Current location - Training Enrollment Network - Books and materials - Template of bidding documents for decoration engineering
Template of bidding documents for decoration engineering
Generally, some large-scale projects will be tendered first. In the bidding process, the bidders will be qualified, and only after reaching the standard will they be eligible to participate in the competition. The following is the "Template of Bidding Document for Decoration Project" compiled by me for your reference only. I hope you like it! For more details, please click to view.

Decoration project bidding template 1 I. Overview

1. Project name: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

2. Name of the tenderer:

3. Address of the tenderer:

4. Postcode: Template 5 of Acceptance Sheet for Decoration Project. Location of the project subject to tender:

6, the project subject to tender implementation time:

7, planning content:

The total construction area is _ _ _ square meters, and the actual use area is _ _ _ square meters.

The building is divided into _ _ _ _ floors, with the actual usable area of _ _ _ floor being ㎡ and the actual usable area of _ _ _ floor being ㎡.

The overall layout is divided into: _ _ _ _ _ _ _

8. Overall design principles

9. Design theme

10, function division

1 1, other design requirements.

Second, the registration conditions

1. enterprise registration conditions: the enterprise participating in the bidding of this project has independent legal person qualification and has more than three years of mature engineering construction or decoration experience.

2. Registration materials: a copy of the business license of the enterprise, a copy of the ID card of the legal representative of the enterprise, a professional qualification certificate, the construction performance of similar projects, a letter of introduction from the unit (the entrusted agent shall carry his identity certificate and power of attorney), and a certificate of the project manager.

3. The bidder only needs to pay a bid bond of RMB 5,000 when participating in the bidding and receiving relevant information. If the bidder fails to win the bid, the construction unit shall return the bid bond to the bidder without interest within 7 working days from the date of winning the bid.

4. The construction unit shall sign a construction contract with the winning bidder after checking all valid certificates (originals) provided by the winning bidder and confirming that they are correct. After entering the site for construction, the bid bond will be returned to the winning bidder without interest. If it is found that the documents (originals) provided by the winning bidder are forged, and the winning bidder violates the requirements of the bidding documents, the qualification of winning the bid will be cancelled and the bid bond will not be returned.

5. All expenses incurred by the bidder during the bidding period shall be borne by itself, and the relevant information submitted by the tenderer will not be returned.

Third, the construction requirements

In order to ensure the engineering quality and meet the requirements of engineering construction, the relevant materials should specify the brand and specifications.

1, provide brands and specifications of building materials within the bidding scope in strict accordance with the requirements of the project list; The construction scope is the engineering list in the drawing;

2. The bidder shall quote according to the brand and specifications specified by the tenderer when quoting;

3. Other undecided brands and specifications shall be quoted according to the requirements of construction drawings;

4. The materials not recommended in the construction drawings or bidding documents shall be quoted by the bidder (the brand and specifications shall be indicated), but their quality and technical performance shall meet the requirements of the construction drawings and relevant national or industrial standards. If the brand and specification are not indicated in the tender offer, the bidder will have the right to change its brand and specification without increasing the price.

5. When the contract is implemented, if the tenderer thinks it is really necessary to change it, the tenderer has the right to change the brand and specification of the product and adjust the price according to the price adjustment principle agreed in the contract.

6. If mistakes are found in the design drawings or some modifications need to be made to the original design drawings according to the construction site conditions, it must be confirmed by the tenderee, and the design unit will issue a notice of modification, and then adjust the engineering quantity. Bidders are not allowed to make any changes without authorization.

Fourth, the way of contracting.

1, this project adopts fixed lump sum contract. That is, the price is calculated on the basis of clear design and construction drawings. Except for design changes or additions or deletions during construction, the price adjustment will not be carried out after bidding.

2. If the engineering quantity is increased or decreased due to design changes during the construction period, the amount of the increased or decreased engineering quantity shall be calculated according to the quotation of the contractor when bidding.

3. In the process of construction, if the construction project is increased due to the change of the construction unit or design, it shall be adjusted according to the budget quota of Beijing construction project in the current year or the latest time, the market information price in Beijing and the market situation in Beijing.

4. The bidder shall prepare the bidding documents and quotation according to the bidding documents, construction drawings, bill of quantities and supplementary notice provided by the tenderer.

