Construction technology of epoxy floor paint Matters needing attention in construction of epoxy floor paint
As we all know, primer is very important in the construction of epoxy floor paint. Under normal circumstances, if the primer is not well done, the quality of the floor will be greatly reduced, and the epoxy floor will blister and fall off. Here Rilong Bian Xiao introduces the construction technology and matters needing attention of epoxy floor paint.

I. Construction Technology of Epoxy Floor Paint

1, general processing:

(1) The base floor shall be based on the smooth surface of cement powder or grindstone;

(2) The plain land shall be maintained for more than 28 days, and the water content shall be below 8% before construction. If it is uneven or empty, it needs to be removed;

(3) leveling the ground with epoxy mortar;

(4) The oil pollution in the plain should be thoroughly cleaned up;

⑤ Before construction, keep the construction site dry and clean.

2. Primer:

(1) Keep it clean before construction. If there is any debris attached, it should be removed. The main agent and hardener should be mixed in the correct proportion and fully stirred.

② Adjust the proper viscosity according to the ground conditions, and the construction should be completed within 4 hours.

③ The curing and hardening time of the primer is about 8 hours or more.

3. In the coating

(1) Before construction, it needs to be kept clean. If there is debris attached to it, it needs to be removed. The main agent and hardener should be mixed in the correct proportion and fully stirred.

(2) adding a proper amount of quartz sand into the mixed resin;

(3) evenly daub the material with a trowel;

(4) Mixing materials should be completed within 30 minutes;

(5) Handle the handover at the construction junction;

⑥ The curing and hardening time of the intermediate coating is about 8 hours or longer.

4. A batch of soil layers

(1) Mix the main agent and the curing agent according to the correct ratio and fully stir;

(2) evenly coating materials with a batching knife;

(3) The mixing needs to be completed within 30 minutes;

④ The curing and hardening time of the batch of soil is about 8 hours or more;

⑤ According to the actual needs, the construction times should be smooth, without holes, batch knife marks and sanding marks.

5. Surface coating

(1) Before construction, it should be kept clean, and if there are any sundries, it should be removed;

(2) the main agent is stirred evenly before use;

(3) mixing the main agent and the curing agent in a correct proportion and fully stirring;

(4) evenly coating and mixing the materials with a roller or a trowel, and completing the construction in 30 minutes;

(5) Construction joints need to be handled well;

⑥ After the construction is completed, it is not allowed to enter until 24 hours, and it can be pressurized until 7 days (subject to 250C, and the opening hours will be appropriately extended at low temperature).

Second, the epoxy floor paint construction matters needing attention

1. substrate-a good substrate is the guarantee of good coating of epoxy floor paint. We suggest that our technical experts go to the site to guide the construction when brushing the floor, so as to avoid the poor coating effect of epoxy floor paint because of the poor substrate effect.

2. Materials-All used epoxy floor paint materials must undergo strict inspection and configuration, and all incoming materials must undergo inspection to prevent the use of unqualified products.

3. Tools-High-quality rollers, spray guns, paint brushes, textured paper and other tools and auxiliary equipment must be used to avoid quality problems caused by poor tools.

4. Personnel-All construction personnel must undergo on-the-job technical training. Scientific construction steps and technology of epoxy floor. All construction personnel should be familiar with the technical indicators and construction methods of the construction technology. Blind construction and brutal operation are absolutely not allowed, especially when painting, you must have more than three years of work experience.

5, the construction temperature of 5℃ or higher, 6, to ensure the air circulation in the construction. When adjusting the dosage, it should not exceed 30 minutes.

7, do a good job of maintenance in the construction process, to avoid dust, debris intrusion, affect the paint effect.

8. After the construction is completed, it needs to be cured for at least 7 days before it can be put into use. During the curing period, water or various solutions shall not penetrate.

9. It is forbidden to mix with other paints.

10, and the curing agent must be added in strict accordance with the specified proportion.

1 1. Keep the surface of the coated object clean, and the water content of the coated object must be less than 7%.

12, keep the painting environment clean, and it is forbidden to construct in dusty environment.