In study, work and life, it is inevitable to face unexpected events. In order to make an emergency response in the first place, it is inevitable to prepare an emergency plan in advance. How to prepare an emergency plan? The following is the emergency plan for flood control and waterlogging prevention in residential areas compiled by Bian Xiao for your reference only, hoping to help you.
1 Emergency Plan for Flood Control and Waterlogging in Residential Areas
First, the flood season leadership procedures
1, set up a flood control team before the flood season, with the property manager as the team leader, the deputy manager as the deputy team leader, and the team members as office staff;
2. In case of danger, the property leader must immediately arrive at the scene to carry out emergency rescue work, and notify the customer service department of the company to be responsible for allocating material resources and manpower, and the maintenance department will take effective measures according to the site conditions. The security department is responsible for deploying personnel to cooperate with emergency rescue. In case of danger at night and on weekends, the personnel on duty shall be temporarily in charge of the command, and promptly notify the flood control team leader and other members to rush to the scene.
Second, the engineering department in the flood season flood control measures
1. Set up a special storage room for flood control equipment, mainly including drainage pump, drainage hose, waterproof distribution box, woven bag, sand, shovel, etc.
2, before the arrival of the flood season, the district director should carefully inspect.
(1) Whether the drainage ditch of the roof platform is unblocked, and cleaning up the garbage on the roof at the same time;
(2) Check whether the sewage pump in the underground sump is sensitive and effective, and set the control in the "automatic" position;
(3) Check the rainwater wells, sewage wells and rainwater pipes inside and outside the community for deposits, and clean them to ensure smooth drainage;
(4) The maintenance team should check whether there is rain leakage in important computer rooms such as power distribution room and control room, and handle it in time if there is any.
(5) The flood control team leader will focus on the inspection of rain outlets, drainage pipes, sewage pumps, elevator pits and problems recorded in the past.
(6) At the same time, strengthen the inspection and patrol of electrical equipment and facilities, including lightning protection network (needle) and cable trench, and solve problems in time when found.
Third, the dangerous situation handling procedures
1. Under the command of the flood control team leader, some community security personnel maintain order, while others eliminate danger and rescue equipment;
2. The cleaning staff in residential areas should clean up the accumulated water everywhere;
3. After the dangerous situation occurs, the company office should conduct a comprehensive inspection, make statistics on the losses and material consumption caused by this flood, and replenish flood control materials in time to prepare for the next flood control.
Emergency plan for flood control and waterlogging prevention in residential areas II
According to the notice and requirements of the property group company, this emergency plan is formulated in order to do well the flood control work of the company and the project and ensure the property and personal safety of the company and the owner.
I. Organizational structure and responsibilities
(1) set up a leading group for flood control; Team leader, deputy team leader and members:
Responsibilities: responsible for the inspection and maintenance of drainage facilities and equipment of property management company and various projects to ensure that the drainage system is in good condition and effective; Strengthen patrol inspection of various projects, find leakage points in time, avoid short circuit and equipment damage caused by rain leakage, especially in high-rise rooms of various projects, and ensure normal power supply; Responsible for the maintenance of lightning protection facilities and equipment of various projects, and responsible for storing necessary flood control and disaster relief materials; In case of flood disaster, organize maintenance and rescue work in accordance with this flood control and disaster relief plan.
(two), set up four working groups under the command of the leading group for flood control.
1, establish a flood control and emergency rescue team.
Team leader: Members:
Responsibilities: Carry out flood control and emergency rescue work under the command of the leading group for flood control, and each project manager shall organize emergency rescue to conduct a comprehensive inspection of each management area, determine the cause of the accident in the stagnant water area, formulate local emergency measures and organize handling.
2. Set up an equipment support team.
Team leader: Members:
Responsibilities: Under the command of the leading group for flood control, implement flood control and emergency rescue (water pump drainage). According to the actual situation of the project, each project reasonably organizes the use of drainage pumps and other equipment to drain the areas with serious water accumulation, so as to ensure the normal management of each management area.
