Formal construction contract template 1
Party A: (hereinafter referred to as Party A) Party B: (ID card) (hereinafter referred to as Pa
Formal construction contract template 1
Party A: (hereinafter referred to as Party A) Party B: (ID card) (hereinafter referred to as Party B)
In order to complete the construction design and budgetary estimate (budgetary estimate) of Changda parking lot leveling project with high quality and fast speed, Party A has contracted out the preliminary design and budgetary estimate (budgetary estimate) of parking lot leveling project to Party B through equal consultation between Party A and Party B, and reached the following agreement:
I. Name of the cooperative project
Second, the scope of engineering technology contracting
2. 1 site leveling and hardening construction design.
2.2 Calculation of earthwork for site leveling.
2.3 Slope protection construction design.
2.4 Construction design of mortar retaining wall.
2.5 On-site pipe network construction design.
2.6 Prepare the quantities and budget estimates of the above-mentioned projects.
Third, the term of the contract.
3. 1 From the time when Party A handed over Party B's planning drawings and related engineering materials to the time when the materials were handed over.
3.2 The construction coordination time proposed by both parties is 8 days, that is, from June 1 day, 20 to June 8, 20.
3.3 During the above-mentioned contract period, including holidays, if the design is suspended due to Party A's reasons, the project preparation time is not included.
3.4 If the construction period exceeds 65,438+0 days, Party B shall pay Party A 65,438+0% of the total engineering and technical expenses exceeding the construction period.
Four, engineering technology contract fee
4. 1 construction design and budget estimate: the total contract price is 1 1000 (yuan), in words: eleven thousand yuan only.
4.2 The design and budget expenses for engineering change and increase shall be determined by both parties through consultation according to the workload and expenses.
Verb (abbreviation for verb) The general responsibility of both parties.
5. 1 Party A's responsibilities
5. 1. 1 full name of Party A's management unit: authorized to perform Party A's obligations and rights on this project.
5. 1.2 Party A is responsible for delivering the complete set and electronic version of the planning map and the 1: 500 topographic map actually measured by a qualified surveying and mapping unit, and Party A shall provide Party B with the real information and requirements required for the construction design. If the information provided by Party A is untrue, the requirements exceed the specifications, etc. , and the design does not conform to the current situation, the number of projects is unrealistic, and Party A shall be responsible for this.
5.2 Party B's responsibilities
5.2. 1 Party B's detailed address: No.33 Luohe Road, Yiling District, Yichang City.
5.2.2 Name of authorized representative of Party B: (ID number). If Party B interrupts the replacement, Party B shall notify Party A in writing two days in advance. The replacement can only be carried out with the written consent of Party A's representative, and the successor will continue to bear the responsibilities and commitments of his predecessor.
5.2.3 Party B shall be responsible for the preparation of preliminary construction design and budget (pre-calculation) data required for this project.
5.2.4 Provide Party A with preliminary construction design and budget (pre-budget) data within 8 days.
5.2.5 Party B shall cooperate with Party A to be responsible for the interpretation and preparation of the handed-over data.
The payment method of intransitive verb contract fee
6. 1 Party B shall complete the construction design and budget estimate (pre-tender estimate) prepared by Party A with good quality and on time according to the provisions of the special contract. Party A shall pay all expenses (1 1000 Yuan) to Party B in one lump sum.
6.2 In case of any dispute or breach of contract during the performance of the contract, both parties shall settle it through negotiation. If negotiation fails, both parties agree to submit it to a people's court with corresponding jurisdiction.
6.4 The original of this contract is in duplicate, one for each party and four for Party A, all of which have the same legal effect.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Formal construction contract template 2
Party A:
Party B:
According to the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC) and relevant laws and regulations, on the basis of equality, voluntariness and full consensus, in order to clarify the rights and responsibilities of both parties in the construction process, according to the actual situation of this project, Party A and Party B sign the following clauses.
I. Name and location of the project:
Second, the way of contracting: contracting for materials, manufacturing and installation.
Three. Style requirements: subject to the drawings and Party A's requirements.
4. Payment method: The construction starts after the contract is signed, the materials arrive, and the person in charge checks and signs. After the completion of every tenth floor, Party B shall pay 80% of the completed project cost, 80% of the total project cost after the completion of the project construction, 95% of the total project cost after the completion acceptance, and the remaining 5% shall be used as the quality guarantee, which will be paid without interest after three years.
5. Quality standard: The construction shall conform to the current national construction acceptance standard, and the construction is qualified.
