Workshop director's annual work summary ppt
No, I prepared the article "ppt of Workshop Director's Annual Work Summary" for you. I hope it helps you!

It has been four months since I joined the manufacturing department of a company in xx as the workshop director, and I have tasted the bittersweet wine bottles. Under the leadership of leaders at all levels, increase mechanical equipment; Stability of personnel; Driven by the trial of iso9000 certification, the output and quality have been significantly improved, and the company is becoming bigger and stronger. Specific performance in the following eight aspects:

First, output.

The output increased from 680603 in August to 1503353 in dem and oem335353pcs in oem in February. In just three or four months, the output has more than doubled. This set of data just shows that under the correct leadership of General Manager Zhang and General Manager Chen Gong, with the joint efforts of all employees in the Crystal Manufacturing Department, the output of the manufacturing department of a company will definitely be created.

Second, the quality.

1. The qualified rate of each working procedure has been obviously improved on the previous basis. The first-pass yield increased from 83. xxxx+0. xxxx in 1 October of 65438 to 84.xxxx in February of 65438, up by1. xxxx。 In the first pass rate, the output of a company's manufacturing department has reached an unprecedented level.

2. The complaints of customers are obviously less than before, and the quality of finished products is also under control from the technical and management aspects.

3.65438+February 9-June, two major quality accidents occurred in Tailai: 14.7456mhz/s and12 MHz/s.

Third, personnel management.

10 in September and June, due to management and other reasons, new employees were constantly added, but the mobility of personnel was relatively large. 1 1 month and 65438+February, the stability of old employees has been improved by strengthening management and raising wages. However, due to the lack of management, the thoughts of individual employees fluctuate greatly. On the other hand, because we are a production enterprise, the quality of employees is uneven, and there is a lack of training for employees at different levels.

Fourth, material consumption.

1. The main raw material workshops recycle the returned and repaired wafers in time every month. However, due to the unstable skills and mechanical equipment of a few employees, the pass rate is low, which increases the input of raw materials and affects the one-time pass rate.

2. The control of main and auxiliary materials such as silver thread and finger sleeve is not very good, and it needs to be strengthened in XX.

Verb (abbreviation for verb) data report

Daily report, weekly report, monthly report and personal output can be accurately and timely counted. With the popularization of iso9000 quality system, data reports such as product batch cards can also be accurately counted, which is convenient for the workshop to find, track and summarize the reasons that affect the output and quality.

Sixth, the process

1. In order to ensure the stability of product quality, at the end of 10, the manual shelf operation process was modified, from the original two-point glue to three-point glue. Under the guidance of General Manager Zhang and the supervision of the team, the employees who manually put on shelves are now able to operate skillfully according to the changed process.

2. In the increasingly competitive market, if you want to win the favor of customers, you must have solid quality assurance, and the company will increase or transform equipment in many ways. For example, some samples are added with techniques such as winter.

Seven. 5s management

In the trial of iso9000 quality system, although compared with the previous situation of the company, it has made great progress. However, there are many shortcomings in 5s management, the most important of which is the lack of continuous management policy, and sometimes the continuous management of 5s is ignored in order to deliver the output on time.

Eight, security aspects

Without any safety facilities, I feel very lucky that there has not been a safety accident in these four months. If 20xx is the time when a company's manufacturing department leaps and bounds, I hope we can fly farther and wider and have a broader world in xx.