5. If there is any objection to the engineering quantity, it should be made clear before bidding. If there is any error in the engineering quantity, it must be adjusted correctly before bidding. The winning bidder shall perform the contract and shall not subcontract or subcontract.

Verb (abbreviation of verb) construction period

The construction period is _ _ _ days, from _ _ _ days after the signing of the contract to the completion of the project. 0.5% of the total project price will be deducted for each day of delay.

Explanation of intransitive verb quotation

1. The bidder shall make a reconnaissance of the project site and its surrounding environment, so as to obtain all the information needed for preparing the bidding documents and signing the contract for implementing the project. The bidder shall bear the responsibility and risk of site reconnaissance, and the expenses of site reconnaissance shall be borne by the bidder.

2, the bidder shall truthfully fill in the price according to the drawings provided by the construction unit, the bill of quantities and the materials brand, specifications and other technical and quality parameters required in the information provided by the tenderer, and shall not change it at will, otherwise it will be treated as a waste standard.

3. When bidding, the content and quantity of items (quota Buddhism) in the bill of quantities shall not be changed, and the comprehensive unit price must be filled in according to each item (quota Buddhism), and the total price shall not be quoted, otherwise the bidding documents will be invalid.

4. The bidder shall fill in all unit prices and total prices in RMB (yuan), and pay in RMB when the contract is implemented.

5, the bidder must be in strict accordance with the project quotation provided by the tenderer carefully fill in, the format can be customized according to the application software used.

6, quotation documents must include decoration construction instructions.

Seven, shortlist and bid evaluation method

1. The bidding team of People's Daily Digital Communication Co., Ltd. is responsible for the bidding, bid evaluation and tender interpretation of this project.

2. The bid evaluation time shall be notified separately by People's Daily Digital Communication Co., Ltd. ..

3. Bidding adopts the method of prequalification to determine qualified bidders. From the applicants, after comparing the renderings of prequalification units, 3-5 project bidders are determined.

4. Bid evaluation method: The principle of bid evaluation is openness, fairness, reasonableness and standardization. There are two conditions for winning the bid (the actual conditions for winning the bid are determined by the on-site evaluation of the bid evaluation meeting):

(1), the bid price is the lowest among the finalists;

(2) The bid price is lower than the short-listed average price, and the bid winner is closest to the short-listed average price.

Among them, (1), if the ranking is tied, the bidding working group will collectively determine the ranking order and determine the first successful candidate according to the comprehensive comparison of the production performance, technical strength and reputation of the enterprise;

(2) The tenderer determines that the candidate winning the bid ranked first is the winning bidder. If the candidate winning the bid ranked first gives up the bid and cannot perform the contract due to force majeure, the tenderer may determine the candidate winning the bid as the winning bidder according to the ranking order.

Eight. Signing of contract

The winning bidder shall provide the signed contract (model contract) to the tenderer within three days from the first day of receiving the bid-winning notice from the tenderer. Overdue, the tenderer has the right to cancel the qualification of the winning bidder.

Nine, engineering quality, safety and acceptance criteria

The winning bidder must carry out the construction in strict accordance with the design and construction drawings and relevant construction and acceptance specifications to ensure that the project quality meets the standard requirements through the acceptance of relevant departments.

1, should comply with the provisions of the current national product standards, and should have the factory certificate.

2, product quality acceptance should comply with the brand and specification requirements provided by the tenderer.

3. The winning bidder shall ensure the construction safety of the whole project, ensure the progress of the project and strictly control the quality of the project.

4. The project quality shall be checked and accepted in strict accordance with national industry standards and norms.

5. Products involving professional specifications such as fire protection and environmental protection must be approved by local fire protection and environmental protection departments.

6, the engineering construction quality must meet the qualified standards.

7. If it is found that the products and materials do not meet the requirements during acceptance, and there are phenomena such as adulteration with other brands and insufficient specifications, it shall be ordered to return and rework, and the losses caused thereby shall be borne by the winning bidder.

8. After the project is completed, the relevant quality acceptance department will accept the project.

X. Payment of project funds

1, 50% of the project is completed, and 40% of the progress payment will be paid after verification by the construction unit. After the project is completed and accepted by the construction unit, 80% of the final accounts will be paid after the audit, leaving 20% of the quality deposit, which will be paid in one lump sum one year later.

