Address: Intersection of Yudong Avenue and Yuxiang Road, Liangqing District, Nanning, Guangxi Zhuang Autonomous Region
Opening hours: 2065438+August 8, 2008, and will be open to the public shortly thereafter.
Recently, it was learned from Nanning Weining Investment Group Co., Ltd. that Nanning New Library, one of the public welfare projects to welcome the 60th anniversary of the founding of the autonomous region, completed the main capping last year. At present, the indoor decoration and water and electricity installation projects have been basically completed, and it is expected to be completed and accepted before June 30. After completion, Nanning will add another landmark building.
Because the business area and function configuration of the existing library can't keep up with the development needs of the library, it restricts the integration and effective utilization of the resources of Nanning Library and seriously affects the borrowing rate of readers. Therefore, the new library of Nanning Library came into being.
The new building project is located in the south of Yudong Avenue and west of Yuxiang Road in wuxiang new district, with a building height of 36 meters, 7 floors above ground and 1 floor underground.
The project started on February 30th, 20 16, and the main body was capped on August 8th, 20 17.
Yesterday, when I came to the project construction site, I saw that the new building of Nanning Library was unique in shape, with a layered appearance like a book being opened, and at the same time, it incorporated elements of Guangxi Zhuang township such as terraced fields, bronze drums and wind and rain bridges.
Entering the museum, the interior decoration is simple and generous, which is quite modern. The new Nanning Library will break through the basic functions of library collection and lending, increase leisure places such as restaurants, coffee bars and maker spaces, and create an activity space for cultural exchange.
The new Nanning Library will be opened for trial operation in June 5438+February this year.
After the new library is completed and opened, it will become a municipal public library with cultural taste, local characteristics and rich modern flavor, and together with comprehensive cultural facilities such as Nanning Museum, Nanning Folk Song Museum and Youth Activity Center, it will form a public cultural service center in Nanning.
The new Nanning Library has a total land area of 42.04 mu and a total construction area of 36 127.
73 square meters, of which the above-ground construction area is 26872. 19 square meters, the basement construction area is 9255.54 square meters, and the building height is 36 meters. There are 7 floors above ground and 1 floor underground.
(Nanning Library renderings)
The library has designed a collection of 3 million books and about 2,500 reading seats. Its functions mainly include collection area, borrowing area, consulting service area, announcement activity auxiliary service area, business area, office area, technical equipment area, logistics support area and other functional rooms.
(Aerial view of Nanning Library)
The basement is set as a motor vehicle parking garage and equipment room; The first floor is 4.6 meters high and is mainly set up as lecture hall, exhibition hall, new book recommendation area, training room, business office area, logistics support area and stacks. The second floor, 5.7 meters high, is mainly set up as a hall, newspaper reading room, children's reading room and book lending and returning space. The lecture hall, exhibition hall and new book recommendation area are two floors high; The third to sixth floors are mainly reading rooms, the third floor is 4.95 meters high and the fourth to sixth floors are 4.8 meters high; The seven-story building is 4.65 meters high, and it is mainly equipped with office areas and rare books stacks. At the same time, a roof garden is set up to ensure natural lighting and ventilation in the office area.