Current location - Training Enrollment Network - Books and materials - When is the operation time of Chongqing Light Rail Link?
When is the operation time of Chongqing Light Rail Link?
The operation time of Chongqing Ring Road is from April 9, 20021year. The inner ring of the subway ring line leaves at 6: 30 and the outer ring at 6: 30. The last bus is at 23: 00 in the inner ring and at 23: 00 in the outer ring at the latest.

There are ***33 stations in Chongqing Metro Ring Road, and the running path of the inner ring is: Chongqing Library → Chongqing North Station South Square → 4 km → Chongqing Library, and the running path of the inner ring is: Chongqing Library → Chongqing North Station South Square → 4 km. The running path of the outer ring is: Erlang → four kilometers → South Square of Chongqing North Station → Erlang; The semi-running path of the outer ring is Erlang → 4 kilometers → Luojiaba.

There are 33 stations (Erlang-Hualong) passing through the ring road (outer ring) of Chongqing metro rail transit, including 8 transfer stations, which can transfer to lines 3, 6 and 9. The operation time of the rail transit loop (outer ring) is 06:30 at the earliest and 23:55 at the latest. The operating hours of specific stations are different. Passengers who need to transfer should consider the transfer route and station time and plan their travel plans in advance.

Chongqing rail transit ring road

Chongqing rail transit loop adopts steel wheel-rail subway system, and the logo color is lemon yellow. It is an important rail transit backbone line of Chongqing rail transit basic network and the only closed loop line. Construction started on 201318128, and the northeast ring road is expected to be opened at the end of 20 18 12 ("Chongqing Library"-"Chongqing North Station South")