1. Login to the examination websites of local personnel centers and China personnel center.
2. Then click Online Registration.
3. Fill in your candidate information. If you don't have an account, register one yourself, set the password, enter the required information according to the information, such as personal education certificate, application form, personal work certificate, etc., and complete the registration according to the specifications.
Related information:
1, eight members of the construction industry are generally organized by the unit to register for the exam. The eight key technical posts of a construction enterprise are builder (surveyor), quality engineer, safety officer, standard engineer, material engineer, mechanic, laborer and documenter.
2. Application conditions: minimum education, technical secondary school education, major in civil engineering or architecture, and 4 years working experience. At present, many managers with low academic qualifications can take an adult secondary school (graduate in 8- 10 months) and get the qualification to apply for the exam.
3. Main inspection contents:
(1) Work under the direct leadership of the project manager, implement the policy of safety first and prevention first, do a good job in safety prevention according to regulations, and implement safety work.
(2) Be familiar with the construction drawings, prepare various construction organization design schemes and construction safety, quality and technical schemes, and prepare individual project progress plans, manpower and material resources plans and machinery and equipment plans.
(3) Prepare the civilized construction site implementation plan, rationally plan and arrange the general plan according to the engineering site, and arrange, implement and create the civilized construction site. Prepare the overall project schedule and monthly schedule, as well as the monthly schedule of each construction team.
(4) Do a good job of cost accounting of sub-item general contracting (by single item and sub-item) in time, and inform the management personnel of the contracting department of the accounting results in time, so as to improve the construction plan and scheme in time and strive for higher benefits.