2. The warranty period is one year. After one year of completion, if there is no quality problem, the construction unit will refund the quality deposit. If there are quality problems, the winning bidder must rework again to make the project quality more qualified.

For details, please call:

Xx company limited

date month year

Summary of the first clause of decoration project bidding model 2

I. Overview of the Project:

1, project name: xx renovation project

2. Project address:

3. Project scale: The total area is about 260 square meters.

Second, the project construction unit:

Three, the bidder qualification requirements:

With decoration level 2 and above qualifications.

Four. Tenderee and final signer of this project:

Article 2 Bidding Principles and Content Scope

First, the bidding principle:

In this project, the units that have passed the second-level qualification pre-qualification contracted by the architectural decoration specialty will participate in the bidding.

Second, the cost basis:

1. The project and quantity shall be subject to the bidding documents provided by Party A. ..

2. This fee is subject to the budget quota of xx housing renovation project in 20xx and the corresponding charging standard.

3. This quotation does not include the cost of the project whose quantities are not provided in the bidding documents, so the corresponding cost will be increased according to the actual situation.

Three. Tender content: renovation project

Four. Decoration requirements: general decoration

5. Project quality: in line with relevant national regulations, and Party A has passed the acceptance. ..

Date of intransitive verb project: completed within 18 working days after signing the contract.

Seven, renovation project details:

1, 80m2 plastic-steel frame glass partition wall (conch profile);

2. Light steel Longshan double row (partition wall)160m2;

3. 160㎝ (thickened) gypsum board for partition wall;

4. Rock wool sound insulation160m2;

5, Nippon paint coating 350 ㎡;

6. Install 7.5m2 plastic-steel sliding door (conch profile);

7. Install plastic-steel transverse gate13m2 (conch profile);

8. Install 2m2 plastic-steel sliding window (conch profile);

9. A security door with a width of 1.2m (Rishang brand);

10, demolition of the old bathroom floor of 6.2㎡, ceiling of 6㎡, partition of 9㎡, squatting pan and washbasin of each1;

1 1, the toilet is waterproof for 8 ㎡;

12. Newly-built wall (hollow brick) in toilet and other areas is 25m2.

13, 6 ㎡ PVC ceiling in bathroom;

14, 6m2 tile bathroom floor;

15, 30 ㎡ wall tiles in toilet and other areas;

16, install 2 wash basins and 2 faucets;

17. Install 2 mop pools and 2 faucets;

18, exposed pipes are laid on the ground, and the water level (PPC profile) is 30m each.

19, newly installed 3 4KM distribution boxes, 8 high-power sockets and ordinary sockets10;

20. The indoor wiring is estimated to be 6.5438+0.5 million yuan;

2 1. Cleaning and transportation of decoration garbage.

The above installation and renovation projects are subject to the actual amount.

Article 3 Instructions for Bid Opening

A, to participate in the project bidding unit is selected through the prequalification procedure.

Two, the tenderer has the right to refuse to accept the tender documents that do not meet the requirements of the tender.

Three, only when the bidder receives the notice authorized by the tenderer, can it be considered that its bid is accepted.

Four, the composition of the tender documents:

1. Power of attorney of legal representative

2. Business license of enterprise as a legal person

3. Qualification certificate

4. Company Profile

5. Construction plan

6. The construction tender quotation budget

V. Time for accepting bids, deadline for bidding and time for opening bids:

1. Online registration time: 20x65438+February 2-20x65438+February 8.

2. Deadline for bidding: Send the bidding scheme to the office of xx Service Bureau before February 8, 20xx 12: 00.

Contact person:

Contact telephone number:

Place of issuing bid and place of opening bid for intransitive verbs:

At that time, please invite the legal representative of the bidder or its authorized representative to attend the bid opening ceremony on time.

Seven, regardless of whether the bidder wins the bid, the bid information will not be returned.

Eight, the tenderer does not explain the reasons for not winning the bid.

Nine, the winning bidder in the construction process should obey the leadership of the construction unit, if there are different opinions should be resolved through consultation.

Article 4 Bid evaluation

A, composed of xx service bureau of the bid assessment committee, in accordance with the review procedures for review.

