Summary of greening work 1 XX is the first year of the establishment of the new leadership of our logistics service group. Under the new concept, new thought and new management mode of the new leader, we are facing new pressure and new opportunities. We should further improve the property and greening management system, improve the management and service level, take deepening the logistics reform and reducing staff and increasing efficiency as the driving force, and gradually, under the correct leadership of the new leader and with the support and help of brother departments. With the aim of "doing a good job in greening management and property management, ensuring a new level of greening maintenance management", all property and greening employees are United and strive for the construction and development of logistics services. The summary is as follows:
A, greening maintenance management work
The Greening Department of our hospital is responsible for the maintenance and management of 1040 mu of roads and green spaces except buildings. Greening maintenance is a major business work of our department, and the landscape of green space also directly affects the image of our hospital. In the past, the level of green space maintenance in our hospital was weak. In the past, the mechanism of raising people and greening maintenance were all carried as burdens, so the maintenance work has always been in a backward unit. With the deepening of the reform of employment system, in order to change the passive state of backward maintenance, under the correct leadership of the group leaders, greening has formulated new management methods in greening maintenance, introduced the responsibility system of block greening maintenance, and has stable maintenance personnel. Clear the responsibility of green space conservation, and implement special funds for green space conservation. According to the way of conservation area and grade distribution, through practice, green space conservation is no longer a burden and burden. The effect is very obvious. The new maintenance management method has greatly changed the views of professionals, stimulated the enthusiasm of grass-roots personnel, and truly achieved the stability of the maintenance team, the sharing of contracting teams, the flexibility of the employment team, and the implementation of the responsibility system at all levels, so as to achieve the task to the ground and the responsibility to people. The results of maintenance assessment are linked to the interests of employees, which encourages employees to do a good job in green space maintenance, improves production efficiency and promotes the improvement of green space maintenance level. At the same time, the records are checked by special personnel every day, so that the greening and maintenance work is gradually on the track of standardized and scientific management, which has promoted the overall improvement of the maintenance level and won unanimous praise from the staff of the whole hospital.
Second, the greening project construction work
1. We have replanted 64 trees, bamboo in XX pond and more than 40 ginkgo trees. There are bamboo pavilions, round pavilions and archways on the small island of the cultural and ecological park.
2. More than 600 saplings and 400 Liriodendron trees were transplanted behind the bungalows of Cinnamomum camphora and Zelkova schneideriana.
3. Move thousands of trees for the college sewage pipe network.
4. It took 488 working days to level more than 20 mu of land for the nursery of Logistics Group and transplant tens of thousands of seedlings.
More than 40,000 pots of grass flowers have been planted in our center (now placed in front of the west gate and the library).
6. The new green area is 3472 1 m2, and the new weeding personnel are 12.
Third, do a good job in daily property services and keep the campus clean.
1. Managers constantly improve the service level, enhance the initiative of service, and establish a complete system, which can immediately apply for repair, deal with emergencies urgently, and archive everything.
2. The manager of the property building should keep the office clean before the leaders go to work and before the teachers go to class, let the leaders drink hot water, create a good teaching environment, and let the teachers devote themselves to teaching.
3. The building cleaner strictly implements the cleaning rules, cleans the building around the clock, with tight time and heavy tasks, and never does things carelessly. Clean the bathroom once in the next class to make it clean and tidy, and clean up the garbage in time to create a clean teaching environment.
4. There is a special person in charge of the road sweeper area, and the records are checked irregularly, which basically makes the campus clean.
5. Garbage transport cleaning personnel shall clean the garbage on the same day.
Fourth, strengthen resource management.
Do a good job in infrastructure maintenance and improve the efficiency of use. In terms of equipment management, we always adhere to the principles of making the best use of things, matching accounts with things, making the best use of things and doing people's duty, and always adhere to the concept of managing the house diligently and caring for public facilities.
Summary of Greening Work 2 This year, under the leadership of the Municipal Education Bureau, our school listed campus greening work as one of the important agendas of the school. After careful organization and arrangement by school leaders, and with the hard work of all the teachers in Huamu Group, the expected goal of "building a campus environment with flowers, birds, fish and insects, trees and elegant environment, thus cultivating the ideological sentiments of teachers and students and inspiring their enthusiasm for work and study" has been basically realized. The specific work in the past year is summarized as follows:
First, increase publicity and raise awareness.
