1, approve the project approval document or preliminary design approval document; Overall evaluation of planning; Main preliminary design documents (basis for preparation of construction drawings); 4 sets of geological survey reports (detailed survey); Structural professional calculation and other necessary calculations; 4 sets of complete construction drawings (the main drawing shall be stamped with the seal of the construction drawing and the seal of the person in charge, and the main drawings of buildings and structures shall be stamped with the seals of registered architects and registered structural engineers with corresponding qualifications); Planning red line map and land use scope map; Preliminary design (capacity expansion) approval opinions; Review opinions and preliminary design approval of relevant competent departments, including planning, fire protection, sanitation, transportation, environmental protection, greening, civil air defense, sanitation, earthquake resistance, etc. ; Approval document of fire control audit for construction project scheme or expansion stage.
What are the scope and contents of the review of construction drawing documents?
Construction drawing design documents must pass policy review and technical review before they can be used. Mainly based on relevant laws and regulations, the construction drawing involves public interests, public safety and mandatory standards for engineering construction.
What unit will review the construction drawing design documents?
1 After the construction unit completes the construction drawing design and meets the examination conditions, it will issue the Power of Attorney for Construction Drawing Examination to the drawing examination institution; 2. Whether the information submitted by the drawing review agency is complete and effective; (1) The materials submitted for review are incomplete and do not meet the requirements, so they will not be reviewed. (2) if the submitted materials are complete and meet the requirements, the original shall be verified, a copy shall be signed and registered for receipt; 3 After both parties sign the construction drawing review agreement, the construction unit will pay the construction drawing review fee; 4. The construction drawing review institution shall review the construction drawing design documents and issue the review results. 1 Qualified: issue qualified certificate and review report, affix corresponding special seal for drawing review on the construction drawing, and return the construction drawing, calculation book and engineering survey data to the construction unit; 2. Unqualified: (1) issue a notice of unqualified review, return the construction drawing to the construction unit, explain the contents and reasons of unqualified, and report the problems found that the construction unit, the original preparation unit of construction drawing design documents and their registered practitioners violate the laws, regulations and mandatory standards of engineering construction to the construction administrative department where the project is located; (2) For the returned construction drawing design documents, the construction unit shall require the original compiling unit to modify them. The revised construction drawing shall be sent to the original drawing review institution for review. 5. The construction drawing review institution will submit the review results to the construction administrative department of the people's government at or above the county level where the project is located for the record within five working days. (See Article 12 of this chapter for details), 6 The construction administrative department shall issue a receipt for the record of the construction drawing review data. 7. The drawing review organization will file the review data.
Who is the "Approval Letter for Examination of Construction Drawing Design Documents" and when will it be provided?
The construction unit went to the drawing review unit. . . Or the construction unit did not give it to you. If there is a drawing for approval and seal, there should be approval.
What does the construction drawing review mean?
The state implements a review system for construction drawings and design documents (including survey documents, hereinafter referred to as construction drawings).
Construction drawing review refers to the construction drawing review organization (third-party review organization) reviewing the contents of construction drawings involving public interests, public safety and mandatory standards for engineering construction according to relevant laws and regulations. Construction drawing review is generally divided into:
1. If it passes the examination, the examination institution shall issue the examination certificate to the construction unit, and affix the special seal for examination on the complete set of construction drawings.
2. If the examination is unqualified, the examination institution shall return the construction drawing to the construction unit and issue a notice of examination opinions, explaining the reasons for the unqualified.
3. After the construction drawing is returned to the construction unit, the construction unit shall require the original survey and design enterprise to make amendments, and send the revised construction drawing to the original examination institution for examination. The examination institution is responsible for the examination of construction drawings and undertakes the examination responsibility.
4. After passing the construction drawing review, there are still problems in violation of laws, regulations and mandatory standards for engineering construction, which cause losses to the construction unit, and the review institution shall bear corresponding liability for compensation according to law.
5. Unqualified construction drawings shall not be used. Engaged in engineering construction, supervision and other activities, as well as the implementation of quality and safety supervision and management of housing construction and municipal infrastructure projects, should be based on the review of qualified construction drawings.
Where is the number of the construction drawing design review document in the drawing? Is it usually a few numbers or letters plus numbers?
The drawing approval unit shall add a drawing approval seal in red. Not every drawing is available, but generally there are only three copies, two of which are used by the owner to prepare the as-built drawing, and 1 is submitted to the quality supervision station when handling the construction permit. However, in some places, the as-built drawings do not need to be stamped with the approval seal, and the drawings stamped with the approval seal are placed in the local quality supervision station.
