How to make the quota of special-shaped columns
Question 1: Is the special-shaped constructional column a fixed constructional column, a special-shaped constructional column or a special-shaped constructional column?

Dear, set the constructional column.

If you still don't understand, you can ask questions and wait for a reply.

Question 2: How to set the list and quota of circular column sets? Is it a special-shaped column sleeve? The circular column has related quota subheadings, which can be taken directly. As for lists, circular columns can nest list items with special-shaped columns,

Question 3: Two columns are connected by shear wall, so is the column quota or shear wall set for columns (special-shaped columns and concealed columns)? Which specification does it refer to? Zhejiang 10 norm clearly states the concrete wall, and the columns and concealed columns connected with the wall are incorporated into the wall for calculation, and all the beams embedded in the wall in parallel are incorporated into the wall for calculation, but the formwork, whether column or wall, is set according to the actual contact area. If it is calculated by modulus, it is generally incorporated into the wall according to the modulus of the wall, and then the increase fee of the line template is calculated.

Question 4: Do special-shaped columns and frame columns belong to concealed columns? How to determine the price of special-shaped columns is there, but not the frame?

Question 5: How to distinguish special-shaped columns from rectangular columns in quota? A rectangular column consists of four right angles in the column section. Irregular columns are all columns except rectangular columns and cylinders.

Question 6: When making the quota, the special-shaped columns should be divided into two parts: the side width is within 500mm and the outside. Which side is 50 minutes, please? There may be regional differences. Liaoning does not have this regulation. If you look at the calculation rules and instructions of quota, it is more common to calculate according to the long side from the perspective of quota.

Question 7: How is the entry of the valuation quantity of Guanglianda entered? Do all rectangular columns and special-shaped columns have to input quantities one by one? First, practices can be set in the diagram and imported when pricing, but they need to be adjusted and are prone to errors.

Second, set the quota in the pricing software, and then enter the quantity (you can simply set the quantity in the figure or increase it slowly in the report).

Third, these are two ways for me to raise the volume. Let me show you the screenshot.

I set this up. This is my own manual increase in quantity.

Question 8: What is the quota of the end column? We should cut the end columns into special-shaped columns and shear walls respectively. Zhejiang 10 norm clearly stipulates that the concrete wall and the wall connecting column, concealed column and parallel embedded wall beam are all incorporated into the wall, the formwork column wall is all incorporated into the wall according to the actual contact area, and the line formwork increase fee is calculated according to the wall module.

Question 9: Why can't the cube of special-shaped column be calculated on Guanglianda? See if there is a summary, and whether the quota and list of applications are correct. Do not apply the budget quota, but use the budget quota list library. If it is determined that the workload cannot be summarized, completely uninstall the software, remove the garbage, reinstall the software, and summarize again.

Question 10: The quota of column sets does not need to be calculated separately, because the templates are supported together, and the technology and practice are the same, that is, the unit price is the same, so it is not necessary to calculate separately before making a budget. Grasping the big and letting go of the small is simple and quick.