The essence of campus greening is to beautify one's home and create an elegant and pleasant living space. With the help of the Moral Education Office, the Flower and Tree Group of our college actively used the class meeting time to publicize the importance of greening work to students, carried out the theme publicity activities of "greening campus and beautifying the environment", and organized students to participate in voluntary weeding, pruning and watering activities, which enhanced teachers and students' awareness of greening, environmental protection and ecology.
Second, strengthen leadership and clarify responsibilities.
Organization and implementation is the premise and important guarantee of greening work. Our flower and plant group elected the group leader, and the rest of the teachers are members. The group leader is the first person responsible for the greening work of the school. The group adheres to the idea of "overall consideration of greening and beautification and scenic spot setting", holds regular meetings, sums up experience, studies layout work and formulates greening plans. In the practice of campus greening, the team leader took the lead in doing practical things, which enhanced the confidence of teachers and students in campus greening, improved the quality of teachers and students consciously caring for flowers, trees, garden facilities and the environment, and promoted the campus greening in our school.
Third, strengthen management and protect achievements.
1, according to the division of labor, the school green space is also subcontracted to people. Do a good job in supervision.
2. The team regularly sprays and prunes the green space, flowers and trees to effectively prevent pests and diseases. 3, the establishment of inspection and assessment system, linked to personal quantitative evaluation.
4. Set up signs and designate special personnel to manage trees.
5. Encourage faculty to donate money to plant flowers and trees.
6. Establish a compensation system.
Campus greening is an important symbol of the level of school logistics management. Through our efforts, today's campus is full of vigorous development and beautiful scenery. Although we have made some achievements in greening and beautifying, we still need to make great efforts to maintain the garden-style campus. In the future, we will make persistent efforts to push the greening and beautification work to a new height.
Xiaogang junior high school Hua Mu zu
June, two thousand xx
Summary of Greening Work Since I joined the work in July 2004, I have worked hard, been loyal to my post, exercised my fighting spirit, and constantly improved my professional knowledge and business ability. Under the guidance of predecessors and masters, with the help of leaders and colleagues, I have further improved my professionalism, ideological realm, professional quality and working ability through my own efforts, and achieved certain work results. The total greening area of landscape engineering is nearly 654.38+10,000 square meters, and more than 654.38+10,000 trees and shrubs are planted. I have some experience in all stages of my work, and now I report my work and study since years ago as follows:
1, construction preparation
1- 1, field investigation. Field investigation is very important. It is best to conduct on-site investigation together with the relevant leaders of Party A's engineering department to clarify the construction scope and understand the distribution of outdoor pipe network in the construction area.
1-2, review the construction drawings. Understand the design intent, review the construction drawings, and solicit opinions from superior leaders. Communicate with the designer and the competent leader of Party A's engineering department for many times, and put forward suggestions for revision. The drawings must be reviewed in detail, and the unclear places must be clear. Remember not to hold supplementary meetings.
1-3, plan and report in time. According to the time limit for a project agreed in the contract and Party A's requirements, prepare the crossing chart of labor, materials and machinery mobilization plan. Before construction, carefully study the construction drawings, conduct on-the-spot investigation, prepare the summary table of main materials and construction machines and tools, and make clear the name, quantity, specification, quality requirements and entry time of materials. And report to the competent leader in time.
1-4, earthwork calculation. Contact site accountant and earthwork supplier to measure site elevation, make records and form original data. According to the micro-topographic map and the actual site elevation, the earthwork required for the project is calculated.
1-5, strictly control the quality of planting soil. Soil is the foundation of landscape engineering construction, and the quality of soil directly affects the survival rate and future growth potential of seedlings. Before construction, test and analyze the soil quality of the borrow point, and purchase it after it is qualified; Before planting, take corresponding measures such as disinfection, fertilization and improvement to ensure that the backfilled earthwork on site meets the planting requirements. 1-6, urge all kinds of construction materials, construction machines and tools to enter the site as planned, and make records of acceptance and counting.
1-7, organize the construction of temporary facilities. Follow the principle of economy, practicality and convenience, and organize workers to build temporary workers' dormitories, warehouses, kitchens, bathrooms and other living facilities nearby. Arrange workers to enter the site, strengthen workers' safety awareness, and organize fire prevention, flood control and theft prevention.
