Huancheng West Road (Yangjiang Road-Tiyu Road)
Lingzhi Town, Jinghu New District, with a total length of1049m and a road width of 30m.
20 14.8 ~ 20 15.3 completed this year.
Go to the Olympic Sports Center to watch the game, and go straight to Huancheng West Road.
Yangjiang Road Reconstruction Project
Lingzhi Town in Jinghu New District, with a total length of 1.99km, starts from Shaosan Line in the east and reaches Jiefang Avenue in the west, with road widening and landscape reconstruction.
2014.11~ 2016.6, 60% of the overall image progress was completed this year.
There are new science and technology museums, libraries, cultural centers and Olympic Sports Center on Yangjiang Road, which will become another scenic avenue in Jinghu New District after completion.
Yangjiang Road West Extension (Shaoqi Highway-Administrative Boundary)
Dongpu Town, Jinghu New District, with a total length of 1400 meters and a width of 36 meters.
2014.12 ~ 2016.6, partially completed this year.
The extension of the Yangtze River will make the traffic between Jinghu New District and Keqiao District more convenient.
Hudi tunnel on Pingjiang Road
Didang New City, Pingjiang Road extends northward through Didang Lake to the north of North Double Track.
From 20 14.7 to 20 16.6, the overall image progress has been completed by 75% this year.
Pingjiang Road Tunnel is a key section connecting Paozhong Road and High-tech Zone, which will alleviate the congestion of Zhongxing Road and Yuedong Road.
Reconstruction Project of Zhangjiaao-Wushitiao Mountain Section of Baifu Highway
Fusheng Town, Shaoxing High-tech Zone, subgrade reinforcement, masonry retaining wall, road surface changed from white to black, and bend was improved, with a total length of 3438+0km.
20 14.8 ~ 20 15.4, completed this year.
Transform and upgrade urban and rural roads, and accelerate the integration of urban and rural areas in Fu Sheng.
South Extension Project of Paozhong Road (Yuecheng Section)
Donghu Town, Shaoxing High-tech Zone, is 2182m long and 40m wide, with 5 bridges along the line.
From 20 14.7 to 20 17.6, the overall image progress has been completed by 40% this year.
The construction of Paozhong Road is expected to achieve a breakthrough in key demolition this year.
Zhongshan Road (Second Ring Road to Yinzhou Road)
Gaobu Town, Shaoxing High-tech Zone, newly built 560m and rebuilt 2850m.
2015.2 ~ 2016.12, 50% of the image progress was completed this year.
Following the opening of Zhongshan Road and Second Ring Road, Shaoxing High-tech Zone has another access to Shaozhu Expressway.
Yuexing Road Reconstruction Project (Sanjiang Road-Yangjiang Section)
Paojiang development zone, with a total length of 5.2 kilometers and a width of 50 meters, is the first phase of local reconstruction of the old road; The second stage is the widening of non-motor vehicle lanes and sidewalks, as well as the greening on both sides of the road.
2014.9 ~ 2017.12, local reconstruction of the old road will be completed this year.
Yuexing Road is the main road to the north of Paojiang River, which is of great significance for connecting Shaoxing exit of Hangzhou-Ningbo Expressway and improving the environment of Paojiang River.
Suncao Highway Construction Project (Shaoxing County Reservoir-Shangyu Tiantou Highway)
Sunduan Town, Paojiang Development Zone, with a length of 3km and a width of 3 1m, is a two-way six-lane first-class highway.
2014.12 ~ 2016.12. Subgrade and bridge will be completed this year.
Suncao Highway Project is an important part of "Straightening out National Highway 329" and an important project to promote the integration of three districts in Shaoxing.
Yuedong Road Canal Bridge Maintenance Project
Donghu Town, Shaoxing High-tech Zone, with a length of 450 meters, rebuilt the two-way motorway, reinforced the substructure and replaced the upper structure of the approach motorway.
2014.9 ~ 2015.10, completed this year.
Yuedong Road is the main access road in the north-south direction of the urban area. Because the construction of the Canal Bridge is currently interrupted, it is expected that this road will resume traffic this year 10.
North Extension Project of Shaosan Line (Sanjiang-Tongjiata Highway)
Doumen Town, Paojiang Development Zone, with a length of 4 kilometers and a width of 35.5 meters, is a two-way six-lane first-class highway.
2015.6 ~ 2017.12, part of subgrade and bridge foundation will be completed this year.
The north extension project of Shaosan Line will cross Hangzhou-Ningbo Expressway, which plays an important role in promoting the connection between Binhai Industrial Zone and the city center.
3 1 Shaoxing municipal project in the north extension of Shaoxing-Xiaoshan section of provincial highway (Qingdian Lake to Jinghu Section)
Lingzhi Town and dongpu town in Jinghu New District, with main line 10.2km, 2 interchanges, Dazhong Bridge 1 1, connecting line 1km.
2011.3 ~ 2016.6, which was partially completed and opened to traffic this year.
Most of this road will be completed this year, and some sections will be opened to traffic. Vehicles on Shaoda Line can also directly transfer from Qingdian Lake Interchange to Jinghu New District, and the vehicles to Shaoxing North Station will be very convenient.
Zhuji extension line of Shaozhu Expressway
Zhuji, two-way four-lane expressway, design speed100 km/h.
2014.11~ 2017.10. This year, subgrade excavation and filling are completed by 50%, and pile foundation and substructure are completed by 80%.
After the project is completed, Shaozhu Expressway will be connected with Hangjinqu Expressway.
Hangzhou Taizhou Expressway
Shaoxing and Jinhua section 1 17 km, design speed 100 km/h, two-way six-lane starting point, subgrade width of 33.5m, two-way four-lane starting point, subgrade width of 26m.
The construction period is 2020. 12, and the key construction starts this year.
Hangshaotai Expressway is another major project in Shaoxing after Jiashao Bridge, with a total investment of 28.8 billion yuan. It is expected that construction will start at key points this year.
Zhongxing South Road Extension Phase II Project
Jianhu Town, Yuecheng District starts from Yushan Road in the north and ends at Jienan Highway in the south, with a total length of 3026.553 meters and a width of 40 meters.
20 13.9 ~ 20 15.9 completed this year.
Zhongxing South Road will be fully connected this year, and Jianhu Town Jienan Highway can be directly connected from Erhuan South Road.
Wang Shuxia Road East Extension Project (planning Mazhen Road to Yin Shan Road)
Fushan Street in Yuecheng District is about 450m long and 16m wide. A new bridge is built.
2015.12 ~ 2016.12, construction started this year.
Improve the road network in the west area of Yuecheng District and get through the broken road.
South Extension Project of Yuexing Road (Yuecheng Section)
Shaoxing High-tech Zone, with a total length of 3.7 kilometers and a width of 50 meters, has eight bridges, one of which is a "semi-diamond interchange".
2012.12 ~ 2015.12 completed this year.
Yuexing Road is the main channel connecting Paojiang Development Zone and Shaoxing High-tech Zone in Binhai New City. After the project is completed this year, it will play an important role in promoting the development of Binhai New City.