Party A:
Party B:
Based on the principles of fairness, voluntariness, honesty and credit, Party A and Party B have fully understood and negotiated to sign this house construction contract.
1. Party A will carry out construction in suyu district.
Second, the engineering structure: the whole frame and wall are built with clay hollow bricks.
Three, this project adopts the form of total contract, to ensure the quality and safety of materials, according to the construction area multiplied by the unit price of square meters. The calculation method of construction area is calculated according to the national construction budget, and whether there are extra-budgetary funds within the contracted scope.
Four. Duration: years to years, subject to the Gregorian calendar, and Party B must complete the project within the specified time. If there is any delay, Party B shall be liable for breach of contract.
Verb (abbreviation of verb) construction content:
1. The civil works of this building shall be carried out according to the construction drawing of the regular design institute provided by Party A. Except for external wall insulation, doors and windows, interior wall tiles, floor decoration, stair handrails and interior wall paint, the interior wall and floor are plastered with mortar. The external wall is an external wall brick approved by Party A. All engineering quality shall be inspected and accepted according to national standards, and those unqualified shall be reworked immediately until they are qualified.
2. The hydropower part of this project shall be installed and constructed according to the construction drawing standard. Party B is responsible for junction box, junction box, switch box, lightning protection, downpipe, etc. Other materials such as cable switch boxes, switches, lamps, water supply and drainage pipes and accessories shall be provided by Party A, and Party B shall be responsible for installation and storage.
Six, construction safety:
1. The ashamed party shall abide by the regulations on engineering construction and construction safety management. Strictly follow safety standards and specifications. Designate a person to be responsible, and actively take safety measures to eliminate all hidden dangers of safety accidents.
2. Party B shall conduct safety education and training for all construction personnel, bearing in mind that safety comes first and everyone stresses safety.
3. Party B must sign labor contracts for all construction personnel and purchase full insurance, and Party A will not bear any economic losses and other losses caused by any safety accidents.
4. In case of heavy casualties and other safety accidents, Party B shall immediately report to the relevant departments in accordance with relevant regulations and handle them according to the requirements of relevant government departments, and all expenses incurred by the accidents shall be borne by Party B. ..
Seven, the project price:
Eight, the project payment method:
1. After the contract is signed, Party B shall pay Party A and start the construction.
2. After the foundation is completed and accepted.
3. Payment of project funds For each floor completed, Party A shall pay the project funds to Party B..
4. After the roof is accepted, Party A shall pay Party B the total amount of.
5. Party A shall pay Party B the total amount of.
6. Within one month after the acceptance of the project, Party A shall pay 97% of the total project payment to Party B, and 3% of the total amount shall be the quality deposit, which shall be paid in full one year later.
Nine. Other requirements: If Party A changes during the construction, Party B shall bear the expenses within 2,000 yuan. Party A doesn't pay any fees, and only calculates the material fee for the excess. All production and living facilities such as machinery, equipment, tools and templates required by Party B shall be provided by Party B, and Party B shall obey and respect the reasonable arrangement and construction of Party A's construction personnel. Party B shall communicate with the project management personnel more, coordinate the surrounding relations and ensure the smooth progress of the project. Party B shall bear the electricity and water charges of the project.
X. liability for breach of contract:
1. Party B must complete the work within the specified time. In case of delay, a fine of 1,000 yuan per day (¥ 1000 yuan/day) will be imposed according to the contract date. If Party A fails to pay according to the contract requirements, it shall pay 2% of the payable amount to Party B. If Party B breaches the contract and stops work during the construction, Party A has the right to invite another construction team to enter the site for construction.
2. Party A shall be responsible for the workers' wages and reserve rent caused by Party A's failure to pay the project payment in time.
XI。 This agreement is made in duplicate, one for each party, and shall come into effect after being signed.
Party A:
date month year
Party B:
Civil construction contract II
Party A:
Party B:
Party A needs to build a new house now, and both parties reach an agreement on the construction of this construction project based on the principles of equality, voluntariness, fairness and good faith, and hereby conclude this contract.
