How long is the construction period of steel structure swimming pool?
How long is the construction period of steel structure swimming pool?

A: Generally, it takes about 45 days from signing a contract to construction acceptance. It takes more than 20 days to process and transport the steel structure. At this time, you should make sure that the ground of the construction site is flat and solid. The water and electricity are connected.

After the steel structure is transported to the site, it needs to be constructed and installed, as well as the installation and debugging of water circulation filtration equipment. It will take about 25 days to complete, and the detachable swimming pool can basically operate.

Compared with the traditional concrete swimming pool, the construction period of steel structure detachable swimming pool can save about half the time. And the service life is long. Equipped with automatic swimming pool integrated equipment, it is more reliable to treat water quality and ensure the water quality of swimming pool, which is worth a try by investors.