Current location - Training Enrollment Network - Education and training - Emergency Plan for Typhoon Safety in Construction Site
Emergency Plan for Typhoon Safety in Construction Site
Emergency Plan for Typhoon Safety in Construction Site (select 5 articles)

In normal study, work and life, we sometimes encounter some unexpected events. In order to reduce the consequences of accidents, it is necessary to prepare detailed emergency plans in advance. So what is an excellent emergency plan? The following is my carefully compiled emergency plan for typhoon prevention in the construction site (selected 5 articles). Welcome to share.

Emergency Plan for Typhoon Safety in Construction Site 1 Typhoon is more and more harmful to construction site. This plan is formulated in order to prevent the typhoon from damaging the construction site and reduce the loss and accident expansion after the damage.

(1) Measures to prevent typhoon accidents:

1. After receiving the typhoon information, the project department and the construction team at the construction site shall be informed immediately, so that every employee at the construction site will know when there will be a typhoon. Get everything ready.

2. The project department will immediately organize personnel to inspect the power grid, tower crane, steel derrick, construction elevator and temporary facilities on site. If problems are found, effective measures should be taken immediately for rectification (for example, the attachment on the grid is not firm, the bridge slab is not tied properly, the materials and sundries on the bridge are not cleaned up, the safety net is not hung properly, and the temporary roof is not reinforced, etc.). ).

3. Workers' dormitory is at the forefront, so workers should be evacuated from the dormitory immediately and moved to a safer place to avoid the wind.

Workers whose dormitories are near trees and high-voltage lines should be evacuated to shelters.

5. During the typhoon, all outdoor operations are strictly prohibited, and workers are required to try not to go out. Prevent objects from being hit by typhoons.

6. Lock the electrical box on the construction site and evacuate the outdoor mechanical equipment indoors.

7. Nail, hang and fasten all loose materials on site to ensure foolproof.

(2) Emergency plan for typhoon accidents:

1. If there is a typhoon accident in the workers' dormitory, it shall immediately notify the higher authorities and evacuate the workers in the dormitory to temporary shelters. And arrange the lives of workers.

2, timely rescue the injured, rescue personnel must wear necessary protective equipment (such as helmets, gloves, raincoats, glasses, etc. ).

3. Disconnect the power supply at the scene of the accident to protect workers' property from being stolen.

4. Protect the scene of the accident and wait for the investigation.

Emergency plan for typhoon prevention in construction site 2 I. Guiding ideology:

Preventing typhoon and rainstorm is an important work related to the life safety of teachers and students and the safety of national property. In order to effectively protect the safety of teachers, students and property, and improve the ability of kindergarten to deal with flood prevention and typhoon prevention, this plan is formulated in line with the principle of "prevention first, safety first".

Second, the prevention steps:

List of leading groups and contact telephone numbers

Team leader:

Team members:

The kindergarten started the typhoon prevention and flood control plan, and implemented the 24-hour leadership duty and duty system.

Third, emergency measures:

1, strengthen information communication, so that the upper situation is issued and the lower situation is reported.

When there is a big flood, all the leaders are in place, and the leading group for flood control and typhoon prevention begins to operate; The competent leader shall report the disaster to the leading group for flood prevention and typhoon prevention; Fully deploy typhoon prevention and flood control work.

2, prevention first:

(1) Clear the corridor. Before the typhoon lands, it is necessary to clean up the sundries and flowerpots on the balcony and corridor to prevent people from being blown away by the wind when the typhoon lands.

(2) Close the doors and windows. When typhoon and rainstorm come, the wind is strong and the rainfall is heavy. Close the doors and windows to prevent the wind and rain from damaging the doors, windows and furniture and causing casualties.

(3) The doorman will spare no effort to dredge the sewers and main collecting wells of the whole school.

(4) Dredge the drains and downpipes on the school buildings, and trim and reinforce the trees in the school.

(5) Conduct a comprehensive safety inspection on the lightning protection facilities and outdoor wires of the whole school building.

(6) Conduct a comprehensive safety inspection of outdoor antenna, outdoor unit of air conditioner and plug-in.

(7) Conduct a comprehensive inspection of indoor power supply, sockets, doors and windows of all departments.

(8) If the circuit and wires are interrupted due to typhoon, turn off the power switch in time and turn on emergency lights, flashlights or candles for lighting.

