Current location - Training Enrollment Network - Books and materials - Purchase application report
Purchase application report
Model essay on book purchase application report

With the development of society, more and more people come into contact with and use reports, and different kinds of reports have different uses. On hearing the report, it delayed the recurrence of lazy cancer. The following is a sample report on book application that I have compiled for you. Welcome everyone to refer to it, I hope it will help you.

Book Purchase Application Report 1 Due to work needs, the Planning Bureau needs to purchase the pricing software GBQ4.0, the comprehensive quota of municipal engineering in Hainan Province in 2005, the comprehensive quota of landscaping engineering in Hainan Province in 2005, the comprehensive quota of installation engineering in Hainan Province in 2008, the comprehensive quota of construction engineering in Hainan Province in 2005 and the comprehensive quota in 2008.

I hereby apply.

Attachment: Purchasing list of required office supplies and books.

November 1st, two thousand xx.

Book Purchase Application Report Part II General Manager's Office:

With the increasing business volume of the company and the higher requirements of customers, the original electronic equipment of our department can no longer meet the needs of work. In order to improve the business quality and efficiency of the company's xxxx department, we will complete the tasks assigned by the company's leaders on time and with high quality. Now I need to buy an A3 color printer, a multifunction machine, a computer with high equipment, a 4G memory stick, three walkie-talkies and four cameras.

(with a detailed explanation! )

Xxxx department

Xxxx year x month xx day

Reason and explanation of application

A3 color printer:

A lot of work in the projects undertaken by our xxxx department, such as construction drawings, color renderings, tables, etc., all involve the needs of A3 color printing. The existing printers in xxxx department and company office, such as borther2 140, Canon LBP7200C and HP color laser printer CP2020, can only provide our general A4 printing. At present, although the company has equipment meeting A3 specifications, it only supports black and white printing and copying. In order to improve the business quality and efficiency of the company's xxxx department and complete the tasks assigned by the company's leaders on time and with high quality, we are applying to buy an A3 color printer.

All on one machine:

In the process of project construction, project data and related process quality supervision must be tracked and recorded, and backup data should be printed. Because the project process is complex, the implementation content is large, and there are many words and data involved, all of which are printed, which leads to the waste of materials and supplies. At present, the project department is not equipped with facilities and equipment with copying function. During the implementation of the project, only one set of information was made, and it will be copied to the company after all the projects are completed. Based on this form of operation, the process of file transfer is slow, and the authenticity of copied materials cannot be guaranteed, which is extremely unfavorable to the file management construction of our company. In order to implement the construction of the company's file management system and strengthen the rigorous consciousness of librarians, our department plans to apply for the purchase of a multifunctional machine, which can be placed in the xx Road Project Department and used by other project departments in the X District.

High performance computer:

Due to more bidding and pre-settlement work in our department, the working computer configuration used by the project supervisor is relatively old at present. Today, with the rapid development of information, the documents and data given to our company by various bidding agents are relatively novel. The personnel in charge of this business in our department can't keep up with the market demand, and the basic operations such as drawings, documents and data run slowly or even can't start. At the same time, there is no reason to collapse during the work. Moreover, it can't be saved urgently, and it can't guarantee the rigor and effectiveness of bidding and pre-settlement, which also leads to low efficiency and repeated work. In order to better serve the company and meet the work needs of the superior units, we hereby apply to the company to configure a high-performance computer for the department project director (Zhang Wei).

Memory module:

The computer performance in this department is seriously aging. In the bidding process, the librarian's computer often breaks down or crashes for no reason. As our department has applied for purchasing high-equipped computers, in order to reduce the waste of resources and save money, we are now applying for 1 4G memory chips to improve the performance of computers so as to carry out our work better. We hope that the company will consider it comprehensively and feel it.

Camera:

In 20xx, our department owned 7 cameras, and 1 camera was temporarily assisted by the deputy general manager during the implementation of the X standard in the overhaul project, which has now been returned; The camera brought by the project manager has been returned when the X-mark is executed in the overhaul project; Sunshine Apartment Project Department distributed a camera, which was lost during use, and the user has submitted the specific information to the office; During the implementation of X standard of overhaul project, the camera shall be reserved by the department. This camera was bought as a gift from Taiwan. It broke down during the construction and can't be used any more. Due to the aging of the machine, the historical camera used by the department manager has been seriously damaged and cannot be used normally. At present, our xxxx department only maintains two cameras, which have been distributed to the project department, namely xx Road Project Department and xx Road Project Department.

With the continuous improvement of the company's document management system, the requirements for graphic and video materials are getting higher and higher, which has become an indispensable recording method in the project implementation process. Due to the special situation of our department, various projects are scattered, and the tracking and recording equipment can't be used together, which leads to the camera assigned by the company to our department can't meet the needs of normal operation.

In 20xx, our department plans to need six cameras, two of which have been used normally in the project department. In addition, the department head and the department reserve office need to be equipped with two cameras, the project manager's office needs to be equipped with two cameras for the project, and the xxxx department needs to add four cameras.

Note: For the cameras issued by the company, our department will strengthen management, clarify the responsible person and formulate new management measures to ensure the integrity of the cameras issued by the company. In the new year, if the camera is lost or damaged in the process of storage, it is an individual behavior and will be depreciated at the market price to compensate for the company's asset losses. Intercom:

As the company's engineering business volume is increasing day by day, it is necessary to carry out the construction of several large-scale projects at the same time, and the single mileage of the municipal road project is generally more than 500 meters, which brings a lot of inconvenience to the construction lofting. The original methods such as gesturing and calling are not suitable for long-distance construction. In order to ensure the accuracy of construction lofting, ensure the engineering quality evaluation meets the standards, and protect the physical and mental health of construction personnel, it is necessary to install walkie-talkies for easy operation. When purchasing the total station in the early stage, our department was equipped with a pair of walkie-talkies, which could not meet the needs of the construction site. Now we apply to the company for three pairs of walkie-talkies, which is convenient for the construction personnel to call each other to check the data when setting out at the site. It is mainly used by xx Road Project Department, xx Road Project Department and other measuring sections over 200m, and at the same time, it is fully prepared for the construction of xx Road in xx.

;