Emergency plan of crane
Emergency Plan for Cranes 1 In order to strengthen the prevention of crane safety accidents, do a good job in rescue and disposal after safety accidents in time, minimize the losses caused by accidents, and maintain normal social order and work order, this emergency rescue plan for crane safety accidents is formulated according to the requirements of "People's Republic of China (PRC) Law on Safety in Production" and "Regulations on Safety Supervision of Special Equipment" and combined with the actual situation of the unit.

First, the scope of application of this plan

At present, the unit has a crane in use, which is the key equipment of our unit. The safety accident mentioned in this plan refers to the sudden accident of the hoisting machinery used by our company, which causes or may cause personal safety and property losses. The accident categories include: the specific standards for overturning, fire and falling accidents of hoisting machinery, which shall be implemented in accordance with the relevant regulations of the state, industry and local authorities.

Second, the emergency rescue organization

1, set up emergency rescue headquarters for hoisting machinery safety accidents (hereinafter referred to as rescue headquarters). The commander is the general manager; The deputy commander is the deputy general manager in charge of the project; The heads of relevant departments are members of the headquarters and participate in on-site rescue work.

2. Set up an on-site rescue team, which is composed of part-time workers from various construction teams. The team leader is the deputy general manager in charge of the project, who is responsible for organizing the specific rescue work on site; Before the commander arrives at the scene, he is responsible for directing the on-site rescue work.

Three. Responsibilities of emergency rescue organizations

(1) Responsibilities of the Headquarters

1, organize relevant departments to quickly carry out rescue work according to the emergency rescue plan, prevent the accident from further expanding, and strive to minimize the accident losses;

2, according to the state of the accident, unified arrangements for the implementation of emergency rescue plan, and take emergency measures to deal with disputes arising from emergency handling;

3, according to the changes and problems in the implementation of the plan, timely modify and improve the plan;

4, emergency call all kinds of materials, personnel and equipment;

5, when the accident is in danger of endangering the surrounding units and personnel, organize the evacuation of personnel and materials;

6. Cooperate with superior departments to investigate and handle accidents;

7. Do a good job in stabilizing order and dealing with the aftermath of casualties.

(2) The main responsibilities of the on-site commander:

1, responsible for convening the on-site leaders of all departments involved in emergency rescue to study the on-site rescue plan, formulate specific rescue measures, and clarify the division of responsibilities of all departments;

2, responsible for directing the scene emergency rescue work.

(3) The duties of the deputy commander:

Responsible for organizing the implementation of specific rescue measures.

Responsibilities of the on-site rescue team:

Rescue the wounded at the scene; Rescue on-site materials; Ensure that the on-site rescue channel is unblocked.

Fourth, the emergency contact agency

XX county bureau of quality and technical supervision. Tel: Address:

XX county safety production supervision and management bureau. Tel: Address:

XX county fire brigade. Tel: Address:

XX county public security bureau. Tel: Address:

XX county people's hospital. Tel: Address:

Maintenance unit: Tel:

Five, emergency rescue training and drills

(1) training

Organize safety management personnel, operators, engineering and technical personnel and other relevant personnel to carry out effective training as planned, so that they have the knowledge and skills needed to complete their emergency tasks.

(1) Conduct training once a year in 1;

(2) Training new employees in time;

The main training contents include: rescue of trapped people, operation in hoistway, car roof operation, pit operation, hall floor operation, machine room operation, replacement and cutting of short wire rope, escalator truss operation, common sense of construction electricity, anti-falling, safe use of power tools, identification of prominent characteristics of hazard sources, accident alarm, safe evacuation of personnel in emergency and basic knowledge of on-site rescue.

(2) Exercise

After the emergency plan and emergency plan are established, relevant personnel such as safety managers, operators, engineers and technicians will be organized for effective training as planned. According to the requirements of this plan, the company will organize an accident emergency drill from June 5 to 10 every year. At the end of each drill, make a summary in time to improve the gap in future work.

