 ●
Inspection record and hidden trouble rectification record AQ-C 1 1-4 ●
Safety Risk Report AQ-B2-6●●●●
Work contact table AQ-B2-7 (table B4- 1) ●●
Supervision Notice AQ-B2-8 (Table B2-16) ●●●●
Suspend the order AQ-B2-9 (table B2-19) ●●●●
Supervision notice reply sheet AQ-B2- 10 (table B2- 15) ●●
Data of approval to resume work AQ-B2- 1 1 (Table B2-9) ●●●
Supervision unit for reporting and handling opinions on potential safety accidents and production safety problems ●●
Supervision planning (including safety supervision scheme) and detailed rules for the implementation of safety supervision●●●
Minutes of special meeting of safety supervision unit ●●●
Model safety technical disclosure (Beijing Construction Committee) Construction unit ●
Standardized Questions and Answers on Safety Education and Training for Construction Workers (Beijing Construction Committee) ●
Safety laws, regulations, norms, standards, methods and notices that must be possessed by the construction site.
Answer time: 2010-12-710:1|.