Six, production safety and safety accident treatment
1. Safe construction: The employer and the contractor must implement the laws, regulations and rules on safe production promulgated and implemented by the state, government and industry authorities, and organize the construction in strict accordance with safety standards.
2. In case of casualties of Party B, both parties shall do their utmost to rescue and protect the site and accept the investigation and appraisal of relevant departments. After the casualty accident is characterized, the responsibility should be clarified. If Party B fails to carry out the construction according to the specification requirements in violation of regulations, the accidents caused thereby shall be borne by Party B. ..
Seven. Rights and obligations of Party A
1. Party A is responsible for technical disclosure, inspection, inspection application and organization acceptance during construction.
2. Provide accommodation, kitchen layout, production site and water and electricity supply for Party B's construction team. Provide vertical transportation for transporting materials upstairs.
Eight. Rights and obligations of Party B
1, manufactured according to relevant national quality standards, manufactured and installed after actual measurement according to the drawings provided by Party A, otherwise all losses caused shall be borne by Party B. ..
2. Obey the management of Party A, carry out safe and civilized construction, and ensure the quality. All safety accidents caused by violation of operating rules shall be borne by Party B. ..
Nine. For matters not covered in this agreement, both parties shall sign a supplementary agreement.
X this agreement is made in duplicate, one for each party.
XI。 This agreement shall come into force after being signed by both parties, and shall be terminated after the payment is settled at the end of the project.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Formal construction contract template 3
Employer (Party A): _ _ _ _ _ _
Contractor (Party B): _ _ _ _ _ _
First project
(1) Project name: _ _ _ _ _ _ _.
(2) Project location: _ _ _ _ _ _ _.
(3) Project content and unit price: the annex to the contract.
(IV) Scope of the contract: According to the engineering construction drawings provided by Party A, the contents are as follows: Appendix to the contract.
(5) Signing method: contract liquidation.
The second construction section
(1) The construction period is _ _ _ _ _ _ days, starting from _ _ _ _ _ _ _ _.
Article 3 Project Quality Standards and Warranty Period
(a) the engineering quality standards shall be implemented according to the current national construction specifications and acceptance specifications.
(2) The project warranty shall be implemented according to the relevant regulations of the Ministry of Construction, and the warranty period shall be one year. The warranty period starts from the date of signing the completion acceptance.
Article 4 Payment and settlement of wages
(1) Party B shall work out the material purchase list together with Party A according to the drawings.
(2) Payment method of wages:
Pay wages according to the progress of the project. Pay 30% of the salary within 7 days after each type of work starts; Pay 50% of the salary after the main body is capped, and the remaining 20% will be settled after the acceptance of the whole project, and paid within 7 days.
Article 5 responsibilities of both parties
(1) Party A's responsibilities:
1, provide the site, water and electricity that meet the construction conditions. Go through all the approval procedures. Provide Party B with 3 construction drawings before commencement.
2. If Party B finds any design errors during the construction, it shall submit them to Party A in time, and Party A shall give a reply as soon as possible (within 3 days).
3. Appoint _ _ _ _ _ _ _ _ _ as the representative of the site manager, supervise and inspect the quality and progress of the project, and be responsible for the change of design drawings and quality acceptance in the project.
4. If the project is stopped, postponed or reworked due to design changes and design errors in the middle, Party A shall compensate for the losses caused to Party B .. supply the materials needed for construction in time, and be responsible for keeping the materials.
(II) Party B's responsibilities:
1, do a good job in construction quality and safety management according to construction safety specifications. All construction quality and safety accidents during the construction period shall be borne by Party B, and Party B shall bear corresponding responsibilities.
2, completes the finished product protection, such as damage to the finished product and damage to Party A's goods, according to the price compensation.
3. Appoint _ _ _ _ _ _ _ as the site management representative, responsible for the construction quality, safety and communication with Party A during the construction period.
Article 6: Supplementary provisions
Attachment:-Quotation List of Villa Main Contractor
Attachment: Construction Drawings
Party A (seal): _ _ _ _ _ Party B (seal): _ _ _ _ _
Representative of Party A (signature): _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Representative of Party B (signature): _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Formal construction contract template 4
Party A: Limited by Share Ltd (hereinafter referred to as Party A)
Party B: enterprise group company (hereinafter referred to as Party B)
According to the Contract Law of People's Republic of China (PRC) and the Regulations on the Contract of Construction and Installation Projects, both parties, based on the principle of equality and mutual benefit and in combination with the specific conditions of this project, have reached the following agreement through consultation, and please * * * jointly abide by it.
