Logo color: Metro Blue Wuhan Rail Transit Line 1 Station Name Chinese Station Name English Station Name Regional Transfer Line Opening Time Wu Dong Avenue Station Wu Dong Avenue Dongxihu District No.2065438+July 28th 00 Wuhuan Avenue Station Wuhuan Avenue Dongxihu District No.2065438+July 28th 00 Toutouwan Station Qiaokou District No.20654. July 28th, 38+00, Zhuyehai Station in Qiaokou District of Zhuyehai, 201April, 17 Rudder Drop Station, 2065438+July 28th, 00 Gutian No.1 Station, Gutian 1st Road Qiaokou District. No.2065438+July 28th, 00, No.2065438, Gutian No.3 Luqiao District+July 28th, 00, Gutian No.2065438, Gutian No.4 Luqiao District+July 28th, 00, Hanxi No.1 Road Station, Han Xi 1 Jieqiaokou. Line 3 in Anqiaokou District July 28, 2004 Pacific Station Qiaokou District in Yang Taiping None April 8, 2006 Qiaokou Road Station Qiaokou District None July 28, 2004 Chongren Road Station Qiaokou District None July 28, 2004 Liji North Road Station Jianghan District None July 28, 2004 Xunlimen Station Jiang 'an District. No.2065438, Street Riverside District+No.2065438, Erqi Road, July 28th+No.2065438, Xuzhou Xincun Station, Xuzhou Xincun Riverside District+No.2065438, Danshuichi Riverside District, July 28th+No.265438, Xinrong Station, Xinrong Riverside District, July 28th. Line 2065438+July 28th 00 Dijiao Station 2065438+July 28th 00 Tengzigang Station 2065438+May 28th 04 Shekou Xincheng Station 2065438+May 28th 04 Hankou North Station Hankou North huangpi district 2065438.
Supporting projects: Gutian Vehicle Depot, Qiaokou Maintenance Factory and Hankou North Parking Lot.
Reminder: As the signal system does not support automatic safety doors, there is no platform gate except Xunlimen Station. Passengers should pay attention to safety when waiting for the bus and stand within the yellow line. There is no toilet in the first phase station (Zongguan to Huangpu Road). Passengers who need to go to the toilet please go to other stations (the toilet is in the payment area), and the toilet at Xunlimen Station is in the transfer hall. The gate of the whole line 1 platform will be installed soon. The transfer time between Zongguan Station and Xunlimen Station is long. Wuhan Metro 1 Line is the first high-speed rail line in Wuhan and the first urban rail transit in central and western China. Wuhan Metro 1 Line is located in Hankou, and it runs through Dongxihu District, Qiaokou District, Jianghan District, Jiang 'an District and huangpi district in the east-west direction. It starts from Wujiashan in the west and ends in Hankou North in the east. It has a total length of 28.87 kilometers and 29 stations. This project adopts 4B grouping, the designed maximum driving speed is 80km/h, and the designed maximum transportation capacity of the system is 28,500 passengers /h ... It is completed in three stages.
The second phase extends from the original first phase project (Huangpu Road-Zongguan) to the east and west ends respectively. The west section is from Zongguan to Wu Dong Avenue in Dongxihu District, and the east section is from Huangpu Road to Dijiao.
The third phase of the East Extension Hankou North Project starts at Dijiao Station, the starting point of the second phase, and ends at Hankou North Station.
The fourth phase of planning leads from Wu Dong Avenue Station, with Jinshan Avenue Station and Jinghe Station and Jinghe Parking Lot.
Entrance: Wuhan Metro Line 2 (U2)
Logo color: Plum Blossom Red Wuhan Metro Line 2 Station Name Chinese Station Name English Station Name Regional Transfer Line Opening Time Jinyintan Station Jinyintan Dongxihu District NO 2012 65438+February 28th Changqing Garden Station tsinghua campus Dongxihu District Line 6 2012 65438+February 28th Changgang Road Station. Jianghan District 2012 65438+February 28th Hankou Railway Station Jianghan District 2012 65438+February 28th Fanhu Station Jianghan District Line 3 2012 65438+February 28th Wangjiadun East Jianghan District Line 7 2065438. +200265438+February 28th Qingnian Road Station 2065438+February 28th Zhongshan Park Station 2065438+February 28th Xunlimen Station 1 Line 20 1 Jianghan District. No.8 Jianghan Road Station Jianghan Road Line 6 2012 65438+February 28th Jiyuqiao Station Wuchang Line 5 2012 65438+February 28th Xiedian Station Pangxiejia Wuchang Line 7 2012 65438+February 28th. 2012 65438+February 28th Hongshan Square Station (reverse) 2012 65438+February 28th Zhongnan Road Station Line 4 (same direction) 2012 65438+February 28th Baotong Temple Station BA5438+02. February 28th Street Crossing Station Line 8 Street Crossing Station in Hongshan District 2065433 Anhongshan District NO 20 1 21February 28th Sunshine Valley Square Station Hongshan District 1 1 Line 20121February 28th Formal Description 1 Line Xunlimen stands in Jiang 'an District, and Line 2 Xunlimen stands in Jianghan District. Fanhu Station of Line 2 was opened on February 28th, 20 12, and Fanhu Station of Line 3 was opened on February 28th, 20 15.