Second, the evaluation principle:

1. Openness, fairness and justice

2. Good quality, high reputation, reasonable price and appropriate construction period.

Third, the bid evaluation procedures and methods:

1. Evaluate the qualifications of bidders.

2. Evaluate the tender offer of the tendering unit.

3. Comprehensively evaluate the management, performance and quotation of the tendering units.

4. The investigation shall be attended by all judges.

The jury will meet to decide the winning bidder. If there is a joint winning bidder, the final winning bidder shall be determined by raising hands.

6. After the bid evaluation committee determines the winning bidder, it shall call the winning bidder to sign the agreement.

Article 5 The power to interpret these Provisions belongs to xx Service Bureau.

20XX year 1 February1day

Decoration project bidding template 3 Our company plans to undertake the interior decoration project of the new * * building. In order to ensure the quality and safety of the project and improve the economic benefits, based on the principles of openness, fairness and fair competition, and according to the Construction Law of People's Republic of China (PRC), the Bidding Law of People's Republic of China (PRC), Decree No.89 of the Ministry of Construction of People's Republic of China (PRC) and the Implementation of the Construction Law of People's Republic of China (PRC) in xx Province, the bidding conditions and requirements of this project are as follows:

I. Overview of the Project:

1, project name: * * building interior decoration

2. Construction site: * * Road 1#

3. The planned investment is170,000 yuan, and the nature of the investment is self-raised. The funds in place are170,000 yuan.

4. Functional layout: See the decoration design and construction drawing provided by the owner for details.

5. Engineering category: whole building decoration engineering.

Second, the project bidding scope:

For details, please refer to the construction drawing of decoration design provided by the owner (including lighting, sanitary ware and corresponding pipelines).

Third, the way of contracting:

1. According to the Bidding Law and other relevant regulations, this project is signed by the employer and the construction unit in accordance with the bid-winning price, bidding time limit, bidding quality grade and other provisions in this bidding document, as well as the relevant provisions of the Contract Law, and adopts the contracting methods of contracting labor, materials, time limit and quality.

2. Charge standard

2- 1. civil engineering: according to the current quota and its supporting charging standards, the budget price of materials is subject to the document * Jian Jia [20xx] No.08; The charging standard is Xiangjian [[〔20xx〕] A font size]. 296th place; Manually adjust the temporary adjustment coefficient according to * J.Z. [20xx] No.09, which is included in the pre-tax quotation; The fare increase for safe and civilized construction and occupational health on the construction site shall be implemented according to the fixed 20xx No.011.

2-2. Installation works (including water and electricity installation, heating and ventilating, and pipeline laying): the expenses are calculated according to the current quota, and the budgeted price of materials is implemented according to the current market price.

2-3. Decoration and fitment works: the fees are charged according to the current quota, the budget price of materials shall be subject to document JJ [20xx] No.08, and the charging standard shall be subject to document JJ [20xx] No.296 and related supporting documents.

1. The quotation for this project as a whole does not include labor insurance fund (the labor insurance fund shall be paid in advance by the employer according to the relevant regulations before the bid opening, and shall be accounted for according to the actual scale after the bid opening, and the overpayment and underpayment shall be included in the total cost).

Four. Supply and quality requirements of main materials: The materials shall be jointly purchased by the Owner and Party B and can only be used after being approved by the Owner and the Supervisor.

Verb (abbreviation of verb) construction cycle:

According to the current national time limit quota and the owner's actual situation, the project time limit (calendar days) is determined as * * * days; Bidders can determine their own bidding period according to their own actual conditions.

Six, the project quality:

According to the current national construction acceptance specifications and quality standards, the project quality must meet the requirements of engineering design and current specifications. After completion, the quality grade must reach the excellent standard after acceptance by the local quality supervision department.

Seven, the contract signing requirements:

1, the winning bidder shall not subcontract the project; If subcontracting is found, the construction management department will investigate and deal with it according to the regulations. After the approval of the Municipal Bidding Office, the construction unit has the right to choose the top construction unit among the unsuccessful units.

2, in strict accordance with the relevant provisions of the state and the relevant requirements of the "contract law" signed a construction contract.

3. Project settlement: the bid price of this project is taken as the basis for project price settlement; Increase or decrease (that is, the workload that has not been calculated at the time of bidding or increased or decreased due to design changes), as well as the changes in charging standards and material budget prices caused by changes in national policies during the contract period, shall be adjusted.