What are the rules for the construction drawing review?
Construction drawing review refers to the construction drawing review institution (hereinafter referred to as the review institution) recognized by the competent construction department, which reviews the contents of the construction drawing involving public interests, public safety and mandatory standards for engineering construction according to relevant laws and regulations. At the same time, the method also clearly stipulates that construction drawings that have not passed the examination shall not be used. Therefore, construction drawing review is a compulsory work, so it is also called construction drawing strong review.
The construction unit shall, after completing the construction drawing design and obtaining the construction project planning permit, go through the formalities for approval of the construction drawing, and the Construction Committee shall issue the development certificate. The construction unit shall sign a testing contract with the testing unit, specifying the testing content, responsibilities and obligations of both parties, testing period and cost, etc. The review fee shall be borne by the construction unit.
1, the construction unit shall provide copies of the following documents and materials when going through the application procedures:
The "Construction Project Planning Permit" issued by the planning management department;
Approve the project documents, main preliminary design documents and approval documents;
Opinions of relevant departments on special examination and approval of fire protection, earthquake resistance, civil air defense and energy conservation.
Report on the results of engineering investigation (detailed investigation);
Full set of drawings and documents for construction drawing design (structural professional calculation, indicating the name and version of calculation software);
Other information required for review.
2, construction project construction drawing mainly review the following contents:
Whether it conforms to the relevant national mandatory standards and norms for engineering construction;
Whether the construction drawing is designed according to the approved preliminary design documents, and whether the construction drawing meets the specified design depth standard requirements;
The engineering investigation conforms to the relevant national and local technical standards and regulations;
Whether the structural design is safe;
Whether it harms the public interest.
For projects that pass the examination, the person in charge of the examination unit and the examiners shall sign and seal the examination report, and issue a Notice of Examination of Construction Drawing Design Documents to the construction unit.
For projects that fail to pass the examination, the examination unit shall submit the Review Report of Construction Drawing Design Documents signed and sealed by the person in charge of the examination unit and the examiners to the construction unit, which will be revised by the original design unit, and the construction unit will re-submit it for examination.
Once the construction drawing is examined and approved, it shall not be modified without authorization. In case of special circumstances, it is really necessary to modify the main contents of the review, and it must be reported to the original review unit for approval before implementation.
When the construction project is completed and accepted, the relevant departments shall conduct acceptance according to the construction drawings approved by the examination.
What does it mean to review the construction drawings and design documents of construction projects?
That is, after the design unit designs the documents, it needs to go through the formalities of expert review before it can be put into construction.
What drawings need construction drawing review?
All drawings, including buildings, structures, water, electricity, heating, ventilation, fire protection, etc.
Construction drawing review procedure
Review stage of construction drawing design documents:
1 After the completion of the construction drawing design documents, the construction unit shall fill in the Application for Review of Construction Project Construction Drawing Design Documents at the local drawing review center with the following relevant materials, and apply for policy and technical review of construction project construction drawing design documents.
1) Two complete sets of construction drawing design documents (general layout, building, structure, water supply and drainage, heating and ventilation, electrical, etc. );
2) Approval documents of project establishment or preliminary design and notice of approval of design scheme (copy);
3) Construction project planning permit issued by the planning department and its attachments (copies);
4) Review the qualified geotechnical investigation report (detailed investigation in duplicate);
5) Names of structural calculation books and calculation software and corresponding data file floppy disks;
6) Copy of qualification certificate of design unit (copy);
7) Construction engineering design contract (in triplicate);
8) Registration certificate of foreign design unit.
2. After the policy review is qualified, the local construction drawing design review center or other drawing review institutions with corresponding qualifications will conduct technical review on the construction drawing design documents.
3. The construction drawing design review institution of the construction project accepts the entrustment to conduct technical review on the construction drawing design documents in the fields of architecture, structure, water supply and drainage, heating and ventilation, electric power, etc.
4. After the construction drawing design documents pass the examination (or examination), the construction drawing design examination institution shall submit the examination opinions and the examination report of the construction drawing design documents.
5. The Design Management Office shall issue the approval letter for the review of construction drawing design documents in Shandong Province according to the review opinions and the review report of construction drawing design documents submitted by the construction drawing design review institution.
6, the construction unit to "construction engineering construction drawing design documents review approval", to the relevant departments for construction permits and other construction procedures.