Supporting projects: Changqing Vehicle Depot, Zhongshan North Road Parking Lot (underground parking lot), Wujiu Railway connecting line, and Wuhan Metro Line 2 river-crossing tunnel.
Tips for boarding: Guanggu Square Station is a turn-back in front of the station. Passengers get on and off at the same platform. Please get off and get on the bus first, and take a civilized ride. The station toilets are all set in the non-payment area, and passengers need to leave the gate to go to the toilet. There is also a toilet in the transfer hall of Xunlimen Station. Hongtu Avenue Station and Line 3 transfer to Zhongnan Road Station and Line 4 transfer to Hongshan Square Station and Line 4 reverse transfer to the same platform. There are 8 marshalling sections reserved for the train on Line 2, but the platform screen door still only reaches the 6th car. Hongshan Square Station has a long transfer corridor. The transfer time between Fanhu Station and Xunlimen Station is long. Wuhan Metro Line 2 runs in the northwest-southeast direction, and will cross the Yangtze River from underground, connecting Hankou and Wuchang, passing Jianghan District and Jiang 'an District of Hankou, Wuchang District and Hongshan District of Wuchang along the way.
The first phase of Metro Line 2 runs from Jinyintan in Jianghan District to Changqing Garden, through Hankou Railway Station, along Qingnian Road and Jiefang Avenue to Zhongshan Park, across Jianghan Road and Yangtze River to Hongshan Square, along Zhongnan Road to fujiapo, and then along Luo Yu Road to Luxiang in Hongshan District. Cross the river near Jianghan Road. The whole line is underground, with a total length of 27.985km. There are 2/kloc-0 stations in total, with the maximum station spacing (across the river) of 3287m, the minimum station spacing (along the river) of 904m and the average station spacing 1358m. 20 12 12 was completed and put into operation on February 28th.
The south extension line is planned to go all the way from Guanggu to Guanggu Avenue. The south extension line was changed three times a year, and it was finally decided!
Sites: Luoxiong Road Station, Guanshankou Station, Guanggu Avenue Station, Jiayuan Road Station, Guanggu Railway Station, Nanhu Avenue Station, Contemporary International Garden Station, Gaoxin No.4 Road Station, black dragon East Street Station and Guanggu No.1 Road Station.
The north extension line starts from Jinyintan, with Changqing Depot Station, Jinyintan Avenue Station, Hongtu Avenue Station, Panlongcheng Station, Panlong Management Committee Station, Jiahai Industrial Park Station, Aviation Headquarters Station and Tianhe Airport Station along the way. Hongtu Avenue Station, transfer to Line 3 and Line 8. The total length is about 20 kilometers, and it was opened to traffic on 20 16.