Project settlement is entrusted to xx for approval.

4. Payment of project funds: 65,438+00 days after the signing of the construction contract and before the commencement of the project, 65,438+00% of the bid price shall be paid in advance for project preparation; Thereafter, 60% of the actual construction and installation workload completed last month shall be paid monthly.

When the project funds (including reserve funds and progress funds) are allocated to 60% of the bid price, the allocation will be stopped; The remaining 40% shall be paid within two years after the project is completed and accepted and meets the contract requirements.

5. Liability for breach of contract and reward and punishment measures:

5- 1, this project implements high quality and good price, and if it is assessed as an excellent project after completion and acceptance, it will be rewarded at 2% of the bid price; If the quality level fails to meet the bid-winning promise, it will be punished according to 2% of the bid price.

5-2. This project is required to be completed within the bid winning time limit; Two ten thousandths of the tender price will be rewarded and punished for each day of delivery in advance or delay.

5-3. If the construction period of this project is delayed due to the reasons of the construction party, it shall pay liquidated damages to the construction party at the rate of two ten thousandths of the winning bid price every day.

Eight, the tender instructions:

1, the bidder shall pay a bid bond of xx million yuan to the tenderer when obtaining the tender.

2. After winning the bid and before signing the contract, the bidder shall provide the bid performance guarantee contract to the tenderer to ensure that once the bidder wins the bid, it will sign the contract in accordance with the relevant provisions of the bidding documents to complete the winning project; Bidders who fail to provide bid performance guarantee as required will be regarded as not responding to the bid conditions and rejected, and their bid bond will not be returned.

2- 1. Form of performance guarantee: cash guarantee.

2-2. Guarantee amount: cash is used, the performance guarantee amount is xx million yuan, and the bid performance bond will be deposited into the bank account designated by the tenderer.

2-3. Validity period of performance bond: The validity period of bid bond is the approved completion period of the winning project.

3, the project site inspection and bidding questions and answers:

At 3- 1.20xx * * * * * 16: 00, a tender meeting was held for this project in the city trading center, and an on-site inspection of the project was organized.

At 09: 00 on March, March, February, and October, 20, this project was defended by bidding in the city trading center. Bidders should put forward their own opinions on unclear issues such as bidding and construction design, and then the tenderer will give a written reply together with the design unit.

4, tender offer value:

The upper limit of tender offer is * *. Ten thousand yuan;

The lower limit of tender offer is * *. One million yuan.

5. Preparation, sealing and delivery of tenders

5- 1. Bidding documents include commercial bidding documents and technical bidding documents.

5-2. The contents of the commercial tender include:

5-2- 1. Business standard A: Response to the bidding documents; Ability and credibility; Comprehensive description (i.e. project name, scope, quotation, quality grade, construction period, warranty commitment, etc.). ); Signature of the bidder and legal representative; List of members of project management department; And other documents and certification materials that need to be explained.

5-2-2. Business Bid B: Bidding Quotation and Letter of Commitment.

Bind the above information into a book in duplicate (one original and one copy). Among them, the bidder and the legal representative must sign and seal the tender offer and letter of commitment.

5-3, technical tender is mainly the construction organization design; This project requires the bidder to provide the construction organization design in seven copies; The requirements are as follows:

5-3- 1, the chapters in the technical tender are arranged in the following order and requirements:

A, the construction scheme

Second, the construction progress plan and guarantee measures

Third, quality assurance measures

Fourth, measures to ensure safety

Five, civilized construction site measures

Sixth, rationalization proposals.

5-3-2. Cover: receive the uniform cover style from * * Tendering Agent Co., Ltd.;

5-3-3. Table of Contents (only big headlines are listed in the table of contents) and titles (big headlines are listed in the table of contents): the font is unified as No.3 imitation Song font; Title levels one, two, three ...;

5-3-4. Subtitles and text fonts are unified into No.4 imitation Song font; Subtitles and text contents are arranged in the following levels: the second level is 1, 2, 3, ... The third level is 1- 1, 2-2, 3-3 ...;

5-3-5. The title of the table and schematic diagram is Song Imitation No.4 font, and the content font is unified as Song Imitation No.5 font;

5-3-6. All fonts are standard fonts, and bold or diagonal processing is not allowed; The CAD drawings conform to the drawing specifications; 5-3-7, technical standard shall not be numbered, and blank inserts shall not be left before and after;

5-3-8. The following contents which are helpful for bid evaluation experts to see or understand the tender preparer shall not appear in the technical tender: unit name, personnel name, unit location, telephone number and special signs, etc.

