In a rapidly developing society, we always use speeches, which can help speakers express themselves better. Do you know how to write a speech correctly? The following is a sample essay (5 selected essays) on the project completion acceptance speech I collected, which is for reference only and I hope it will help you.
Speech on project completion acceptance 1 Dear leaders, experts, distinguished guests,
(used when meeting in the afternoon) Good afternoon.
As a representative of the construction, let me briefly introduce the general situation and characteristics of this project:
I. Overview of the Project
The sewage pipeline wx 1-wx53 of this project is designed to adopt hxpe steel belt to reinforce the medium-coarse sand foundations of wound corrugated pipes (mrp)xn600 to 1200 and 180, and connect them by hot melting; The total length of 4000m m, 15# to 2 1# was originally designed as a pipe jacking project. After field investigation and expert consultation, it was changed to open trench excavation, which saved the cost and accelerated the progress.
Second, the engineering characteristics
1. The construction area of this project is located in the urban area. The construction site is crowded with people and traffic, and it is close to schools, markets, communities and shops. In the process of project construction, a lot of construction work is needed. The noise of mechanical operation has a certain impact on the life of roadside residents.
2. The intersection of Xianbao Road and Juning Avenue is the main access to Xianning South. Ensuring the smooth flow of existing traffic is the most important thing in the implementation of this project.
3. The deepest trench is about 5m, and the trench closest to the building is only about 3m, which is rich in groundwater. How to ensure safe construction is also the top priority of this project.
Three, according to the characteristics of the above projects, the following measures and methods have been taken:
1, in strict accordance with the requirements of construction specifications, construction management and quality control. Establish and improve the quality assurance system and strengthen safety measures, so as to implement all the work and create favorable conditions for the smooth and efficient construction of this bid section.
2. On the basis of establishing the specialization of construction organization, select experienced managers and people with technical expertise to form a strong construction organization, form the core layer of construction organization management, and be fully responsible for the distribution of construction materials, engineering quality, manpower, material resources and financial resources, construction progress and safety guarantee. Directly responsible to the owner and supervision engineer.
3. In the configuration of machinery and testing instruments, based on efficient mechanized operation and modern testing means, it provides strong material guarantee for quality and engineering.
4. In terms of construction period, fully consider the construction period of each project, based on rationalization, carefully analyze and carefully arrange the construction sequence of each project according to the drawings and bill of quantities, and absolutely avoid the construction interference and slowdown caused by unreasonable arrangement.
5. On the basis of standardization and standardization in formulating construction scheme, selecting construction technology and construction technology, scientific and advanced construction methods are given priority to ensure project quality and construction period.
6, in terms of safety assurance measures based on comprehensiveness, reliability and operability, to ensure the smooth completion of the project.
In a word, with the strong support of the owner, the strict supervision of the supervisor, the efficient guidance of the design, and the close cooperation of all relevant departments, as the goal of quality first, safety first and one-time customs clearance for each division, the construction task was completed on time with good quality and quantity through careful organization of construction.
Here, I would like to express my deep gratitude to all of you here and wish the acceptance of the project organized by the project owner a complete success.
Speech on project completion acceptance. Leaders, experts and friends of the same trade:
Hello!
With the joint efforts of all contractors, the xx project has completed all construction tasks and will be completed and accepted today. In the construction of 10, we received strong support and help from experts from the county quality supervision station, design institute, supervision and construction. Here, on behalf of all the employees of the company, I would like to thank all the experts!
Now I will make a brief report on the basic situation of this project. This project has two sub-items: xxx and xx, each with one floor, building height 10.33m, and indoor and outdoor height difference of 0.3m: among them, the building area (building area) is about1kloc-0/5.59 m2, and the floor area (building area) of xx is 764.5438+0 m2; The positive and negative zero elevation of the building is 5.500m relative to the absolute elevation, the main structure type is bent structure, the roof is reinforced concrete broken-line roof truss, the prestressed concrete roof panel is finished, the fire resistance rating is Grade II, the roof waterproof rating is Grade I, the seismic fortification intensity is less than 6 degrees, the storage items are classified as Class C, and the design service life is 50 years.