2. Organize the construction work.
2- 1, refer to the construction specifications, prepare the public * * * green space construction organization design, and do a good job in technical disclosure.
2-2, on-site management. Be responsible for the daily construction management on site, and report the work progress, quality and other aspects to the leaders in time.
(1), personnel: properly arrange the daily life of workers and try to help them solve various problems in time. Strengthen workers' safety awareness and organize workers to do a good job in fire prevention, flood control and theft prevention. Considering the growth characteristics of plants in hot summer, adjusting the schedule in time is not only beneficial to the growth needs of plants, but also avoids the slowdown of growth in hot weather.
(2) Materials: Engineering materials will be stored in a centralized way after entering the site, and will be distributed as needed.
Check the recycling in time after the end to avoid loss. The greening materials are very special, especially the big trees, which are tall. Be sure to look at the route on site to prevent turning, determine the weight of the soil ball of trees, and contact the crane with the corresponding tonnage before organizing seedling transportation and planting.
(3) Machinery: Because mechanical construction is the main measure to speed up the construction progress, loaders, excavators and other construction machinery are specially arranged for large-scale site leveling and slope piling during the construction of public green space. Adhere to the on-site command task, ensure continuous operation, avoid rework and slowdown, and keep records of mechanical machine-teams at any time to avoid waste of mechanical machine-teams. When planting seedlings by crane, determine the seedling planting position and the depth of the tree pit in advance, and try to hoist them in place at one time to avoid repeated hoisting and save planting time and cost. 2-3, according to the actual situation in a timely manner to report to Party A's seedling procurement department seedling approach plan. 2-4. Record the temporary work on site in time, measure on site, and apply for visa in time. Project site visa information is the main voucher for applying for project progress payment and project completion audit final accounts. During the construction, I have been tracking the construction at the scene. If Party A's design changes or temporarily increases the engineering quantity, I will promptly notify the on-site accounting personnel and leave video materials, so that the engineering quantity of the day can be recorded on the same day, and the visa can be issued in time, so as to lay a good foundation for settlement as far as possible.
3. Post-construction maintenance work
According to the requirements of the company's construction and maintenance specifications, formulate reasonable maintenance standards, maintenance work plans and arrange daily maintenance work. In order to ensure the normal growth of plants, according to the growth needs of different plants and some specific requirements, timely technical measures such as fertilization, irrigation, intertillage weeding, pruning and pest control are taken. Maintenance and management is the basis to ensure the normal growth of plants. According to the growth needs of different plants and some specific requirements, timely technical measures such as fertilization, irrigation, intertillage weeding, pruning and pest control play an important role in landscaping projects, which is the key to the successful completion of landscaping construction projects and the formation of landscape effects. Plants are living objects, so the protection work has its particularity. In addition, plant species are rich and diverse, and their physiological habits are different, and their living environment requirements such as light, soil, moisture and temperature are also different.
The most precious wealth in work is to keep learning, making progress, summing up experience and summing up your own experience. Over the past few years, I have not only kept forging ahead, learning and innovating in my work, but also participated in various training courses and classes to learn from excellent construction sites and improve my level. There is still a long way to go in Xiu Yuan. On the road of gardens, I will continue to be conscientious and keep looking.
Summary of Greening Work 4 20xx is busy, and it is coming to an end. My unit has also been renamed as "xx City Landscaping Management Center". Under the leadership of Director Song, our unit will be further developed and expanded. With the takeover of the greening and maintenance management of Changfeng West Street, our management and protection area will be greatly increased. All this makes all drivers and passengers in our team feel the great responsibility and heavy task. Looking back, under the correct command and leadership of the "Harmony" and "Unity" leading group of the maintenance center, we coordinated with various maintenance teams and units to complete various tasks on time and made our own contribution to the greening of xx and xx streets. Now we will report on our study and work throughout the year:
First, seriously study the spirit of the safety meeting of the Bureau of Landscape Architecture and traffic regulations, and put an end to the careless work style ideologically.
In order to ensure safety in production without traffic accidents, hold regular safety meetings on time every month, lead the majority of drivers and passengers to seriously study and convey the spirit of regular safety meetings of the bureau and the contents of team affairs meetings of the unit, and make a summary before work every day; In specific work, there may be unsafe factors in the process of loading and unloading trees in crowded sidewalks, non-motor vehicle lanes, flower ponds and dead trees, which requires everyone to develop standardized work habits and spray "warning signs" on vehicles. Put into measures such as safety isolation piers, do our best to eliminate unsafe links and potential dangers and hidden dangers that may occur in the process of road greening ... Always remind checkpoint drivers to understand vehicle performance while strictly observing traffic regulations, and timely investigate and repair easy-to-occur faults to ensure safe and civilized operation of vehicles, and always put safety first.