Entry: Wuhan Rail Transit Line 3 (U3)
Logo color: Guiyuanjin Wuhan Rail Transit Line 3 Station Name Chinese Station Name English Station Name Regional Transfer Line Opening Time Hongtu Avenue Station Hongtu Avenue (Wuhan Salon) Dongxihu District Line 8 Line 2: 20 15: 12: 28 Citizen's Home Riverside 20 15: 12: 28. Kloc-0/2: 28 Xingye Road Binjiang February 28th, 2002 Erqi Road Station, Erqi Branch Road, Binjiang District 20151228th, Luojiazhuang Station, Binjiang District 20151228th, Zhaojiatiao Station of Line 8, Binjiang District. There is no Hong Kong Road Station in Jiang 'an District on Line 2, 20 15 12.28. Line 7 20 15 12.28 Lingjiao Lake Station Lingjiao Lake Jianghan District 20 15 12.28 Fanhu Station Jianghan District Line 2 20 15 12.28 Yunfei Road Station Jianghan District 206544 Station No.7 Line in Jianghan District of Wuhan Business District 2015 65438+2015 65438 in Shuangdun Bridge Mouth of Shuangdun Station on February 28th+28 in Zongguan Station Zongguan Station in Guan Qiao Mouth Line 1 20 15 65438. Wan Hanyang District Line 4 20 14 12.28 Longyang Village Hanyang District No 20 15 12.28 Taojialing Hanyang District No 20 15 12.28 Sixin Avenue Hanyang District No 206555. 5438+February 28th Hanyang Long-distance Bus Station Hanyang District No.2015 65438+February 28th Triangle Lake Economic and Technological Development Zone No.2015 65438+February 28th Sports Center Economic and Technological Development Zone No.20. 15 65438+February 28th Dongfeng Company Station Dongfeng Motor Company Economic and Technological Development Zone Line 6 2015 65438+February 28th Zhuanyang Avenue Economic and Technological Development Zone No.2015 65438+February 28th Table Description: 6543. Zongguan Station of Line 8+0 was opened on July 28th, 2004, and Zongguan Station of Line 3 was opened on February 28th, 20 15+65438. Fanhu Station of Line 2 was opened on February 28th, 20 12, and Fanhu Station of Line 3 was opened on February 28th, 20 15.
Supporting projects: Sanjintan Vehicle Depot and Shengguandu Parking Lot.
Getting on the bus: Zhuanyang Avenue Station is a turn-back before the station. Passengers get on and off at the same platform. Please get off and get on the bus first, and take a civilized ride. Hongtu Avenue Station and Line 2 transfer at the same platform in the same direction. Hong Kong Road Station and Line 7 transfer on the same platform. The transfer time between Zongguan Station and Fanhu Station is long. The first phase of Line 3 is located underground, starting from the Economic and Technological Development Zone, northeast along Dongfeng Avenue, with Zhuanyang Avenue Station at the intersection of Zhuanyang Avenue, Dongfeng Company Station in the south of Checheng North Road, Sports Center Station in the north of Taizihu Road and Sanjiaohu Station at the intersection of Xinmin River Street. After crossing the Third Ring Road Interchange, head north along Longyang Avenue, set up Hanyang Passenger Station in front of Hanyang Passenger Transport Center, set up Sixin Avenue Station in the north, set up Taojialing Station and Longyangcun Station in the back, and set up Wangjiawan Station at Hanyang Avenue intersection to transfer to Line 4. Then cross the Han River from Yin Zhi Bridge to the east, set up Zongguan Station on Jiefang Avenue and transfer to 1 line, turn right into Wangjiadun CBD, and set up Shuangdun Station, Wuhan Business District Station and Yunfei Road Station. Take Changqing Road from Wangjiadun and transfer to Fanhu Station of Line 2, turn right at Xinhua Road, cross Jiaolinghu Park and turn to Changjiang Daily Road, and set up Jiao Ling Lake Station at Tianmendun Road. The line runs from the north block of Wuhan Library to Jianshe Avenue, and stops at Hong Kong Road, Huiji No.2 Road, the intersection of Huangpu Street, in front of Wuhan Science and Technology Museum, Erqi Road, Xingye Road and Houhu Avenue. After crossing Jingnan Road, follow the north side of Houhu Garden Community to the west, there is a citizen's home station at the intersection with Jinqiao Avenue and a Hongtu Avenue station at the intersection with Hongtu Avenue.