1. Project: The finished product overhaul and anti-corrosion project of the joint-stock company mainly includes the following contents:
(1). 1 # The various metal surfaces of the ship's inner cabin are about 7283.m2, and the construction needs manual derusting for 364 1.5m2.
Manual heavy derusting 364 1.00 one-bottom double-sided chlorosulfonated coating.
⑵. 1# Store external metal-faced steel structures, steel cabinet frames on the upper and lower floors of equipment and ceilings, and various accessories, * * * *
3303.83, heavy rust removal, double-sided alkyd enamel.
(3) The ceiling, crew room and other wooden surfaces are 934m2. Blow putty and paint with alkyd paint on three sides. (4) Sporadic FRP repairs are not included in the budget, and the final accounts shall be subject to the actual quantities.
2. Anti-corrosion of stairs, overpasses and scrapers in the warehouse.
(1).546m2 The manual rust removal and dust removal of the lower belt frame is calculated as heavy rust, and chlorosulfonated polyethylene coating is used for corrosion protection.
⑵. Derusting and dust removal of 2792m2 belt frame, platform, railing and stairs of Daku overpass are calculated according to heavy rust, and chlorosulfonated polyethylene coating is used for corrosion protection on one bottom and two sides.
⑶ The scraper of ⑶.899m2 large warehouse adopts manual derusting, and one bottom and two sides are coated with chlorosulfonated polyethylene for corrosion protection.
3. The finished 3#-8# belt frame is * * m 1848m2, which is manually derusted and coated with chlorosulfonated polyethylene powder on one bottom and two sides for corrosion protection.
2. Project contracting method
1. Contract works and materials (double package)
2. Budget amount:
3. Construction period: from October 30th, 2000/KLOC-0 to February 5th, 2000/KLOC-0.
4. The head of the construction site
Party A: Party B:
Verb (abbreviation of verb) Matters that Party A is responsible for.
1. Party A shall provide medical convenience for industrial accidents during construction, but Party B shall bear the responsibilities and expenses.
2. Party A shall supervise the purchase price and quality of materials.
3. Supervise and inspect the project quality and progress.
4. Assist Party B to solve the practical difficulties encountered in the construction, provide technical disclosure and guidance, and do relevant coordination work when conditions permit.
The intransitive verb is what Party B is responsible for.
1. Complete the project specified in this contract in strict accordance with the relevant technical specifications, do a good job in civilized construction, ensure the quality and progress of the project, and ensure that the site is cleaned up after completion.
2. Ensure safe construction. Especially for aerial work, full-time safety personnel should be assigned to supervise.
3. Abide by Party A's factory rules and regulations, as well as on-site regulations such as no smoking and wearing factory entry permit. In case of violation, economic punishment (payment or deduction of project funds) shall be given according to relevant regulations of Party A. ..
4. Party B's employees can't take anything from Party A's site.
Seven. Supervision and acceptance of engineering quality
1. Party A shall designate a special person to be responsible for the inspection and acceptance of the project quality. The next working procedure can only be started after the concealed works are signed by Party A, and Party B shall actively cooperate.
2. Check and accept the completed projects according to the relevant technical standards stipulated by the state, and each project must meet the specification requirements; Otherwise, Party B shall be responsible for the quality problems caused by Party B's responsibility, and the repair costs shall be borne by itself.
3. Workshop, mobile office, comprehensive management office, auditors and financial personnel shall participate in the acceptance.
4. Acceptance must meet the standards of the former Ministry of Chemical Industry of China, and the code for construction and acceptance of anti-corrosion engineering of chemical equipment, pipelines and steel structures.
5. Visual inspection shows that the coating is smooth, uniform in color, and has no defects such as pinholes, bubbles, flowing and peeling.
6.( 1). FRP should achieve good bonding strength, no bubbles, good appearance and corrosion resistance.
7. Uniform coating is required, and the coating thickness and number of layers should meet the design requirements.
8. During the construction, the quality of anti-corrosion engineering and painting records formulated by Party A shall be strictly observed, and each layer shall be painted for 24 hours, and the second painting shall be carried out after being checked and signed by Party A's competent personnel. ..
Eight. Compilation basis and payment method of budget and final accounts.
1. Quantity of works: After the project is completed, Party A will provide information according to the drawings as the basis for Party B to handle the final accounts, and actually adjust and implement the budget and final accounts system.
2. Handling the final accounts of the project: According to "Chitianhua 20- Jicai ZiNo. 1 1",
According to "95 Guizhou Installation Quota" and "20 System Installation Quota" and "98 Guizhou Civil Engineering Budget and Final Account Quota" and corresponding supporting documents.