Fourth, safeguard measures:

After the plan is started, kindergartens should make early warning and record information. Hold an emergency meeting, in the shortest possible time, deploy the kindergarten flood control and typhoon prevention work by telephone, inform the typhoon flood dynamics, and arrange the requirements and tasks of flood control and typhoon prevention, emergency rescue and disaster relief.

Keep close contact with superior departments and units at any time, strengthen information communication, and ensure information release and reporting.

On-site Emergency Plan for Typhoon Safety 3 1 General Rules

The purpose of compiling 1. 1

In order to do a good job in defending against super typhoon, respond to sudden disasters caused by super typhoon in time, minimize casualties and property losses, resume production and life as soon as possible, and ensure sustained and healthy economic and social development, this plan is formulated.

1.2 compilation basis

The preparation of this plan is mainly based on People's Republic of China (PRC) Water Law, People's Republic of China (PRC) Flood Control Law, Zhejiang Flood Control and Drought Relief Regulations, National Emergency Plan for Flood Control and Drought Relief, Zhejiang Emergency Plan for Flood Control and Drought Relief, Wenling General Emergency Plan for Public Emergencies, and Zhejiang Research Report on Defense Strategy for Super Typhoon.

1.3 Scope of application

This plan is applicable to the defense and emergency response of super typhoon disasters and various secondary and derivative disasters within the city.

1.4 working principle

In order to prevent the super typhoon disaster, the chief executive responsibility system and the post responsibility system and accountability system of grading and sub-departments are implemented. Adhere to the working principles of "people-oriented, prevention-oriented, unified command, graded responsibility, rapid response, departmental linkage, implementation according to law, scientific scheduling, foothold at the grassroots level, and prevention and treatment by groups".

1.5 work priorities

The defense against super typhoon is people-oriented, focusing on the safe transfer of personnel, giving priority to avoidance, being launched by the whole people and under unified command. If necessary, the resettlement can be forced according to law. The main contents are as follows:

Downstream of the reservoir (mountain pond) with potential safety hazards 1.5. 1 residents;

1.5.2 Mountain torrents, such as landslides, mudslides and collapses, affect residents in the area;

1.5.3 Class III and IV dangerous (old) households, Class II households directly facing the wind along the coast, and operators in coastal areas (offshore aquaculture, shipbuilding enterprises, construction enterprises, etc.). ), structures that are easily blown down by strong winds, overhead facilities and people near projects under construction, temporary houses and residents living in low-lying areas and other dangerous areas;

1.5.4 personnel living in the first-line seawall (culvert) where danger may occur;

1.5.5 All kinds of ships return to Hong Kong for shelter;

1.5.6 people stranded in factories, shops, churches, temples and schools, people driving on the roads, pedestrians on streets and roads, tourists and outsiders;

1.5.7 the safety of hydrometeorologists, emergency commandos, rescuers, medical personnel, news media and typhoon prevention staff.

2. Organization and command system

2. 1 Municipal Flood Control and Drought Relief Headquarters

To defend against a super typhoon, the Municipal Flood Control and Drought Relief Headquarters shall, under the leadership of the superior flood control and drought relief headquarters and the municipal party committee and municipal government, command, deploy and implement the work of "preventing, avoiding, robbing and rescuing".

The commander of the Municipal Flood Control and Drought Relief Headquarters is the deputy mayor in charge of the municipal government, and the deputy commander is the director of the Municipal Water Conservancy Bureau, the deputy director of the Municipal Office and the deputy director of the Municipal Water Conservancy Bureau.

The member units of the Municipal Flood Control and Drought Relief Headquarters are the Municipal People's Armed Forces Department, the Reserve Camp, the Propaganda Department of the Municipal Party Committee, the Municipal Supervision Bureau, the Municipal Public Security Bureau, the Municipal Water Conservancy Bureau, the Municipal Meteorological Bureau, the Municipal Ocean and Fisheries Bureau, the Municipal Bureau of Land and Resources, the Municipal Construction Planning Bureau, the Municipal Transportation Bureau, the Municipal Education Bureau, the Civil Affairs Bureau, the Municipal Tourism Bureau, the Municipal Work Safety Supervision and Administration Bureau, the Municipal Development and Reform Bureau, the Municipal Finance Bureau, the Municipal Administration for Industry and Commerce, the Municipal Agriculture and Forestry Bureau, the Municipal Health Bureau Municipal Civil Defense Office, Wenling Marine Department, China People's Property Insurance Company Limited Wenling Branch, Zhejiang Telecom Company Limited Wenling Branch, China Unicom Company Limited Wenling Branch, Zhejiang Mobile Company Limited Wenling Branch and other departments and units.