3. Leader of Logistics Support Group: Members:
Responsibilities: Under the command of the leading group for flood control, carry out emergency communication, statistics and logistics support. In the event of a flood, do a good job of information transmission and logistics support within the company, and after the flood, make a statistical summary of the losses caused by the flood.
4. Leader of emergency rescue team: Members:
Responsibilities: Carry out flood control and disaster relief work under the command of the leading group for flood control. When the project is in serious danger, rescue will be dispatched in time.
Flood control materials: rain boots, raincoats, shovels, woven bags, flashlights, iron wires, drainage pumps,
Trays, etc. , and designated persons are responsible for ensuring that flood control materials can be used 24 hours a day.
Third, the project manager is responsible for flood control in various regions; Strengthen flood prevention awareness training, key parts.
Check in place, report the danger to the department or company leaders in time, and take active measures to avoid the danger from expanding.
Four, all flood control communication tools must be kept open for 24 hours during the flood control period.
5. In case of heavy rain above moderate rain, the project manager must be on duty; In case of rainstorm, a full-time duty system shall be implemented.
Six, when the office on duty receives the notice of flood control, it shall promptly notify the leaders on duty and all flood control personnel.
Seven, each project on duty after receiving the owner for help information, should promptly notify the leaders on duty and project leader.
The main members of flood control quickly went to the scene to check the situation and deal with it in time; When there is a large area of water in the management area, personnel should be quickly organized to rush to the scene, and relevant equipment such as pumps should be mobilized to dredge and drain, and at the same time, the company leaders should be reported.
Eight, the usual office back office and customer service of each project should pay close attention to the weather changes, timely notify the relevant weather anomalies, and at the same time do a good job of signing the bill on duty during the flood control period, and record the major floods.
Nine, flood control materials should strengthen management, after the flood season to warehousing, for future use.
Emergency plan for flood control and waterlogging prevention in residential areas 3
In order to ensure the normal development of flood control and flood fighting in the area, implement the working policy of "safety first, always be vigilant, prevention first, and rescue with all one's strength", adhere to scientific flood control, put people first, do a solid job in flood control and flood fighting, ensure the flood control and flood fighting safety of old residential areas and bicycle garages in the area, and minimize disaster losses, this plan is formulated according to the requirements of sub-district offices and the actual situation in the area.
I. Emergency organization
1, the community set up an emergency leading group, with the community secretary as the first group leader, the community director as the group leader, and the community created a deputy group leader. Community workers, heads of resident units and community branch secretaries are members of the leading group and are responsible for leading, organizing and mobilizing the flood relief work of the whole community.
The office of the leading group is located in the community duty room, and the founding director of the community emergency office concurrently serves as the office director and alarm officer.
2. The community, with party member volunteers and young volunteers as members, set up a flood emergency team to be responsible for the flood relief work in each residential area; Community patrol is the main task, and a community emergency detachment is set up, with community workers such as community secretary, director, militia battalion commander, founding director and comprehensive management director as members, responsible for community flood fighting and emergency rescue tasks.
Second, the emergency plan
1, prevention and early warning: before the rainstorm comes, the community constantly sends out early warning and alarm; Community workers should ensure smooth communication, check, supplement and implement all emergency equipment, tools and other disaster relief equipment to ensure emergency needs; The leading group should be alert to the key households and key parts within its jurisdiction at the first time, and inform them to prepare for evacuation at any time.
2. Flood control and disaster relief: members of the leading group are in their positions, and their mobile phones are kept open 24 hours a day, with their respective responsibilities, to ensure that community residents are fully engaged in flood control and disaster relief work in a prepared, orderly and effective manner; The emergency team is responsible for organizing threatened residents to evacuate to safe places such as Jinma Hotel and Jindun Hotel, so as to ensure that there are no casualties and minimize losses.
Third, equipment support.
The necessary first-aid equipment, medicines and centralized resettlement sites for disaster relief in the community shall be arranged uniformly by the sub-district offices.
Fourth, the aftermath.
After the emergency, it is necessary to organize all evacuated personnel to move back in an orderly manner, repair facilities such as water damage, ensure that there is a solid guarantee for resuming production and self-help in production, and properly arrange the personnel and their families who cannot move back due to water damage; Organize post-disaster production, and give appropriate help to some residents and outsiders who are seriously affected and have difficulties in living and production to tide over the difficulties; Report the disaster situation, strive for government support, and ensure the smooth progress of production self-help work.