Metro Line 3 is the backbone line connecting Hankou and Hanyang. Focus on solving the traffic connection between economic and technological development zone, Hankou Xiwangjiadun CBD, Houhu area and the main city, support urban space expansion, and promote the development of new city groups. Construction started in June 5438+February 2009 and was completed in June 5438+2005. Entry: Wuhan Rail Transit Line 4 (U4)
Logo color: Cao Fang Green Wuhan Rail Transit Line 4 Station Name Chinese Station Name English Station Name Regional Transfer Line Opening Time Huangjinkou Station Huangjinkou Hanyang District 2014 65438+February 28th Mengjiapu Hanyang District 2014 65438+February 28th Yong 'antang Station 2065438. 04 65438+2014 65438 in Hanyang District of Yulong Road Station on February 28th+2014 in Hanyang District of Wangjiawan Station on February 28th+2014 in Hanyang District of Shilipu Station on February 28th. Yang District 20 14 12.28 Wulidun Station Hanyang District 2014/2.28 Hanyang Railway Station Hanyang District 2014/2.28 Zhongjiacun Station Hanyang District Line 6 2065438. 65438+February 28th Lanjiang Road Station Lanjiangnan Road Hanyang District 2065438+February 28th Fuxing Road Station Fuxing Road Wuchang District Line 5 2065438+February 28th Shouyi Road Station Shouyi Road Wuchang District 2014 65438+February 28th. Wuchang Railway Station Wuchang District Line 7 1 1 Line 20 13 12.28 Meiyuan District Wuchang District 20 13 12.28 Zhongnan Road Station Line 2 Wuchang District 2012/kloc. 2012 65438 of Shan 2 Line+2013 65438 of Hanjie Station on February 28th+2013 65438 of Qingyuzui Station on February 28th+2065438 of Dongting Station on February 28th. Jiazui Station Yuejiazui Hongshan District Line 8 20 13 12.28 Tieji Road Hongshan District No.2013/Luojiagang Station Lujiagang Hongshan District No.201312.28 Garden Road Hongshan District No.20 65438+20 13 65438 in Hongshan District, Renhe Road Station on February 28th, 2003+2013 65438 in Hongshan District, Yegongsi Road on February 28th+2013 65438 in Qingshan District, Yang Chun, Yangchunhu Station on February 28th. 20 13 12.28 of Line 5 in Qingshan District of Han Railway Station: Qingshan Depot, Huangjinkou Parking Lot and Wuhan Metro Line 4 River-crossing Tunnel.
Getting on the bus prompt: Huangjinkou Station is a turn-back in front of the station. Passengers get on and off at the same platform. Please get off and get on the bus first, and take a civilized ride. Hongshan Square Station has a long transfer corridor. Zhongnan Road Station and Line 2 transfer at the same platform in the same direction. Hongshan Square Station and Line 2 are opposite on the same platform, and Zhongjiacun Station and Line 6 are opposite on the same platform. The first phase of Line 4 started construction in September 2009, and the whole line was opened in May 201March, put into operation in July, and began trial operation in early September. 20 13 12.28 trial run.
The second phase of Line 4 starts from Hanyang Huangjinkou Station in the west, and the first phase ends at Wuchang Railway Station. The total length of the line is 16.8km, including underground line 13.6km, overhead line 2.9km and ground line and transition section 0.3km. There are altogether 3 stations/kloc-0, including 2 elevated stations. Transfer to 6 stops * * *, and transfer to the railway and other urban rail transit lines respectively. The control center set up a network management service center on the railway machine road by using the first phase project. Newly built Jinkou parking lot. This project will be built simultaneously with the interchange stations of Metro Line 5 and Metro Line 6.
The second phase of the project started in February 2009, and the feasibility study report of the project in April 201/KLOC-0 passed the evaluation of the expert group of the National Development and Reform Commission. 13 station will be set up in the second phase. Except Shouyi Road and Fuxing Road in Wuchang District are at Zhangzhidong Road and Lanjiang Road Station in Hanyang District, the rest 10 stations are at Hanyang Avenue. Unlike the first phase, which is all underground, the second phase has two sections and stations built in the air, that is, the track is built from the ground of Yong 'antang Station in an elevated form, and then Mengjiapu Station and Huangjinkou Station are ground stations.
In order to facilitate car owners to transfer to the first phase of Metro Line 4, Wuhan Metro Group has built four "P+R" parking lots, namely car transfer parking lots. These four parking lots are located at Qingyuzui Station, Luojiagang Station, Garden Road Station and Yegongsi Road Station respectively.
At Wuhan Railway Station and Wuchang Railway Station, Metro Line 4 can also be transferred seamlessly with trains. In Wuchang Railway Station, the subway station has two entrances and exits leading to the west square of Wuchang Railway Station, and the transfer passage is located underground and directly leads to Darcy Square. At Wuhan Railway Station, passengers can take the elevator directly to the first floor of Wuhan Railway Station, transfer to the high-speed rail at the West Square and transfer to the high-speed rail at the East Square.
There are two transfer stations in the first phase of Line 4 and Line 2, namely Hongshan Square Station and Zhongnan Road Station, which is the first mode of "continuous transfer on the same platform" in Chinese mainland. It is very convenient to transfer continuously on the same platform. Get off the car of Metro Line 4 at Zhongnan Road Station, opposite to Metro Line 2, and walk 10 meter and transfer to Metro Line 2.