Second, actively, timely and effectively handle vehicle management procedures to ensure that operating vehicles can be safely and efficiently put into front-line greening work.
With the continuous development of our greening and maintenance center, there are 17 motor vehicles, and the annual inspection and passage procedures of vehicles are more frequent. In particular, our dump trucks and waterwheels are special vehicles, and their business must be handled in the second branch of Qingxu Vehicle Management Office, and the queues for annual inspection and inspection of vehicles are often crowded. Just a few days ago, when we gave a license plate to a new water tanker, we went to the parking lot early to queue up. At work time, the network broke down. After a while, the network was connected, and there was equipment failure before it was time to patrol the line. If you can't do it one day, continue to go the next morning. This is what we have always thought. We will never give up until we finish it. We must improve the procedures for each car as soon as possible. No matter whether it is hot summer or cold winter, Comrade Zhao Xinping, the back office staff of our team, goes back and forth to the vehicle inspection line and the exhaust station again and again, especially in the process of replacing the vehicle driving license this year, he really made unimaginable hard work and efforts, so that one vehicle after another can be put into the street greening work smoothly, safely and efficiently, and completed their respective transportation and watering tasks.
Third, people make the best use of their talents and cars, go out early and return late, and go all out to cooperate with each team to plant trees and flowers.
Planting trees in spring and flowers in summer, whether it's transportation or watering, whether it's the small garden extending from Changfeng to the east or the heart of Nanhan Road, there is the hard work and sweat of our team workers everywhere. In early spring, trucks began to remove garbage, paper scraps and cannon skins from the green space; The waterwheel began to pour the thawed water to make the plants turn green as soon as possible.
However, in recent years, the number of motor vehicles on the road has soared, which has brought great difficulties to our transportation and watering tasks. Nevertheless, in order to improve work efficiency, the majority of drivers and passengers work at different peaks, leave early and return late, and serve the greening and beautification of Yingze and Changfeng streets with full enthusiasm.
Since the greening began in spring, the majority of drivers and passengers have been more busy, not only transporting newly planted trees and shrubs back and forth, but also cleaning up and removing the dug up dead trees, hay and muck in time.
I clearly remember that one day it was past 5 pm. I dug five or six buses seven or eight meters high in Qingxu, but I couldn't get into Yingze Street in the city. I looked at my watch. It was almost 6 o'clock. I had to greet xxx and other drivers who were still on the street to finish their work and rush to Qingxu one after another. When we came back to unload the tree to the green space at the gate of the Red Triangle, it was already around zero. Want to know, more than twice the length of the trunk trees, from dozens of kilometers away, braved the night to transport back, how much effort. ...
In summer, all kinds of grass flowers should be planted in the heart pool of Yingze Street. At one time, our truck transported boxes of morning glory and cockscomb flowers to the flower pond for each team. However, when the drivers of our team finished planting flowers and prepared to collect boxes, it was close to noon, and it rained harder and harder. There is no intention of stopping. Looking at hundreds of boxes on the ground, our public welfare post loading and unloading personnel: xxx and others braved the heavy rain to put the boxes on the car. Everyone's body is wet with water, sweat is mixed with rain, and his hands are covered with mud. At this time, it was almost two o'clock, and they didn't even take care of lunch. These are our employees, who have made extraordinary deeds in ordinary and simple jobs. When dumping and transporting garbage, they are driving on muddy roads, and their cars are stuck and unable to walk. They came down from the cart and pulled each other with ropes. Flies are everywhere, mosquitoes are flying in the garbage dump, dust is flying, and the smell is stinking. They are our employees. They dedicated their enthusiasm to the street greening work in xx city. Over the past year, in addition to transporting seedlings and flowers, * * * dumped garbage for more than 2,370 times, which basically ensured that the green garbage in the area was cleared with the production, especially Yingze East Street. We strive to be clean every day, and there is no green garbage overnight.