Emergency plan for flood control and waterlogging prevention in residential quarters 4
The flood control and typhoon prevention work adheres to the principle of "people-oriented, safety first, prevention first, combining prevention with resistance, ensuring key points and making overall plans". In order to do a good job in flood control and typhoon prevention, reduce disaster losses and ensure the safety of residents' lives and property. According to the Regulations on Flood Control, Typhoon Prevention and Drought Relief in Jiangsu Province and the spirit of district and street documents, combined with the actual situation of the community, the emergency plan for flood control and typhoon prevention in the community is formulated.
I. Organizational leadership
Guangfeng Sancun Community Leading Group for Flood Control and Drought Relief.
Second, the division of responsibilities
Flood control and typhoon prevention work is arranged by the community leading group for flood control and drought prevention, and each village is responsible for grading. The specific division of responsibilities is as follows:
1, the community director is fully responsible for flood control and typhoon prevention.
2. The community leading group is responsible for flood prevention, typhoon prevention and riot prevention in the whole community.
3. The community is responsible for flood control and typhoon prevention within its jurisdiction.
4, community workers in accordance with their respective responsibilities to do a good job of flood prevention and typhoon prevention, and cooperate with each other, make concerted efforts.
5, community flood control and drought relief leading group personnel in flood control, typhoon prevention, riot tide work, according to their respective flood control and drought relief responsibilities, community leaders are not allowed to go out at the same time in the flood season, the first responsible person should be assigned to the second responsible person when going out.
6. Organization of the rescue team.
A publicity and rescue group: responsible for in-depth publicity among residents, mobilizing the masses to cooperate with flood fighting and emergency rescue, and responsible for the treatment of injured people and the summary report of disaster situation.
B rescue team: organized by the property department, responsible for emergency rescue. C public security group: organized by the police station, responsible for public security work in the disaster area. D transportation logistics group: responsible for the mobilization of emergency vehicles, emergency equipment and materials, and the resettlement of the affected people.
Third, the preparatory work before the flood season
(1) Do a good job in safety inspection before the flood season and report the inspection to the leading group for flood control and drought relief for the record.
(2) Make necessary material preparations before the danger comes.
(3) According to the actual situation, formulate emergency plans and organize rescue teams.
Fourth, post-disaster recovery measures.
1, quickly organize forces to save themselves and arrange the lives of the victims.
2. Do a good job in post-disaster health and epidemic prevention to prevent disease epidemics.
3, the property management department should organize forces to repair damaged facilities.
Chapter V Emergency Plan for Flood Control and Waterlogging in Residential Quarters
According to the overall deployment of the XX Street Flood Control and Drainage Work Implementation Plan for 20xx years, in order to ensure the safety of our community, combined with the actual situation of our community, the following implementation plan is formulated:
I. Guiding ideology
Adhere to the policy of "safety first, prevention first", comprehensively improve the flood control and drainage capacity of our community, improve the pre-danger, escape and emergency rescue work, and achieve orderly organization and effective measures to ensure that there will be no large-scale waterlogging, major property losses and casualties in our community, and ensure the safety of residents in our community during the flood season.
Second, the work objectives
Further clarify the responsibilities, improve the plan, implement various flood control measures, do a good job in flood control, and ensure the safety of flood control. Ensure that the community is not flooded, the main traffic arteries are not interrupted, and ensure the normal water supply, power supply, gas supply and urban infrastructure safety. In case of excessive flood, emergency measures should be taken to ensure the safety of residents' lives and minimize disaster losses. Strengthen the prevention of natural disasters caused by floods, pay close attention to the intensity of rainfall and rainstorm during rainfall, make early warning and forecast, and formulate and implement the people's hedging plan.
Third, the flood season
1, flood season: 20xx June 20th? d? September 20th.
2. Main flood season: July 20xx 1? d? August 25th.
3. Emergency flood control period: the flood control period in case of flood disaster.
Fourth, the division of responsibilities
Under the guidance of the street flood control headquarters, community workers are fully responsible for the flood control and drainage work in their communities, ensuring that ideas, organizations, measures and materials are in place.
1. Complete the general survey of dangerous houses in China before the flood season, and supervise and coordinate the maintenance of houses and infrastructure before the main flood season. During the main flood season, the key parts of flood control should be monitored by special personnel to evacuate residents urgently; Do a good job in monitoring the danger of flood disasters; Organize territorial units and relevant departments in some key areas to do a good job in flood control and drainage.
2, according to the unified deployment of street committees and offices, to carry out material coordination, evacuation and other work. In case of disaster or danger, report to the person in charge of flood control headquarters at the first time.
Verb (abbreviation for verb) protection
1, strengthen leadership. Establish flood control organizations and implement the responsibility system of community directors. Establish a duty system, set up a duty telephone, monitor key areas 24 hours a day, report any danger in time, and ensure that all work is managed and arrested.
2, the implementation of personnel and materials. The rescue team should be based on community workers, party member and residents. At the same time, complete vehicles, shovels, sandbags and other materials.
3, clear job responsibilities. Combined with their respective work characteristics, earnestly perform their duties. These include: making the escape route of residents in emergency, and doing a good job of evacuation and mobilization of residents in dangerous houses and dangerous sections.
Emergency plan for flood control and waterlogging prevention in residential areas 6
In order to further improve the current flood control work and ensure the safety of flood control in the region, the following scheme is formulated according to the overall deployment of flood control work in provinces and cities and the actual situation in the region:
I. Guiding ideology
Guided by the implementation of Scientific Outlook on Development's important thought on building a harmonious society, we will continue to implement the 16-character policy of "safety first, constant vigilance, prevention first and all-out efforts", adhere to the principle of "unity and cooperation, local obedience to the overall situation", conscientiously implement the spirit of flood control work in provinces and cities, base ourselves on preventing major floods, grasping major risks and resisting major disasters, and achieve early deployment, early action and early disaster prevention.
Second, organize and lead.
In order to comprehensively promote the flood control work of the community service center, ensure the timeliness of flood control work and strengthen the organization and leadership of flood control work, the center has established a flood control work command group, the list of which is as follows:
Team leader:
Deputy team leader:
Members:
The command group is fully responsible for community flood control, with the secretary of each community neighborhood committee as the first responsible person, and is responsible for the daily monitoring, prevention and coordination, investigation and guidance of flood control in the jurisdiction, as well as the implementation of emergency measures.
The command group consists of an office located in the construction management section, which is responsible for flood control organization, coordination and supervision, and serves as the director and member of the office.
Provincial Great Wall Property Company Area Management Office is mainly responsible for dredging and checking the drainage pipe network in Huandong and Bai Di Haitang areas, and at the same time, do a good job in the supervision of pumping stations in flood season. All property companies in the jurisdiction should strengthen the investigation and handling of hidden dangers, plan ahead, and prepare sandbags and other flood control materials for emergencies.
Third, the main measures
(A) covert investigation
Social neighborhood committees are responsible for organizing the safety supervision and inspection before and during the flood season, coordinating the flood control work of the units under their jurisdiction, and making specific arrangements for flood control duty. Conduct a comprehensive inspection of flood control equipment and key areas in this area, eliminate hidden dangers in time and report them to ensure safety in flood season.
(2) Early warning and emergency rescue
For all kinds of possible dangers, we should carefully check and deal with them in time; During the flood season, it is necessary to strengthen patrol inspection, and once an abnormality is found, it is necessary to give an early warning and report to the superior; For the danger that has happened, we should immediately organize manpower and material resources to take effective measures to rescue and prevent the danger from expanding; It is necessary to properly arrange people's lives, do a good job in post-disaster treatment and health and epidemic prevention, and maintain social stability.
(3) Disaster statistics
All communities should attach great importance to the statistical work of flood disasters, earnestly strengthen leadership and strictly implement the statistical system. After the disaster, it is necessary to report the disaster immediately and report the development and changes of the disaster in time.