2.2 Office

The municipal flood control and drought relief headquarters has an emergency office and a daily office. The Emergency Office consists of seven organizations, namely, expert group, emergency rescue and disaster relief group, disaster investigation and nuclear disaster group, publicity and reporting group, logistics support group, flood control and drought relief dispatching group and information comprehensive group, which are led by relevant functional departments respectively. The daily office (hereinafter referred to as the Municipal Office of the Third Prevention) is responsible for the daily work of typhoon prevention.

2.3 Township (street) flood control and drought relief headquarters.

Towns (streets) set up flood control and drought relief headquarters and daily offices, implement office buildings, and equip them with 2 ~ 3 full-time staff. All departments should make clear the person responsible for flood control (AB post) and the contact person for flood control. Urban community, village (neighborhood) and other grassroots organizations, as well as enterprises and institutions, water project management units, key project construction units.

It is necessary to set up a flood control and drought relief office, clarify full-time personnel and responsibilities, and do a good job in typhoon prevention in accordance with the instructions and plans of the Municipal Flood Control and Drought Relief Headquarters.

3, super typhoon defense standard classification

The defense standard of super typhoon is divided into four levels: IV, III, II and I from low to high. ..

3. 1 general (level 4)

The meteorological department predicts that the super typhoon is developing and is expected to affect our city.

3.2 Larger (Grade III)

The meteorological department predicts that the super typhoon will sweep the sea area of our city northward, or land in the central Fujian to the coastal area of northern Zhejiang, affecting our city within 48 hours.

3.3 Major (2)

The meteorological department predicts that the super typhoon will land in the coastal areas from northern Fujian to northern Zhejiang, which will seriously affect our city within 24 hours.

3.4 particularly significant (Ⅰ)

The meteorological department predicts that the super typhoon will land along the coast from Wenzhou to Xiangshan, and will attack our city head-on within 12 hours.

4, prevention and early warning mechanism

4. 1 Typhoon and secondary disaster monitoring

Meteorological, marine and fishery, water conservancy, land resources and other departments are responsible for the construction of monitoring, forecasting and early warning systems for typhoons, rainstorms, storm surges and mountain torrents, and timely and accurately provide real-time information on typhoons, rainfall, water levels and storm surges and monitoring information on geological disasters to member units in towns and cities.

4.2 Water conservancy project inspection

Management units of water conservancy projects such as reservoirs, mountain ponds, rivers, seawalls and culverts shall define the responsible persons and establish daily inspection systems and safety monitoring and supervision systems.

4.3 Prevention and early warning

4.3.65438+

4.3.2 Towns (streets), communities and villages in disaster-prone areas such as mountain torrents, mudslides and landslides, enterprises, institutions and schools shall determine early warning officers and perform early warning duties. The Municipal Bureau of Land and Resources took the lead in establishing an early warning responsibility system combining professional monitoring with mass prevention and treatment, implementing observation measures, and insisting on daily inspections during flood season. During the rainy season, strengthen observation and inspection, once the danger signs are found, immediately issue an alarm to the areas that may be affected, and take temporary emergency measures to inform the masses to move. And report to the municipal flood control and drought relief headquarters in time.

4.3.3 Relevant departments such as ocean and fishery, transportation (port and shipping), maritime affairs and coastal towns (streets) should comprehensively analyze the factors such as power, tonnage, berthing position and port conditions of fishing boats, determine specific standards for scientific gradient transfer of fishing boats and fishermen in combination with the wind direction and direction of typhoon, and formulate feasible schemes for sheltered transfer of fishing boats and fishermen. Strengthen the safety management of foreign sheltered ships and implement the resettlement places for ashore personnel. Prepare the construction plan of the safe haven, carry out the construction according to the national and provincial standards, improve the ship mooring facilities, do a good job in daily maintenance, and enhance the ability to defend against storm surges. Evaluate the windproof capacity of the built refuge, determine the safety capacity according to the evaluation results, and take corresponding safety measures. Collect and register the communication materials of all kinds of sheltered ships in time, and send typhoon prevention information to the crew in time through mass communication and fishery administration broadcasting according to the typhoon level dynamics. According to the city's anti-finger instruction, the evacuation order of the ship's personnel was issued in time.

