Current location - Training Enrollment Network - Early education courses - Wuhan-Xiaogan light rail line planning
Wuhan-Xiaogan light rail line planning
Wuhan light rail and subway planning map to Xiaogan?

Rail Transit Network in 2020?

According to the overall planning of rail transit network, by 2020, the backbone lines of the network will be basically built, forming a basic rail transit network covering three towns in Wuhan and connecting the two sides of the strait, solving the traffic in the main direction of passenger flow and giving play to the role of rail transit in the urban passenger transport system. The planning network for 2020 consists of five lines:?

▋ Line 1?

The total length from Wujiashan to Tianjiao is about 30.5 kilometers. Build a vehicle base in Gutian, and set up parking lots at the bridge mouth and embankment. ?

▋? Line 2?

The total length from Changqing Garden to Liu Fang is about 32.3 kilometers. Establish a vehicle base in Evergreen Garden and a parking lot in Liu Fang. ?

▋? Line 3?

Dunkou to Qingnian Road, the line length is 21.8km. A parking lot is set at Dunkou for the large-scale maintenance and vehicle base of Changqing Garden on Line 2. In the long term, it will extend from Qingnian Road to Sanjintan and set up Sanjintan parking lot. ?

▋? Line 4?

Yong' antang to Qingshan, with a total length of about 29.3 kilometers. Set up a vehicle base in Yuejiazui and a parking lot in Yong 'antang. ?

▋? Line 5?

Qingshan to Nanhu Garden, with a total length of about 24.5 kilometers. Set up a parking lot in Qingshan for the large-scale maintenance of Line 4 and Yuejiazui vehicle base.