Careful planning is the key
The construction scheme of electric hanging basket is the premise of the smooth operation of electric hanging basket, which needs to include matters needing attention in equipment selection, installation, operation and dismantling, as well as configuration arrangement and relevant approval. The scheme needs to be targeted and feasible, and the hanging basket should be selected according to the engineering characteristics to ensure safety and meet the construction requirements.
Equipment entering the site shall be strictly controlled.
The electric hanging basket equipment entering the site should match the scheme, and the accessories should be complete and intact. It is necessary to carefully check the material entry list to avoid mixing different models or replacing large ones with small ones.
Monitor the installation process
When electric hanging baskets enter the construction site in the form of components, it is necessary to monitor whether each hanging basket is correctly assembled and installed according to the scheme to ensure that it is firm, complete in components and safe and reliable in place.
The acceptance link is indispensable
After the electric hanging basket is installed, relevant personnel shall be organized for joint acceptance, focusing on the installation location, structural assembly, counterweight, safety rope and safety lock. Hanging baskets without acceptance are forbidden to be used.
Train operators.
Appropriate operators should be selected for relevant training and education, including operation and emergency treatment, to improve their awareness of self-protection. It is forbidden to throw sundries down, so as not to hurt others.