I. Form of project contracting
This project is contracted to Party B in the form of general contractor, and Party B shall undertake the machinery, formwork (clear water wood), horse pole, safety rope, cutting machine and other tools required for the construction operation. Party A is responsible for dustpan, nails, iron wire, binding wire, covered electrode and other auxiliary materials.
Second, the scope of project contracting
1. Foundation works: subject to the design and construction drawings. The foundation shall be excavated to the hard soil layer recognized by Party A, and Party B shall also be responsible for backfilling and tamping the foundation.
2. Main works: Bricklaying, steel bar making, formwork (fair-faced formwork), concrete pouring and other sub-projects shall be carried out in strict accordance with the design and construction drawing and the modification scheme negotiated by both parties.
3. Plastering works: the interior and exterior walls are made of latex paint to the east and wall bricks to the south. Party B shall be responsible for putty and Party A shall be responsible for latex paint. In case of any change, Party A shall notify Party B in advance.
4. Door and window engineering: Party B shall keep the size of doors and windows in strict accordance with the construction requirements during the construction, and cooperate with the construction of related projects.
5. Water and electricity installation project: Party A proposes the scheme, Party A supplies the materials, and Party B is responsible for the installation. In case of any change, Party A shall notify Party B in advance.
6. Accessory and decoration works: septic tank and roof pool, full eaves, interior and exterior wall painting, floor tiles, doors and windows, large glass, exterior wall horseshoe, footstone, bathroom and kitchen decoration, ceiling, console and waterproofing shall be provided by Party A, and Party B shall carry out construction and laying according to the design and construction drawings and Party A's requirements.
7. According to the actual construction area, the price is 270 yuan per square meter (270 yuan /m2). Slope roofs and balconies are calculated at half price according to the national construction area calculation rules, that is, one hundred and thirty-five yuan per square meter (135 yuan /m2), and the gate and fence shall be negotiated separately.
Third, the quality requirements
Party B must carry out the construction in strict accordance with the drawings and the agreement of both parties, and the construction quality shall meet the design requirements and the current national construction specifications and relevant standards. If the quality requirements are not met due to the reasons of the construction party, Party B shall bear all losses except working hours. Party B must save materials in the construction, and shall not cause waste artificially.
Four, the project contract price and payment method.
Party A contracts to Party B at the price of 270 yuan per square meter (the construction area is calculated according to national standards). Pay RMB 654.38+0,000 yuan after foundation pouring is completed; After each floor is capped, 654.38 million yuan will be paid; Pay 20 thousand yuan after the completion of internal and external plastering; 20,000 yuan will be paid after the whole house is pasted, and the rest will be accepted within one month after it is completely completed. After acceptance, the balance shall be settled and paid off. However, Party A shall deduct 20 17 yuan from Party B's project payment as maintenance deposit, and pay it one year later.
Verb (abbreviation for verb) building safety
During the construction period, Party B must do a good job in safety management, safety precautions and exit at the construction site.
Other personnel within the construction scope shall work safely, and Party B shall be responsible for the safety accidents and industrial accidents caused by Party B during the construction. Party B shall take full responsibility for the injured construction workers and other personnel, and Party A shall not take responsibility.
Other intransitive verbs: Party A should actively cooperate with Party B to improve neighborhood relations. Party B must calculate the materials that Party A needs to purchase in advance and inform Party A. ..
Seven. Construction period: March 1 day, 2065438 to July, 3 1 day, 20 17, 2065438.
Eight. Matters not covered: Party A and Party B shall settle through negotiation.
Nine. This contract is made in duplicate, and shall come into effect after being signed by both parties and stamped with their handprints. After the completion of the project, this contract will be automatically terminated after the acceptance and settlement by both parties are completed and the project payment is paid.