Accident report and on-site protection of intransitive verbs

1. The safety supervision department of the company is the designated institution for accident reporting. The contact person is: and the telephone number is:. After receiving the report, the engineering department shall report to the commander in time, and the commander shall report to 1 10, county safety production supervision and management bureau, county quality and technical supervision bureau or other relevant departments in a timely and truthful manner according to relevant laws and regulations.

2. Strictly protect the scene of the accident.

Seven, emergency treatment

(a) the following work must be completed within 5 minutes after receiving the accident:

1, immediately report to the company's main leaders, immediately start this emergency rescue plan with the approval of the general manager, and implement this plan according to their respective responsibilities and working procedures. In the absence of the commander-in-chief, the deputy commander-in-chief is responsible for organizing and directing the emergency rescue work.

2, the headquarters according to the accident or dangerous situation, immediately organize or command the accident organization to assemble rescue personnel, vehicles and equipment. Organize rescue forces and rush to the scene quickly.

3, notify the maintenance unit, immediately send professional and technical personnel to the scene.

4, immediately organize or notify the nearest outlets, organize and mobilize rescue personnel, vehicles and equipment. Organize rescue forces and prepare for reinforcements.

(2) Emergency measures.

1, rescue plan According to the actual accident situation at the scene, make a rescue plan and put it into rescue operation quickly.

2, the wounded rescue immediately contact the emergency center and the hospital, request emergency vehicles and prepare for first aid, to ensure that the wounded get timely treatment.

3, the scene of the accident forensics rescue operation, at the same time arrange personnel to do a good job of accident investigation and evidence collection, to facilitate the accident treatment, to prevent the loss of evidence.

4. During the rescue operation, rescuers should strictly implement the safety operation rules, complete safety facilities and protective tools, strengthen self-protection and ensure personal safety and property safety during the rescue operation.

5. After the accident of hoisting machinery, take the general rescue measures of professional maintenance personnel of hoisting machinery and complete the rescue activities through the manual operation of professional maintenance personnel of hoisting machinery.

Eight, emergency equipment, materials, communication support

Safeguards should be improved. Emergency rescue equipment should be equipped in place, and the equipment should be regularly checked in good condition, and special personnel should be arranged to keep it. It is clear that it can only be used for rescue and exercise and cannot be used for other purposes. Emergency rescue personnel are on duty to keep 24-hour communication open. The unit shall urge the maintenance unit to reserve a sufficient number of wearing parts and electronic components of hoisting machinery at the maintenance site, so that the hoisting machinery parts can be replaced in time when they fail, and the faults can be eliminated.

Nine, emergency rescue plan start, termination and recovery after termination.

1. When the accident evaluation and prediction meet the conditions for starting the emergency rescue plan, the emergency commander should start the emergency plan command.

2. After the emergency rescue plan was implemented at the scene of the accident, the hazards caused by the accident were effectively controlled and eliminated; All on-site personnel are counted; There are no other factors that affect the termination of the emergency rescue plan; Emergency rescue operation has been completely transformed into social public rescue; The emergency commander thinks that the accident development state must be terminated; The emergency commander issued an emergency termination order.

3. After the implementation of the emergency rescue plan is terminated, effective measures shall be taken to prevent the accident from expanding, protect the scene of the accident and physical evidence, and resume construction production after approval by the relevant departments.

Ten, emergency summary and rewards and punishments

After the emergency rescue work, the headquarters shall organize relevant departments to seriously summarize and analyze, draw lessons from the accident, make timely rectification, and reward and punish relevant units and personnel according to the following provisions.

1. Individuals who have made outstanding contributions in emergency rescue, command and information submission shall be commended and rewarded according to the relevant regulations of the company.

2. Those who conceal major accidents and sudden accidents, delay reporting, omit reporting, make false reports, neglect their duties, disobey orders, are not serious and responsible, chicken out or leave their posts without permission shall be investigated for responsibility or punished according to the relevant regulations of the company. Those who disturb or obstruct emergency rescue shall be dealt with by the relevant administrative departments according to law, and those who constitute a crime shall be investigated for criminal responsibility according to law.

