Beijing subway changping line, also known as Beijing Metro Line 27, is the tenth subway line in Beijing, China. The first phase (from Xierqi Station to Nanshao Station) was opened on February 30th, 20 10, and the second phase (from Nanshao Station to Xishankou Station in Changping) was opened on February 26th, 20 15. The northern section of Nanyan Phase I (from Xierqi Station to Qinghe Station) was opened on 2002165438+February 3 1, and the southern section of Nanyan Phase I (from Qinghe Station to xitucheng station) was opened on February 4, 2023, with pink logo color.
As of February, 2023, beijing subway changping line starts from Xishankou Station in Changping in the north and reaches xitucheng station in the south, passing through Changping District and Haidian District. The fourth branch of Beijing Metro Operation Co., Ltd. was established on June 29, 2009, and its legal representative is Wei Li.
Related planning
According to the plan, beijing subway changping line plans to extend southward to the National Library Station. The extension was approved by the National Development and Reform Commission on 20 15. As of June 5438+00, 2023, the alignment scheme from Jimenqiao Station to National Library Station in beijing subway changping line is unstable, and the construction conditions are temporarily unavailable. This section of the line is equipped with Mingguang Bridge West Station, Zaojunmiao Station and National Library Station, which runs through the National Library Station and Beijing Metro Line 9.
On August 5, 2023, with the smooth power transmission of the last DC switchgear, the power supply system of Jimenqiao Station of beijing subway changping line South Extension Project was completely completed, and the power supply system of changping line South Extension Project was successfully electrified. On September 5, 2023, the last section of beijing subway changping line South Extension Project and the section behind Jimenqiao Station successfully passed the pre-acceptance, which laid a solid foundation for the completion and acceptance of the whole line.
Question 1: We want to know if/where it will rain tomorrow.
Question 2: I want to ask Jim why he hasn't returned the book from the library.
Question 3: