Chapter 1: Overview of professional and technical titles.
Summary of professional and technical work
1July, 1998, I successfully completed my studies, graduated from Shenyang University of Electric Power, majoring in thermal detection and control technology, and was assigned to work in the thermal power plant of Ordos Group in the same year. Since joining the work, I have been engaged in thermal maintenance work of thermal control specialty. In August of 20xx, I obtained the qualification of assistant engineer. During my work, I have been studying, researching and summing up experiences and lessons. I have grown from a layman in the power industry to a technical post manager with comprehensive and mature professional technical ability and management ability. I have independently undertaken the on-site management of power engineering, and have made great achievements in political thought, professional ethics and professional and technical level.
I. Political thoughts
Since I joined the work, I have strictly abided by the laws and regulations of the country and have never participated in any illegal and disciplinary activities. Firmly support the leadership of the China Producer Party, adhere to the Party's reform and opening up, take the "Theory of Three Represents" spirit as the action program of their work, and make their due contributions to building socialism with China characteristics. I actively demand progress, pay attention to ideological quality training and comprehensive ability building, and strive to make myself firm in belief, disciplined, knowledgeable and proficient in business. I strictly abide by the rules and regulations formulated by the unit, be strict with myself and be lenient with others, and play an exemplary role.
Second, work attitude and professional ethics
I officially joined the work in July 1998, when I was assigned to the thermal workshop of Ordos Group Thermal Power Plant in Ordos City (formerly a branch of Zhao Meng) for thermal maintenance. At the beginning of my work, I found that the professional knowledge I learned at school was very different from the actual work.
Gap, in order to change the role as soon as possible, to adapt to the work requirements, I study hard thermal professional knowledge and improve my work skills. Thermal control major is a major with high technical content and rapid technical renewal in power plants. It needs continuous learning to improve and enrich its professional knowledge, correct its learning and working attitude, and seriously study its own business. With the enthusiastic help of leaders and colleagues, in a relatively short period of time, my thermal engineering professional level and working ability have made great progress. At work, I always remind myself to finish my job down-to-earth, seriously and persistently, and strive to improve my professional and technical level and comprehensive quality.
Third, knowledge level and professional ability.
Since 1998 entered the factory, it has participated in many minor repairs and major repairs in the thermal power plant of Ordos Group, and participated in the technical transformation work such as frequency conversion adjustment of # 1 unit #2 low-pressure drain pump and frequency conversion adjustment of # 1 boiler powder feeder. During the period of 1999, the # 1 and #2 units of Ordos group thermal power plant began to prepare for the transformation of turbine flow and thermal control DCS system. I participated in the preparatory group for the design of thermal control DCS system, and participated in the design of the construction drawing of thermal control system. In the whole design process, I have gained quite a lot of experience in thermal PID diagram and thermal control design principles. From 20xx to 20xx, the ventilation and control systems of the two units officially began to be reformed. I participated in the overhaul and transformation of thermal control DCS system of # 1 and #2 units, and was responsible for the installation and debugging of DCS system.
From June, 65438 to June, 20xx, he participated in the 72+24-hour related debugging of boiler and turbine systems of units #5 and #6 of Shandong Qi Xing Power Generation Co., Ltd., and successfully connected to the grid for power generation. Establish and improve various accounts of thermal control specialty, such as equipment account, standard instrument account, forced inspection pressure gauge calibration account, daily defect elimination account, working ticket account, spare parts account, etc. , and cooperate with electrical specialty to complete the frequency conversion and power frequency DCS debugging of primary fan and induced draft fan, and the switching and input of high voltage switch, power frequency and frequency conversion;
In May, 20xx participated in the professional debugging of thermal control of 72+24-hour boiler system of # 1 and #2 units of Hui Neng Group Meng Nan Power Generation Co., Ltd., and successfully connected to the grid for power generation. Under the professional technical guidance of Shanghai Xinhua DCS, the operation and transformation of isolated network in our factory was successfully completed. Through the control ability of DEH, the power and speed can be adjusted only by primary frequency modulation, secondary frequency modulation and OPC. These two units are
20xx 65438+ 10, participated in the 72+24-hour thermal control professional debugging of two 135MW circulating fluidized bed units of Jingneng (Chifeng) Energy Development Co., Ltd., and successfully connected to the grid for power generation at the end of 20xx. At the beginning of production, due to the defects of Liaoning Design Institute, the PLC lower program and IFIX upper screen of the coal conveying program control system were systematically optimized, thus completely solving the operation problems of the coal conveying system. Then, the PLC program control system of chemical water treatment, ash removal, electric dust removal, industrial wastewater and comprehensive water pump room is comprehensively optimized and reformed, giving full play to the sequential control function of PLC, ensuring the safe and stable operation of peripheral auxiliary equipment and ensuring the safe operation of the whole unit.
Due to my good professional ethics, professionalism, strong sense of responsibility and dedication, after more than a year, the peripheral equipment management under my jurisdiction has made a qualitative leap in equipment hygiene and equipment operation, and made outstanding contributions to the safe and stable operation of the unit, the completion of the annual power generation task and various management objectives. I was also rated as an advanced worker of the company in 20xx.
20xx is the year of energy saving and emission reduction for Jingneng (Chifeng) Company. I earnestly implement the spirit of the documents related to energy conservation and emission reduction, and start from the details, so as to truly repair and not change, and start from usual.
Start with a drop. Increase the cost of repairing old instruments, repair the replaced old instruments, and reduce the maintenance cost of thermal control specialty as much as possible; Do a good job of checking and calibrating all instruments in the heating network; And focus on monitoring key instruments; For expensive equipment such as DCS and PLC, do a good job in the inspection and maintenance of DCS and PLC systems to ensure the long-term safe and stable operation of the boiler; It is necessary to save expenses, reduce costs and truly implement energy conservation and emission reduction;
Fourth, learn professional knowledge and improve job skills.
As a technician of thermal energy engineering, I always take "comprehensively improving the quality of equipment maintenance and enhancing the stability of equipment" as my own responsibility, and according to my own scope of responsibilities and post responsibilities, it runs through the maintenance work throughout the year, whether it is the formulation of technical scheme, the tracking of maintenance quality process or the arrangement of equipment maintenance files, I can make accurate and timely improvements. The electric power industry is a technology-intensive enterprise. As a professional technician in the electric power industry, it is my unshirkable responsibility to do a good job in technical management and equipment transformation. To this end, I will study and innovate persistently, master new technologies, new processes and new methods, and apply them to the comprehensive management of equipment. In more than ten years' work, although we have made some achievements and made some contributions to equipment management, we should guard against arrogance and rashness in future work, constantly learn and innovate, and make greater contributions to technical management and equipment management.
The above is a summary of my main technical work in thermal engineering. The electric power industry is an industry with deep knowledge and wide knowledge. It can be said that it is an "old-fashioned" industry. In my future work, I will study cultural knowledge and professional knowledge harder, practice constantly, do my job well and make more contributions to society.
Now I have met the requirements for applying as an engineer, and hereby apply for promotion to the title of engineer.
Summarized by: xxx
20xx May 20th
Chapter II: Overview of professional and technical work of assistant titles.
20xx successfully completed his studies in July, graduated from the Department of Architectural Engineering Management of # # # College, majoring in engineering management, and came to work in China in the same year. I have been engaged in on-site construction and management since I joined the work. The following is a comprehensive summary of my work in the past 1 year from a professional and technical point of view:
First, learn professional knowledge and improve professional skills.
At the beginning of my work, I found that the professional knowledge I learned at school was very different from the actual work. In order to change my role as soon as possible and adapt to the work requirements, I study hard the professional knowledge of water conservancy and hydropower and improve my work skills. At school, my major was construction engineering management. Specifically, I worked as a construction technician in water conservancy and hydropower projects. For me, the biggest problem may be the professional span, but I have not lost confidence. I consulted relevant books and materials, carefully recorded every relevant knowledge point, and asked the old-timers for advice if I didn't understand it. Finally, through my own efforts and the help of my colleagues, I can skillfully carry out complex daily affairs such as site management of water conservancy projects.
Second, political thought.
Politically, I actively participated in various political activities of the Party organization, consciously studied the Party's political theory, especially Marxism-Leninism, Mao Zedong Thought and Theory of Three Represents, and strived to improve the quality of political theory, practice Theory of Three Represents, and keep consistent with the CPC Central Committee in thought and action.
As a party member, I am always strict with myself. Like some colleagues, I gloriously joined the China * * * Production Party during my college years. At that time, I was far from realizing the importance of being a pioneer model in party member. Since I joined the work, the Party branch secretary of the project department has held regular meetings for us in party member to convey the spirit of the party's meeting in time and ask us to study and implement it seriously. Not only that, but also called on party member to take active actions, use his words and deeds to drive the masses of the project department, and earnestly fulfill the party's obligations. Start with small things: at work, be brave in taking responsibility and finish daily work seriously; In life, we should be thrifty, not waste every grain of food, and respect the' labor achievements' of canteen staff. In Langfang Project Department, I participated in the Youth Volunteer Commando organized by the Project Department, and in Xichuan, I participated in the Youth Commando organized by the Project Department, contributing to the project!
I always ask myself to have a strong sense of the overall situation and organizational concept, put my career first, regardless of personal gains and losses, put my position in a new position, put the interests of the broad masses of the people first, and strive to practice the fundamental purpose of serving the people wholeheartedly. Be fair, just, just and upright in the work, have strong professionalism and dedication, work hard, be proactive, have a down-to-earth style, do not shirk, and stress efficiency. Pay attention to investigation and study, be diligent in thinking, have clear working ideas, and be able to combine the general theory of on-site construction management with work practice.
Third, organization and coordination
As a newcomer, in practical work, I try my best to learn to analyze, study and solve problems by using Marxist standpoints, viewpoints and methods, and have certain organizational and coordination abilities. In the first project I did, I didn't notice the importance of this at first, until I gradually found that organization and coordination are also skills we must master. From a big perspective, the development of a country can not be separated from the organization and coordination of relations between regions; From a small point of view, the quality of a project operation is inseparable from the organization and coordination between various departments and offices. At the beginning, I was exposed to simple basic operability such as personnel coordination and mechanical scheduling.
Organize the work step by step, and then slowly enter into the participation in the progress and construction control of the whole project, and even the organization and coordination of the whole project.
The compilation and improvement of construction schedule is particularly obvious in this respect. We prepare quarterly schedule, monthly schedule and weekly schedule according to the total construction schedule, so the preparation of each schedule is equivalent to the simulation implementation of a project. We should not only consider the influence of basic construction conditions, but also consider the progress of material supply, the availability of funds, transportation and power supply.
These are all theories that I can't learn in school, but when it comes to the project, the specific work gives me a good opportunity to combine theory with practice. Of course, the valuable experience and earnest instruction of many old masters have saved me a lot of detours. I will apply the experience they taught me to practical work to improve my organization and coordination ability and work efficiency!
Fourth, business ability.
From a college student to a staff member, from having no work experience to steadily accumulating work experience, from scratch, from ignorance to mastery, five projects have brought me great changes in the past year. I realized the transformation from gradually reporting the daily construction report to compiling the weekly work plan, and from learning the construction plan to writing the construction technology myself. This accumulated bit by bit, my work ability was recognized, my business ability was improved, and I gradually formed my own set of methods to deal with problems.
Today's society is a society that needs continuous learning, and the concept of learning is the best embodiment. To do a good job, you must have a considerable level of business ability. Where does the business ability come from, the accumulation of practical experience, and continuous learning. Since I joined the work, I have worked hard to learn the theoretical knowledge and professional skills of related majors, attached importance to constantly improving my professional level, and studied through different forms and channels in my spare time according to the actual needs of on-site construction management, in an effort to improve my professional and technical ability and level.
Although we are on the construction site, the project department provides us with a good office environment and study conditions. Each department is equipped with relevant books, for example, the engineering department has books on construction technology and management, and the quality department also has relevant construction quality specifications and so on. These professional books and free teachers provide indispensable quality resources for my study. Coupled with the coverage of wireless networks, some professional and technical things can quickly find resources (pictures and videos, etc.). ) online, which makes our learning techniques more vivid and relaxed, and makes our learning more convenient and fast. Through hard work, my professional skills and ability to control my work have been greatly improved, laying a solid foundation for better completing various tasks.
Five, all-round learning all kinds of knowledge
Society is progressing and human beings are developing! What is the competition in 2 1 century? It is the competition of talents! In the final analysis, it is the competition of technology, and all walks of life are trying to change themselves and arm themselves in order to survive. In my opinion, knowledge is the best weapon. We are in an era of rapid development of science and technology, and advanced science and technology make our work more handy and efficient. In such a big environment, I firmly believe that continuous learning is the ultimate weapon of change, the magic weapon of creating kings and the only way to survive!
In order to better adapt to the present work, while trying to do my job well, I attach great importance to continuing re-education and learning, and have participated in technical training organized by departments at all levels for many times, taught myself relevant software and used it skillfully.
Participate in various trainings by yourself. In 20xx years, I participated in the training of operation department of project department, safety production training of safety department and project quality control training. In 20xx, I participated in the English training of Xi 'an International Studies University in the remedial class, and I also spent a little time learning the pricing software of Guanglianda. These trainings not only improved my comprehensive working ability, but also enhanced my confidence in myself! I believe that in the future work, I will be able to complete the tasks assigned by the leaders more smoothly.
Problems in intransitive verbs
In terms of technology, technical research is not deep and knowledge is relatively narrow. Due to the limitation of my major, my knowledge reserve in hydropower is obviously insufficient. In the process of construction management, I also found problems that I hadn't found before, such as lack of communication and exchange. In handling work, the ability of pioneering and innovation is insufficient, and there are few bright spots in management, and the decision-making ability and level of management need to be improved. In dealing with people, I still can't handle things with ease, which is also the key part that I need to strengthen in my future work. These are the shortcomings I have found from myself since I joined the work for a year. As we all know, the carrier of management itself is mostly personnel management, which also determines the uncertainty of management work. Based on this, management is particularly important. If the management of each department is in place, the management of the whole project department will go up.
In the future work, I will work harder to learn the relevant knowledge of water conservancy and hydropower industry, so as to make my work in this position more handy. I will start from myself, find the shortcomings in the process of construction management and strengthen communication with people. I will strive to improve my divergent thinking and jump thinking ability in pioneering and innovating. In dealing with people, I must learn from the old-timers in the project department bit by bit and do more empathy. In a word, I must study harder, use the basic law of hard struggle, constantly improve my working methods, improve my work efficiency, be down-to-earth and work hard to become a qualified professional and technical personnel in construction management.
;