XI。 any other business

1. This rescue plan is a guiding document for organizing the implementation of emergency rescue work and assisting the higher authorities in accident investigation and handling, and can be handled randomly according to different situations in the implementation process.

2. This plan shall take effect as of the date of issuance.

Crane emergency plan 2 1, purpose

In the construction site of Fushun Ixos New Materials Co., Ltd., this emergency plan is formulated in order to carry out emergency treatment quickly and orderly, to ensure the life safety of the wounded to the greatest extent, to minimize the loss of state property and to minimize the harm of accidents.

2. Scope of application

This plan specifies the procedures and requirements of emergency plan for lifting machinery and rigging injury accidents.

This plan is applicable to the emergency management of hoisting machinery and rigging accidents on the construction site.

3, lifting machinery, rigging accident emergency implementation procedures

(1) When the injuries caused by hoisting machinery and rigging are found, the first person to find them should shout for help, and at the same time send out an emergency signal to inform the on-site emergency rescue team.

(2) The on-site emergency team immediately rushed to the scene of the accident and organized surrounding employees to protect the scene.

(3) The on-site emergency rescue team takes necessary rescue according to the injury situation and decides what emergency measures to take at the same time.

(4) The on-site emergency rescue team immediately contacted the nearest hospital to inform the injured person and the occurrence time, and the hospital prepared for first aid and dispatched an ambulance.

(5) The on-site emergency rescue team shall report the situation to the emergency leading group of the project department and request assistance when necessary.

(6) Doctors and members of the on-site emergency rescue team should send the injured to the hospital for emergency treatment with the vehicle, and they should not give up treatment on the way. The emergency leading group of the project department keeps in touch with the on-site rescue team at any time, and at the same time, the emergency leading group of the project also needs to contact the superior hospital so as to transfer the treatment in time when the local hospital can't handle it.

Emergency plan for cranes 3. Accident report:

1, after the accident, the accident unit must report the brief situation of the accident to the superior in the fastest way. And report in writing within 24 hours.

2. Do not conceal, lie or interfere with the normal investigation after the accident.

3 migrant workers, temporary workers, contract workers death accidents, according to the formal staff reporting.

Second, the emergency rescue measures:

Emergency rescue shall be implemented in a territorial responsibility system and implemented as soon as possible.

1. In case of sudden major safety accidents, it shall be reported to this project immediately and rescue shall be organized with all efforts. The legal representative and technical director of the company must arrive at the scene to organize rescue work with personnel, materials and funds at the first time.

2. After receiving the report of the construction safety accident, the project office should immediately start the emergency rescue designated by the head office, and rush to the scene at the first time to organize rescue, and quickly report the safety to the local government and the superior construction administrative department.

3. After receiving the report of major production safety accidents and unexpected time on the construction site, the head office shall immediately report to the leading group, and immediately notify the comprehensive coordination group to start the emergency rescue system, quickly implement emergency rescue mobilization, organize relevant personnel to rush to the site, and organize rescue together with the local government and competent departments. And promptly report to the district government and the municipal and district construction bureaus.

Three, the scene rescue specific matters needing attention:

1. Please ask medical rescue personnel to bring relevant instruments and medicines to the scene, and prepare for rescue according to relevant hospitals.

2. Please ask the public security personnel and urban management personnel to maintain the public order at the scene, evacuate the onlookers, set up a warning line and determine the warning range.

3. Count the number of people

4. Determine the rescue plan, implement the safety measures and signs of rescuers, eliminate major dangers, organize rescue in an orderly manner, and supervise the relevant units to implement the rescue materials and funds for treating the wounded.

5. Clean up the site, count the site personnel and evacuate the site.

6. Summary and analysis. Relevant information is released to the public media by specialized personnel.

Fourth, the significance of emergency rescue:

The emergency rescue of major production safety accidents must adhere to the people-oriented principle, and always put the rescue and evacuation of personnel first. Rescue work should adopt a scientific attitude and be carried out under the condition of ensuring the safety of rescuers, and should not be reckless. Avoid causing new casualties.