5-3-9, typesetting requirements:

5-3-9- 1, and the row spacing is 1.5 times the row spacing;

5-3-9-2. No blank lines are left between chapters, and left and right indents are not set (the first line is indented by 4 characters);

5-3-9-3. No decorative contents such as titles and shading are allowed.

5-4. The commercial bid and technical bid are printed in black and white on A4 paper, and color pages are not allowed; Tables and schematic diagrams using A3 paper must be folded into A4 size for binding, and there is no inversion or reverse installation. All technical tenders must be printed by computer, and handwriting is not allowed.

5-5. Sealing of business standard: put business standard A and business standard B into the designated information bag, seal it with transparent adhesive, and the cover of the information bag shall not be marked.

5-6. Sealing of technical tender: stack the above sealed commercial tender together with seven technical tenders neatly, and then seal them into a large package with specified wrapping paper and transparent adhesive, with no trace on the cover.

5-7. The bidder shall deliver the above sealed tender to the Construction Engineering Trading Center of * * city before 09: 00 on * * of 20xx (it will be invalid after the deadline).

Nine, bid opening, bid evaluation and calibration

1. This project is scheduled to be publicly opened at the Construction Engineering Trading Center in * * at 09: 00 on * * of 20xx.

2. The personnel that bidders must attend the meeting are: the legal representative or the agent entrusted by the legal representative (with the power of attorney of the legal person), and the project manager who bids for this project, with a total number of no more than 5 bidders;

3, all participants must attend the meeting on time, and abide by the rules and regulations and discipline of the bid opening site.

4. The following materials shall be submitted at the bid opening site:

4- 1. Original enterprise qualification certificate and business license;

4-2, legal person certificate (or power of attorney) and the corresponding original ID card;

4-3, project manager certificate, project technical director certificate and the corresponding original ID card;

4-4. Valid certificates and documents of the construction administrative department.

5. The bid evaluation method of this project adopts the comprehensive evaluation method in Chen Jian Zhao Zi [20xx] No.6 (there is no pre-tender estimate, but the upper and lower limits are specified in the bidding documents). See attached table 1, attached table 2, attached table 3, attached table 4 and attached table 5 for the score table and weight values.

6. The winning bidder of this project is determined by the way that the person with the highest score according to the evaluation results is the winning bidder.

Ten, one of the following circumstances, bidding or bidding qualification is invalid:

1, the tender is not sealed as required, and the commercial tender is not stamped with the official seal of the unit and the signature of the legal representative;

2. If the technical tender is not prepared and printed as required, the technical tender is invalid;

3, the tender is not delivered to the city trading center within the specified time;

4. A tender has two quotations;

5. The tenderer is late after the bid opening;

6. The legal representative of the tenderer or his entrusted agent did not attend the bid opening meeting;

7. The entrusted agent attends the bid opening meeting without a power of attorney;

XI。 any other business

1. After winning the bid, the bidder shall, within ten days, go to the * * tendering agency to receive the bid-winning notice issued by the tenderer and filed by the Municipal Tendering Office; If the unsuccessful unit requests reconsideration of the bid evaluation and calibration results, it shall submit a written request to the tenderer and the municipal bidding office within ten working days, and it will not be accepted within the time limit.

2, the winning bidder with the letter of acceptance within seven days, signed a construction contract with the owner, obtain the construction permit rear can enter the site for construction.

3. For matters not covered in this tender, please follow the Construction Law of People's Republic of China (PRC), Bidding Law of People's Republic of China (PRC), Order No.89 of the Ministry of Construction of People's Republic of China (PRC), Measures for the Implementation of the Bidding Law of People's Republic of China (PRC) in Hunan Province, Document xx Jian (20xx) No.394 and the municipal government and municipal construction.

Legal representative (signature)

Tenderee (seal)

20xx year month day

* * City Construction Project Bidding Management Office

(Seal for record)

20xx year month day