1. Before applying for the qualification of an education and training institution, determine the nature of the training school: for-profit or non-profit.
2. Report to the street office and the Education Bureau to confirm whether there are any indicators. If there are indicators that can be handled, first change the nature of housing use (change to education and training), and then go to the street office to stamp.
3. The site selection shall comply with laws and regulations on planning, fire protection, sanitation and housing safety. Area: 500 square meters in Beijing, 200 square meters in Shanghai and 400 square meters in Shenzhen. The lease term is more than 3 years, and the floor height is 3 floors or less, which is used for preschool education and preschool education. For other projects, please consult the local government.
4. After the site is determined, apply for name pre-approval. Submit relevant documents, and the Education Bureau will formally prepare for filing, and obtain the "Preparation for Application Consent".
5. Generally, the business license has been obtained. If not, you can find an agent.
6. The school fire permit is not equal to the original fire permit of the place, but a special school fire permit. After the preliminary examination of the site, the application for preparation is approved, and matters related to the fire permit for running a school are handled at the same time.
7. Need to provide a capital verification report, put the registered capital into the designated account, find an accounting firm, and issue a capital verification report.
: Processing time of education and training institutions:
The pre-approval period of 1. name is 7 working days and the validity period is 6 months.
2. The examination and approval period for fire protection filing is 30 working days.
3. The formal examination and approval period for fire protection is 20 working days.
4. The examination and approval period of the application for running a school is 30 working days, and the validity period is 3 years.
5. The time limit for formal submission and approval of running a school is 20 working days.