Party A:
ID number:
Party B:
ID number:
date month year
Civil construction contract 3
Construction unit (individual): (hereinafter referred to as Party A)
Construction unit (individual): (hereinafter referred to as Party B)
According to the relevant clauses and provisions of the Contract Law of People's Republic of China (PRC) and the Construction Law, the two parties have reached the following agreement on the specific conditions of highway contracting projects, which shall be followed by * * * *:
I. Overview of the Project:
1. Project name:
2. Project location:
3. Project content and scope: Complete the civil works above the foundation of Party A (including internal and external painting, including toilets).
4. Contracting method: cleaning workers contract, and Party A provides the binding wires (lead wires) required for the shelves.
5. Construction date:
6. Quality grade: excellent
7. Building hours are RMB/m2;
Two. Party A's work
1. Party A shall provide building materials such as cement, steel bars, sand, pebbles, tie wires (lead wires) required for civil engineering shelves, and ensure the supply of building materials by Party B. ..
2. If Party A needs to change the drawings, it shall notify Party B in advance.
Three. Work of Party B:
1. Do a good job in construction according to the construction site and construction drawings.
2. Party B shall not change the construction drawings at will.
3. On the premise of ensuring the engineering quality, Party B saves/contracts materials and concrete mortar, and the mixture ratio is constructed according to regulations.
4. Do a good job in the safety fence and civilized construction on the construction site.
5. The finished products of the project shall be protected by Party B before completion and delivery, and Party A shall be responsible for the completion acceptance and delivery to Party A. ..
6. Party B must guarantee the construction quality. The main structure and completion quality must meet excellent standards. All consequences caused by quality problems shall be compensated by Party B. ..
Fourth, the construction period, acceptance
1. construction period: the construction period of the main project is 50 days from commencement to completion (excluding painting of internal and external walls).
2. The project quality must be comprehensively inspected by the construction personnel sent by Party A. ..
3. After the completion of each floor, the construction of the next floor can only be carried out after the acceptance of the builder designated by Party A. ..
Verb (abbreviation for verb) Payment and prepayment of project funds:
1. All advance payment and settlement can only be paid after acceptance by the builder designated by Party A. ..
Other intransitive verbs:
1. During the construction period, Party B shall strictly abide by the safety operation regulations. In case of any safety accident during the construction period, Party B shall bear all responsibilities and expenses.
2. This contract shall come into effect as of the date of signing.
3. This contract is made in duplicate, with each party holding one copy.
Party A (seal): Party B (seal):
Representative of Party A (signature): Representative of Party B (signature):
Date of signature: year month day.
Civil housing contract 4
Party A:
Party B:
Through negotiation between both parties, Party A plans to build a house in Shang Xian New Village, with an area of about 1 12 square meters, and Party B will be responsible for contracting the project construction. This contract is hereby concluded as follows:
First, the way of contracting:
1. Party B undertakes the construction, and workers should pay attention to their own safety when entering the construction site. Party B is responsible for the expenses of nails, wire, sitting plane, key head, shovel, boiled water, tobacco, foundation floor burst and 3 cm steel protective layer. Party B shall be responsible for laying bricks, river sand, gravel, lime, cement, steel and water pipes. Labor, construction technology, steel binding technology, tree formwork and splint support, crane, yard nail, connecting plate and all production and living appliances shall be borne by Party B. ..
2. Flowers and plants have three rows of floating bricks on each floor. There are 13 pillars in the whole building, 50× 30cm, of which four pillars are 50× 50cm, the beam depth is 50× 20cm, and the protective layer of steel bars around each pile is 3cm. The building has 40cm floating windows up and down, and both sides of each floor float out. Party A adds square meters, and each square meter has windows floating on one side.
Second, a fine of five thousand yuan.
This contract is made in duplicate, one for each party. This contract shall come into force as of the date of signature and have the same legal effect.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Civil housing contract 5
Party A:
Party B:
Form of contract:
1. Party B is responsible for contracting 1#-3# multi-storey residential building's indoor and outdoor decoration works, painting and painting works, and contracting materials marked in drawings, and others are contractors.