The main function of this project is to store rice and wheat in bulk. Grain storage is completed by mobile belt conveyor, mobile grain stacker and other equipment, and grain varieties are stacked in bulk in a 6-meter-high warehouse; The maximum grain stacking height in the granary is marked with a grain stacking red line with a width of 0.05 m, and the forbidden grain stacking height is about1.8 m. A grain outlet is set at the grain baffle, and a manual gate is provided to facilitate the grain to be discharged from the warehouse door. Grain delivery is realized through the coordination of grain scraper, mobile belt conveyor and other equipment. During the whole construction process, we appointed several management personnel to participate in the project quality and progress management on site, and solved the existing problems and difficulties in time through regular supervision meetings. Thanks to proper measures, we are glad that there have been no quality and safety accidents. Today, we specially invite all of you here to complete the project acceptance and put forward your valuable opinions. We will quickly complete the remaining filing matters in the later period and strive to put them into use as soon as possible.
Thank you!
Speech on project completion acceptance Dear three leaders:
Hello everyone!
First of all, I am very grateful to the leaders and experts of all units for coming to attend the preparatory meeting for project completion acceptance undertaken by our company. On behalf of the construction unit, I will briefly introduce the construction of this project:
1. The project started on March 20XX 10, and all the contents agreed in the design drawings and construction contract have been completed. All construction contents are carried out in strict accordance with the construction drawings, design changes, design disclosure and the blue prints.the design signed by the design unit.
Second, the detection of raw materials and entities:
Various raw materials and components used in the project, such as cement, sand and gravel, steel bars, commercial concrete, bricks, thermal insulation mortar, etc. , has been submitted for inspection and sampling inspection has been carried out in strict accordance with the principle of inspection before use. The factory warranty of raw materials is complete, and the results of witness sampling inspection report meet the design requirements.
The foundation of this project is manual digging pile foundation, and the detection of pile body meets the design requirements. The measured concrete strength and reinforcement spacing meet the design requirements.
The main body is frame-shear structure. Welded lap joint is used for steel bar connection, and the test of joint specimen meets the design and specification requirements; The concrete strength report of the sampled specimens is rated as qualified, and the results of main entity detection and rebar planting detection meet the design requirements. The pull-out test of exterior wall decorative joints meets the design requirements. All tests and evaluations are qualified.
Exterior wall energy-saving sub-items, roof energy-saving sub-items, doors and windows energy-saving sub-items and other energy-saving sub-items all meet the design requirements, and the test results all meet the energy-saving design requirements. Decoration, roof, water supply and drainage, electrical and other branch pipes are constructed according to the design and specification requirements, and there is no leakage or water accumulation in the roof water storage test.
Three. Construction technical data: all sampling items of each division and sub-item are qualified, and the sampling inspection lot has complete data and signature, which is qualified. Engineering and technical data are complete, detailed and accurate. The quality of the project meets the requirements of national specifications and relevant technical standards, and it has the conditions for completion acceptance.
Four. Quality and safety acceptance at each stage:
1, mass:
This project has passed the acceptance of each division and sub-project, and all the acceptance opinions are qualified.
2. Security:
This project has completed the safety verification at all stages, and the conclusion is qualified. From the start of the project to its completion, no safety accidents occurred.
Verb (abbreviation of verb) self-evaluation opinion:
Based on the above situation, my project passed the self-evaluation of Zhongxiang Community Service Center residential building project. Please give your valuable advice.
Intransitive verb project warranty: The project completion date is also the beginning of the project quality warranty. In order to safeguard the legitimate rights and interests of the owner, our company will ensure the quality and level of warranty service of this project based on the principle of being responsible to users, and do our best to do a good job in project quality warranty.
Here, on behalf of the company, I would like to express my heartfelt thanks to all departments and contractors who have given us great support and help in the construction process.
