1.2 accidents (including personal casualty accidents), obstacles and abnormal skills accumulated by our company over the years.
Technical data, as well as accident notification, accident data compilation and anti-accident technical measures and instructions issued by superiors.
1.3 weaknesses exposed in anti-accident drills.
1.4 Structure principle, parameters, performance and operation method of existing equipment and new equipment. 1.5 Safe and economical operation mode and advanced working methods. 1.6 new technology and advanced operation method.
1.7 the influence of seasonal changes on the operation mode, the easy-to-happen accidents and their preventive measures. 1.8 Influence of power load change on voltage. 1.9 relay protection principle and setting calculation principle.
1. 10 Jin Meng 1 10 kV power grid network topology features and operation precautions. 1.11110kv training plan.