3. Main anti-corrosion materials (such as resin, acid-resistant porcelain plate, acid-resistant cement, etc.). ) are adjusted according to the market price, and auxiliary materials are adjusted according to the quota.
5. According to the standards of state-owned second-class enterprises, the fees for personnel and machinery will be reduced by 40%.
6. After the project is completed, Party A shall check and accept the quality of Party B's project ... After the final accounts are approved and signed by Party A, they shall be submitted to the financial audit, and both parties shall settle the accounts at the approved price.
7. Party A prepays 30% of the budget project funds as the material purchase funds.
8. One-time settlement after acceptance.
9. The quality deposit shall be withheld at 5% of the final accounts of financial audit, and paid to Party B after six months without quality problems. If there is any problem, the quality guarantee money will be deducted.
Nine. Default penalty
1. Party B guarantees to complete the project on the date stipulated in the contract. If the delivery is delayed, it will be one year from 200 1 year.
From 1 1 5th of the month, Party B will be charged 0.5% of the total project budget (i.e. RMB) as liquidated damages (deducted from the final settlement) for each day of delay.
2. This contract shall come into effect after being signed by both parties, and neither party may unilaterally breach the contract. If either party breaches the contract, it shall pay 10% of the contract budget to the other party as liquidated damages.
10. Any dispute arising from the execution of this contract shall be settled by both parties through consultation. If negotiation fails, either party may bring a lawsuit to Chishui People's Court for settlement.
XI。 This contract is made in seven copies, with Party A holding five copies and Party B holding two copies.
Twelve. Date of signing the contract: 20.
Formal construction contract template 5
Party A: (hereinafter referred to as Party A)
Party B: (hereinafter referred to as Party B)
Through negotiation between both parties, Party A entrusts Party B with the task of supporting the foundation pit of the Library of Hangyuan. In order to promote the smooth progress of the project, the following agreement is reached:
(1) Project site selection:
(2) Project name:
(3) Project content: slope repairing, hole forming, grouting, cage making, netting and concrete spraying.
(4) Contracting method: contracting for work and materials.
(5) Project cost: 140 yuan ㎡. (The quantity of works shall be settled according to the design scheme and changed according to the actual area. )
(VI) Payment method: 50,000 yuan will be paid for the foundation pit support, 50% of the total cost will be paid for the third floor of the main project, and all the remaining project funds will be paid for the foundation pit support after the main project is capped.
(7)3.5 1% tax shall be withheld by party a. ..
(VIII) Everything entrusted by Party A to Party B's construction personnel shall be calculated by the hour, and all work stoppages caused by the lack of material supply for projects not contracted by the contractor shall be calculated by the hour.
(9) When machinery is used in the back office, Party B's shift fee shall be extracted according to the provincial construction quota.
(X) Party B must abide by all rules and regulations when entering Party A's unit, and the labor protection articles shall be solved by Party B itself.
(1 1) Quality acceptance standard: according to the actual situation, the construction acceptance shall be carried out according to the current national construction acceptance standard (Party B shall provide all engineering data for technical data).
(12) During the construction period, due to the heavy workload of Party A, Party A shall provide accommodation ... During the construction period, Party B shall be responsible for any industrial accidents.
(13) During the construction period, Party A shall closely cooperate with Party B to do a good job in civilized construction, and Party B shall strive to complete the engineering tasks with high speed and high quality.
(14) Construction period: Party B shall complete the project within _ _ _ _ days after earth excavation. In case of rain or other force majeure accidents, it can be postponed.
(15) this agreement shall come into effect after being signed by both parties, and shall automatically become invalid after the acceptance and settlement are completed.
(XVI) This Agreement is made in quadruplicate, with each party holding two copies.
Party A: Party B:
Employer (seal): Employer (seal):
Person in charge: person in charge:
Contractor: Contractor:
Site representative: Site representative:
Telephone message:
Telephone message:
Bank of deposit: Bank of deposit:
Account number: Account number: signed on _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
Relevant clauses of template 5 of formal construction contract:
★202 1 five regular versions of construction contract
★ 5 templates of common engineering construction contracts.
★ General Edition of Engineering Contract Model 5 articles
★ Five construction agreements
★ Engineering construction contract 202 1 5 samples.
★ 5 copies of model contract for rural self-built houses.
★ Five samples of engineering contract specifications.
★ 5 General format of engineering construction contract
Taken the latest template 202 1
★ Five templates of road construction contract