4.3.4 The health department shall organize and implement a corresponding number of rescue teams, equip them with all kinds of medical equipment and medicines, define the contact person, arrive at the designated place as soon as possible, and set up temporary rescue points. Once someone is injured, they shall be rescued and treated in time to reduce casualties.

4.3.5 Towns (streets) should make clear the number of people to be transferred, the transfer route, the contact responsible person and the resettlement place of eight categories of people, such as dangerous houses, sheds, low-lying land, farms, non-standard seawalls outside seawalls and dangerous construction sites, and choose them in various communities (villages) under the guidance of relevant departments such as construction, land, housing construction, civil affairs and civil air defense. It is necessary to build high-standard and high-quality centralized resettlement houses for disaster avoidance personnel in combination with the current construction of new communities and new countryside.

4.4 Anti-typhoon inspection

Typhoon prevention inspection is carried out at different levels, including unit self-inspection, town (street) and department inspection and superior supervision. The main contents of the inspection are the implementation of the typhoon prevention responsibility system, the establishment of the system, the improvement of plans and countermeasures, the transfer of personnel, the work of electromechanical and facilities, and the storage of materials. Conduct regular inspections before the flood season every year, focus on inspections before typhoons, and report the results step by step.

4.4. 1 The Municipal Flood Control and Drought Relief Headquarters regularly and irregularly organizes relevant departments and units to carry out typhoon prevention inspections. If there are security problems in typhoon prevention, the relevant units shall be instructed to handle and rectify within a time limit.

4.4.2 All departments shall focus on strengthening projects under construction, ships, safe havens and geological disasters according to their respective responsibilities.

Emergency Plan for Typhoon Prevention in Construction Site 4 In order to do a good job in typhoon prevention in my construction site, reduce disaster losses and ensure personal and property safety, the emergency response plan of this project department is formulated in accordance with the spirit of People's Republic of China (PRC) Safety Production Law and relevant documents of the District Construction Bureau, combined with the actual situation of our company.

First, the basic principles of emergency treatment

(1) This plan is the basic procedure and organizational principle for emergency treatment when the construction site is attacked or affected by a typhoon.

(two) the implementation of emergency treatment follows the principle of unified command, responsibility, prevention first, rescue first, rapid response and safety first.

Second, the organization and the responsibilities of the supervisor

The project department set up a leading group for typhoon prevention on the construction site.

Team leader: Zhu Jiahua, project manager.

Deputy team leader: Dai Jinquan, deputy manager of the project department, and Zhou, technical director.

Members: Zhang Hua, safety office of the project department, Cai Baobin, quality engineer, Zhang Jianhu, builder and other relevant personnel.

Main responsibilities:

(a) responsible for formulating and revising the emergency plan for typhoon prevention in construction projects;

(2) Before the typhoon comes, inform the construction site to do a good job of typhoon prevention, check the reinforcement of safety facilities on the construction site, and evacuate and transfer workers;

(three) arrange personnel on duty, check the construction site, immediately organize rescue and rehabilitation work, maintain close contact with the higher authorities, and report the emergency treatment at the scene of the accident at any time;

(four) after the typhoon, responsible for convening relevant personnel to summarize the emergency handling of the accident.

Third, the implementation of the plan

(1) received the news released by the Meteorological Observatory, which is expected to be affected by the typhoon:

1, the site project management department issued a typhoon prevention notice, and the relevant personnel of the project department paid close attention to the weather news and the typhoon trend;

2, the project intends to inform the relevant personnel and team, require all staff to cooperate closely, do a good job in the preparations for typhoon prevention.

(two) the typhoon approaching our city will affect our region within 48 hours, and the Meteorological Observatory will issue a typhoon warning:

1, the project department arranges the construction reasonably and stops the process that must be continuously constructed;

2, the project department should cooperate with the branch to do a good job of safety inspection before the typhoon, including whether the construction elevator is firm, scaffolding and other facilities are firm, whether the temporary work shed is safe, etc. And take measures to strengthen and eliminate potential safety hazards.