Speaking of waterwheels, they not only routinely water newly planted hedges, trees and shrubs, but also mainly water the newly collected 30,000 square meters of green space in Changfeng Dongyan Small Garden. More than 40,000 square meters of pipeline damaged green space in Yingze West Street and more than 35,000 square meters of green space with insufficient water pressure in Changfeng West Street need watering. They have both division of labor and cooperation. In the hot sun and high temperature, the drought is more serious, so they take measures such as night work and parking. In addition, the 293 flowerpots, 160 wooden flowerpots and 100 flower styles and flower balls in the two streets should be watered at the right time, especially the flower styles more than two meters high in the center of Changfeng Bridge. Water dripped on them from the top of the pattern and flowed into the shoes. This is the way to water the flowers and trees again and again, and stand out in the process.
Looking back on the whole year, the team, whether in-service regular workers, public welfare posts or hiring drivers, can focus on the overall situation of the unit, work hard, work hard, work together with Qi Xin and Qi Xin, regardless of gains and losses, and face their respective tasks, so that the team's work throughout the year can be completed safely and smoothly. Here, as the head of the team, I want to thank every driver and passenger who works hard in the team, and all the leaders and colleagues who support, help and cooperate with the team! Thank you and hope to get your support in the coming year!
Summary of Greening Work 5 Time flies, and inadvertently 20xx years have passed. This has been an extraordinary year. Hangzhou experienced a super typhoon that has not happened in 20 years, passed the test of high temperature, and there was heavy snow at the end of the year. All these have brought troubles to our greening and protection, but the philosophical theory of relativity tells us that everything has two sides and we will gain something at the same time. Some things are only seen in books, and only through this year's practice can we really have this knowledge.
I just came to the company at the beginning of the year and learned from the old employees about the scope of green space maintained and managed by our company and the situation of each team. We also went deep into the team, walked into the construction site, and learned practical operation from the workers in the team. Time is very short, less than three months. During this period, I realized the gap between theory and actual situation, and firmly believed that the field operation during this period was much more rewarding than the theoretical study in school, and I learned a lot of practical experience from it. As the temperature rises, there are more problems of greening and conservation. The color blocks of the isolation belt should be trimmed frequently, and weeds should be removed, fertilized and trimmed in the lawn. In particular, I know almost nothing about pests and diseases, so I have to ask the team's master and colleagues, and I also check this knowledge online. After this year, I learned about common pests and diseases, the approximate time of occurrence of common pests and diseases, the main targets of harm and common prevention and control methods. Compared with these, some sudden natural disasters will be much more difficult. During typhoon and flood prevention, workers should be arranged to install supports at the construction site all night, and they should also communicate with the Greening Office to receive the latest instructions and report the progress of the work. During the period of drought resistance and green protection, long-term high temperature is a great test for us, and many people have symptoms of heatstroke. When preventing snow and freezing, you have to go out to snow very early, and you will sweat all over in cold weather. Of course, these will not be in vain. After coming down, I have accumulated a lot of experience in maintenance and management, laying a good foundation for the work in the coming year.
At the same time, I also feel that there are still many shortcomings that need to be corrected in the future. Some problems were not well thought out and the work arranged by the team was not completed in time. Afterwards, I thought, I really didn't stand in their perspective. Sometimes the supervision of the work site is not in place, and problems that hinder the public appear and are not solved in time. There is still little communication with the Greening Office, and more work in this area will be strengthened in the future.
With the accumulation of this year's practice, I am full of expectations for the management of greening maintenance next year, and I have also found some problems that need to be improved in daily maintenance. Pruning is not in place from time to time, and some training needs to be organized. Many workers, especially new workers, don't know how to trim. In addition, watering is not timely, and those replanted seedlings are rarely watered, resulting in a higher mortality rate of replanted seedlings. There are many people in our conservation area during the day, and some trees are taller, so it will be more troublesome to spray medicine every time, so we can do it at night when there are few people. For the quarterly "double excellent" inspection, I suggest that everyone can check together before the inspection starts, so that some areas that need improvement can be put forward, and it is also an opportunity for communication.
20xx years have passed. Looking back on this year, gains and regrets coexist. For the new year, we should continue to improve what we have done well and try to correct what we have not done well. Heaven rewards diligence, and I believe that hard work will pay off. With the correct leadership of the company's leaders and the efforts of the company's employees, I think our work will go very smoothly this year and the company will continue to grow and develop.