2. When Party B enters the site, Party A provides accommodation, and the living expenses shall be borne by Party B (living and water and electricity expenses shall be borne by Party B).
3. Party A shall provide mixers, water pipes and trolleys (trolleys shall be maintained by Party B).
Contract price:
1#-3# renovation project of multi-storey residential building, painting and oiling project (contracting work and materials) shall be contracted by Party A to Party B at the price of 56 yuan/m2 (construction area).
Contract content:
Party B is responsible for the decoration construction works (excluding waterproof works) of the drawing design of 1#-3# multi-storey residential building, such as roofing works, plastering works, painting works, floor works, outdoor aprons and all insulation parts.
Quality requirements and acceptance criteria.
This project is designed for intermediate plastering, and the quality standard is qualified. The specific requirements are:
1, the allowable deviation of verticality of the positive surface is 3 mm, the flatness is 2 mm, and the angle of yin and yang is 2 mm. ..
2, the positive look and feel is flat and smooth, the color is consistent, there is no empty drum, there is no obvious connection, and it is responsible for the plastering lining of indoor ceiling height with large error.
3. The angle of Yin and Yang should be vertical, the lines should be straight, the upper and lower floors of the outer balcony and window sill should be straight, the balcony board and bay window board should be of the same thickness, and the flashing should be done well.
4, paint and pure engineering surface should be smooth, smooth, consistent color, no sagging, peeling rust and other phenomena, and completes the finished product protection.
5. If the above requirements fail to meet the qualified requirements, economic penalties will be imposed on rework and material waste.
Completion time:
Party B shall complete all contract work items within 30 days from the date of entry and meet the acceptance criteria. If it is not completed within the time limit, it will be fined RMB for each day of delay (including rainy days).
Payment method:
1. Party A shall pay the project progress payment to Party B according to% of the completed project amount (it must pass the acceptance).
2. Other payments shall be paid within three months after the completion and acceptance of all projects contracted by Party B.. Maintenance, use and material saving of tools and equipment;
1. Party B must use the equipment and tools on the construction site reasonably and safely.
2. Party B shall regularly maintain and repair the on-site equipment and tools.
3. Party B shall pay attention to saving materials, reasonably mixing materials and using up materials on the same day.
4, the ground mortar increases with the increasing use, it is forbidden to ground ash as garbage landfill, if found a fine 200 yuan.
5. Party B shall do a good job of "three clean-ups and six good practices" and clean up the working face at any time.
Civilized construction and safe production:
1. When Party B comes into the site, it must carry out the construction in strict accordance with the technical operation procedures for on-site safety production.
2, the correct and safe use of all electrical equipment and temporary electricity in the construction site, must wear a helmet.
3, workers are not allowed to wear slippers to work, no bare arms, no defecation anywhere.
4, workers should be civilized construction, are not allowed to swear, call names, it is forbidden to find a model essay to fight, if found a punishment 500 yuan.
5. Workers should go to work in strict accordance with the operating procedures. In case of casualty, all economic expenses and losses shall be borne by Party B. This agreement is made in duplicate, with each party holding one copy.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Five related clauses about the simple contract of civil buildings;
★ 5 contracts for simple construction and installation works.
★ 3 rural private housing contracts
★ 4. Model contract for private self-built houses
★ The latest three private building contracts.
★ 3 model construction contracts.
★ 3 model private housing contracts
★ The latest 3 templates of simple building contract.
★ 4 sets of standard self-built house contract templates
★ 5 copies of model contract for rural self-built houses.
★ Simple contract template for construction project
var _ HMT = _ HMT | |[]; (function(){ var hm = document . createelement(" script "); hm.src = "/hm.js? fff 14745 ACA 9358 ff 875 ff 9 ACA 1296 B3 "; var s = document . getelementsbytagname(" script ")[0]; s.parentNode.insertBefore(hm,s); })();