Before and after the implementation of the Plan, it was destroyed in the two battles in 2 1 and will continue to be built in the future. Some projects have been completed one after another:
(1) municipal government building: **4 floors, with a construction area of nearly 9,000 square meters. There is a square in front of the building that can accommodate 6,543,800 people. Sun Yat-sen Memorial Hall is built in the north, in front of which stands a bronze statue of Sun Yat-sen, which is a sculpture of artist Jiang Xiaoyu. In 22 years, the inauguration ceremony was held in June+10, 5438. Mayor Wu Tiecheng delivered a speech to 654.38 million Chinese and foreign guests and people, and nine planes flew by to congratulate them.
(2) Office building of Social Affairs and Public Works Bureau, covering an area of 6,500 square meters.
(3) City Stadium: covers an area of 300 mu. It consists of three buildings: track and field, swimming pool and gymnasium. The stadium can accommodate 60,000 spectators, and the swimming pool and gymnasium can each accommodate 5,000 spectators. In the 24th year of the Republic of China, it was put into use in June+10 in 5438, and the 6th National Games was held that month.
(4) Museum: It is a two-story building with a height of 24 meters and a construction area of 6,860 square meters. It was opened to the outside world on February 25th, 2000. At that time, China Architecture Exhibition was exhibited for the first time, with more than 40,000 participants, which was an unprecedented event in the architectural history of China.
(5) Library: a two-story building with a height of 25 meters and a construction area of 6,940 square meters. It was completed and opened to the outside world in June 25. There are 500,000 books, including more than 4,000 rare books, and the board of directors is composed of eight people, including Cai Yuanpei, Wang, Wang, and Wang.
In addition, 72 roads and 36 garden houses, including Huangxing Road, Qiu Jiang Wharf, Municipal Hospital and Conservatory of Music, have been completed, with a construction area of 5,378 square meters.