(three) there may be a typhoon in our area within 24 hours, and when the Meteorological Observatory issues an emergency warning:

1, the typhoon prevention leading group of the project department is in place, and personnel are arranged to be on duty;

2. The construction site stops and the construction personnel are evacuated to safety;

3, the project intends to organize personnel to patrol the scene, cooperate with the company's leading group to further check the implementation of various defensive measures, and ensure that the on-site rescue team is in place and in a state of war;

4. During the typhoon, the safety accidents with casualties on the construction site shall be implemented in accordance with the Company's Emergency Rescue Plan for Major Safety Accidents in Construction Projects.

Fourth, after the typhoon.

When the meteorological station issues typhoon warning, the project department should check the damage and report it to the branch and the head office. Strengthen the site safety facilities in time and summarize the typhoon prevention work.

Emergency Plan for Typhoon Prevention in Construction Site 5 I. Purpose:

Establish an emergency plan for flood prevention and typhoon rescue, strengthen the flood prevention and rescue ability of the management service area through the training and actual combat drills of emergency teams, eliminate dangerous situations more effectively and timely, reduce losses to a minimum, and ensure that the flood prevention and typhoon rescue work is foolproof.

Second, responsibilities:

The director of the management office is the commander-in-chief of flood prevention and typhoon rescue;

The person in charge of the management office is the deputy commander, who is responsible for the overall work of the equipment group;

The safety promoter is the deputy commander, responsible for the overall work of the rescue team;

The environmental organizer is the deputy commander-in-chief, responsible for the overall work of the logistics team;

The control center is responsible for the accurate transmission and coordination of information;

All off-duty personnel in the management office are emergency rescue team members for flood prevention and typhoon prevention.

Third, the division of responsibilities of the group:

3. 1 rescue team: it is composed of all the off-duty safety officers in charge of safety.

3. 1. 1 Take all measures to deal with the dangerous situation;

3. 1.2 Responsible for filling, handling and stacking flood control sandbags;

3. 1.3 use various methods to eliminate dangerous situations in time.

3. 1.4 Division of labor

3. 1.4. 1 Two off-duty central posts are responsible for loading sandbags;

3. 1.4. 2 2 No.2, No.3 and No.4 are responsible for transporting sandbags;

3. 1.4.3 Two off-duty No.6 and No.8 are responsible for piling sandbags on site and taking other measures for emergency rescue;

3. 1.4.4 The safety sponsor leads the rescue team to take all other effective methods to do all rescue work well.

3.2 Equipment group: consists of the manager of the management office and two technicians of the management office.

3.2. 1 Responsible for starting various pumps and power supply equipment;

3.2.2 Provide technical guidance to the rescue site;

3.2.3 Conduct emergency maintenance on the field equipment.

3.3 Logistics Group: It consists of environmental sponsors, domestic helpers, lifeguards, front desk attendants, cashiers and club attendants.

3.3. 1 Ensure the normal supply of all kinds of relief materials;

3.3.2 Be responsible for the rescue of the wounded on site;

3.3.3 Actively assist other groups;

3.3.4 Division of labor

3.3.4. 1 Two off-duty No.5 posts are responsible for logistics and material support;

The front desk attendants, cashiers and club attendants in 3.3.4.2 are responsible for evacuating people and rescuing the wounded, transferring the wounded to a safe place and reporting to the municipal emergency center in time;

In 3.3.4.3, lifeguards and domestic helpers are responsible for property rescue.

3.4 personnel on duty

4. 1. 1 When the personnel on duty find the danger, they shall promptly notify the center and the leaders on duty;

4. 1.2 After receiving the information, the attendant in the center shall take emergency gathering and other measures to call off-duty personnel to relieve the danger in time;

4. 1.3 The personnel on duty in the center shall immediately notify the management office manager, management office supervisor and safety director;

4. 1.4 center attendant reports to each duty post;

4. 1.5 Maintain the order of posts on site and guide personnel and vehicles;

4. 1.6 The attendant in the center should pay close attention to the site situation and seek other support when necessary.

4. 1.7 Before the typhoon comes, all posts in the management office should carefully check the potential safety hazards within their posts, eliminate the danger in time, and report the serious cases to their superiors in time.

Note: all members must obey orders, obey orders; All members should pay attention to their own safety during emergency rescue.

;