Answers to the bidding questions of anhui library foyer decoration construction?
Letter of explanation of bidding documents

Project Name: Decoration and Construction of anhui library Hall

Tender number: AH-G2007 109- 1

Time: August 3, 2007

The answers to the relevant questions are as follows:

1. Due to the demolition part, the original ground needs finished product protection, so it is suggested to give a price temporarily as the basis of unified quotation.

Answer: There is this item in the quota, and you can quote it yourself.

2. It is suggested that temporary pricing be given to the demolition part.

Answer: There is this item in the quota, and you can quote it yourself.

3. Is the floor, wall and top surface of the stairwell between Axis 4 and Axis 6 in the lobby of the East Building within the quotation range?

Answer: The floor and wall are quoted according to the drawings, but the top surface is still the same.

4. The storey height marked in P23 1 in the bidding documents is inconsistent with the field measurement, so please unify.

Answer: According to the drawing.

5. Are the floors of the three halls and cultural corridors original except the ground landscape, and have they not been decorated?

Answer: If the site is inconsistent with the drawings, it shall be done according to the requirements of the drawings.

6. There is no ground landscape of the East Gate Hall at1600 *1600. Please make it clear.

A: The plant landscape part will not be quoted for the time being.

7. Is the greening part within the quotation range?

A: It is not within the quotation range.

8. Does the list of main materials give temporary pricing?

A: Self-citation.

9. Does the quotation include the drawing design fee?

A:No..