Speech on project completion acceptance Dear leaders,
Thank you for coming to participate in the energy-saving pre-acceptance of the self-use office building project of Shangye Machinery Factory in Beibei District of Chongqing.
The project completed all the construction procedures and started construction in xx month of 20xx, and all the construction parties fulfilled the contract well.
Organize the blue prints.the design when the project starts, approve and issue the engineering changes and negotiations proposed by the construction unit during the construction period; Quality management: Quality management is based on the principle of "quality first". In terms of safety work, we should conscientiously study the laws, regulations and rules on safety production issued by government departments at all levels, and implement the responsibility system for safety production and safety supervision and management. In terms of construction funds, our unit raises funds through various channels to ensure that the project funds are in place.
We insist on strengthening the comprehensive supervision and management of construction units. Friendly neighborhood, harmonious public security. Here, on behalf of the construction unit, I would like to congratulate the construction unit on its safety and smoothness in the whole project construction, meeting the design requirements and completion acceptance specifications.
We would like to express our heartfelt thanks to the quality supervision, design, geological exploration, supervision, construction and other units that have given us great support during the construction process! Everyone has worked hard!
Thank you!
Speech on project completion acceptance Dear leaders and experts,
Hello everyone! Warmly welcome leaders and experts to visit our mine to record and check the quality of individual projects in our mine resource integration construction project, and also take this opportunity to express heartfelt thanks to the design units, survey units, supervision units, construction units and engineering quality supervision units involved in mine project construction! Below I will report on the construction of Egret Coal Mine resource integration project as follows:
A, mine profile
Egret Coal Mine in Yuyang District is located in the northeast of Yulin City, 17km, and is under the jurisdiction of Niujialiang Town in Yuyang District. After the integration of mine resources, the designed production capacity of the mine is 600,000 tons/year, the service life is 23.55 years, the mine field area is 5.3887km2, the mine field reserves are 50.835 million tons, and the recoverable reserves are 654.38+08.374 million tons. Approved the mining of No.3 and 3- 1 coal seams, mainly No.3 coal, with an average thickness of 6.99m m.
The second is the approval of resource integration projects.
Our mine is a coal resource integration mine approved by the document XX 167 of Shaanxi Province in 20XX, the integrated mining design of our mine resources was approved by the Provincial Coal Bureau in 20XX, and the design of safety facilities was approved by the Provincial Coal Supervision Bureau in 20XX.
20XX On April 30th, Yuyang District Coal Bureau approved the construction of Bailu Coal Mine resource integration project. In the same year, Yulin Environmental Protection Bureau and Soil and Water Conservation Station approved the environmental impact report and soil and water conservation plan respectively.
On April 20XX 1 day, Shaanxi Coal Production Safety Supervision Administration approved our mine to carry out joint trial operation, with the period from April 20XX 1 day to September 30, 20XX.
In May of 20XX, our mine has passed the acceptance of fire fighting and water and soil conservation facilities.
Third, integrate the construction of mine resources
Our mine started on July 20XX 1 and was basically completed on September 30th, 20XX. Mine quality standardization was carried out from XX to XX in 20XX, and passed the acceptance of Yulin Energy Bureau on October 4th, 20XX 65438/kloc-0, and the mine quality standardization reached the secondary standard.
"Safety first, quality first", insist on paying close attention to project quality management, clarify the quality responsibilities of the constructor, supervisor and constructor, and adhere to the principle that whoever manages is responsible. The construction unit must establish a quality management guarantee system, implement quality responsibility, determine the project manager, technical director and construction management director of the project, and be responsible for the contracted project quality. From the disclosure of construction design drawings, the preparation of construction organization design, and the procurement and acceptance of building materials, we must strictly examine and approve. In the construction management, each construction team is required to strictly follow the construction drawing, strictly control the project quality from each working procedure and each type of work, and make a construction log and a small class quality acceptance form. The construction unit is required to conduct quality self-inspection every ten days, and the construction unit and supervision unit conduct quality acceptance once a month. Deal with the problems found in time to ensure that all projects are strictly designed and constructed to meet the design quality standards.
