Task 1 project analysis
I. Introduction of Equipment
Second, the control task analysis
Exercise 1
Task 2 Safety Factor Analysis
First, the basic principles of safety in production
Second, personal safety in production safety
Third, electrical safety in production safety
Four, safety responsibility, inspection, education and management
Exercise 2
Determination of control scheme for task three
First, the cascade control scheme of heating furnace temperature
Second, the feed forward of the heating furnace? Feedback control scheme
Exercise 3
Task 4 Selection of Temperature Detection Device
First, the basic knowledge of common temperature detection devices
Second, the project testing equipment selection
Exercise 4
Task 5 Control Equipment Selection
A, the choice of digital display instrument
Second, the choice of paperless recorder
Third, the choice of SLPC programmable controller
Fourth, the choice of hydraulic valve
Exercise 5
Task 6 Installation and Operation of Temperature Cascade Control System
I. Wiring diagram
Second, the installation of related instruments
Thirdly, the software programming of cascade control is realized by SLPC*E programmable controller.
Fourth, realize feedforward with DCS? System configuration of feedback control
Verb (abbreviation of verb) debugging preparation
6. Debugging of temperature cascade control system
Exercise 6
Appendix 1 standard thermocouple electrothermal temperature comparison table
Appendix II Thermal Resistance Ohm-Temperature Comparison Table