Entrusted by the owner, the supervision unit shall supervise and control the quality of the project, timely notify the relevant departments of major issues and issue supervision notices, put forward rectification requirements, and track and supervise the rectification situation. In engineering construction, from the procurement of building materials, the construction quality of each process of team construction, to the inspection and acceptance of construction quality and the recording and arrangement of unit engineering data, the benign development of various projects has been effectively promoted, and the engineering quality has been ensured to be qualified and up to standard.
Through the joint efforts of all the participating units in the construction, survey, design, supervision and construction projects, after more than one year of construction, all the contents of the mining design of the Implementation Plan for Mine Resources Integration have been completed, and six complete systems of mine ventilation, transportation, lifting, water supply and drainage, power supply, safety rescue and ground production and life have been formed, and the whole production system has entered the stage of joint trial operation.
Four, the completion of mine resources integration project investment
By the end of 20XX, the resource integration project of our mine has been completed according to the design requirements, and the actual total investment of the project is 239,573,600 yuan, including 36/kloc-0,443,000 yuan for roadway engineering, 38,239,000 yuan for civil engineering, 482,654,380 yuan for equipment and tools, 34,775,700 yuan for installation engineering and 894,330 yuan for civil engineering.
Five, mine resources integration construction project unit project completion
Implementation scheme of coal resources integration project in Bailu Coal Mine, Yuyang District, Yulin City The mining design was designed by Shen Yu Coal Architecture Design Co., Ltd., Yulin City, Shaanxi Province, and the construction drawing design was designed by Hancheng Mining Bureau Design Institute. Liaoning Chengxin Construction Supervision Co., Ltd. is responsible for the supervision of construction, safety and engineering quality; Mine construction, civil engineering and electromechanical installation are undertaken by Shaanxi Ji Tai Group Road and Bridge Co., Ltd., Yulin Longmeng Water Conservancy and Hydropower Engineering Co., Ltd. and Yulin Huajian Steel Structure Engineering Co., Ltd. respectively. The supervision station directly under the Shaanxi Construction Engineering Quality Supervision Station of the coal industry supervises the engineering quality. Since the start of construction, with the strong support of government leaders at all levels and industry authorities, and with the joint efforts of contractors such as construction, design, survey, supervision and construction, after more than one year of construction, all the engineering contents required by mine mining design have been completed, and the whole system has entered the stage of joint trial operation.
According to the related contents of mining design in the implementation plan of integration project and the unified name of unit project of coal construction project, Bailu coal mine resource integration project is divided into 67 unit projects, including mine construction 17, civil engineering 36 (including original XX) and electromechanical installation14; 57 new unit projects should be completed, and 57 projects were actually completed. I mine design, survey, supervision and other units have been accepted, and the engineering quality of 57 units is all qualified.
Six, mine joint trial operation
Since the coal mine entered the joint trial operation on April 1 day of 20XX, it has organized production in strict accordance with the "joint trial operation plan", established and improved various safety management rules and regulations of "safety first, quality first", equipped corresponding safety management personnel for managers at all levels and various types of work, paid close attention to basic safety management, strengthened on-site safety management, and strictly implemented the system of investigation and management of potential safety hazards. If it is not safe, it will not be produced, and it will not rule out potential safety hazards. At the same time, the safety training for employees has been strengthened, and the operation qualification certificate for special types of work has been obtained, and the safety qualification certificate for entering the well has been obtained. With the concern of leaders at all levels and the close cooperation of manufacturers, construction units, design and supervision units, all production systems in the mine are running normally at present, which has reached the design production capacity of the mine and has the conditions for completion acceptance.
In order to realize the formal production of the mine as soon as possible, it is specially applied for the Shaanxi Provincial Construction Engineering Quality Supervision Center Station of the coal industry to record and accept the single project quality of our mine resource integration project. For the deficiencies in site and engineering data, please put forward valuable opinions and suggestions from leaders and experts, and we will actively cooperate to complete the rectification in the shortest time.
thank you
;