Safety personnel should establish a registration ledger for workers with special types of work and greater risks, and report the statistics of safety production activities in a timely manner. The following is the job responsibilities and workflow of the project safety officer in 20 17 for everyone. Welcome to click to view.
Job responsibilities of safety officer
1, seriously implement the laws and regulations on construction safety production, and insist on? Safety first, prevention first and comprehensive treatment? The implementation of policies and safety rules and regulations.
2. Participate in the preparation and review of management plans and measures for safe and civilized construction. , to participate in the preparation of safe and civilized construction related measurement costs.
3, responsible for the daily supervision and inspection of production safety on the construction site, and make inspection records, the safety hidden trouble on the construction site shall be ordered to make rectification.
4. Organize to participate in various safety activities and related training in time, and improve the safety management ledger.
5. Assist in the publicity and planning of project safety and civilization, and participate in the collection and collation of selection data of provincial and municipal civilized construction sites.
6, urge the project department to do a good job of division, subentry safety technical disclosure; Organize teams and groups to carry out safety activities.
7. Supervise and inspect the use of labor protection articles, stop illegal operations and illegal command behaviors, and correct and investigate the illegal behaviors of operators.
8. Be responsible for the entrance education and three-level education management of project operators, and supervise the project department to do all kinds of safety education.
9, set up a special type of work and dangerous operations personnel registration ledger, earnestly and timely do a good job of statistical reporting of safety production activities.
10, complete other work assigned by the leaders.
Work flow of safety officer
I. Safety management
1, assist the project manager to establish the project safety management organization.
2. Assist the project manager to establish the responsibility system for production safety.
3. Safety education.
(1) Three-level education: safety education of the branch? Project education? Team education
Branch education:
Educator: deputy manager in charge of safety in the branch (must have corresponding qualifications).
Recipient: Company employees (project leaders, managers, workers, etc.). ).
Project education:
Educator: project manager or full-time safety management personnel of the project department (with corresponding qualifications).
Recipient: employees of the project department (managers, workers, etc.). ).
Team education:
Educator: a part-time safety officer or team leader. (Must have corresponding qualifications)
Recipient: shift operator.
(2) Admission education for new workers.
(3) Safety technical disclosure:
(1), safety technical disclosure must be made in batches according to the type of work. When the construction conditions change, the disclosure content should be supplemented in a targeted manner; In winter and rainy season, safety technical disclosure should be made according to the seasonal climate characteristics. If the project is shut down for some reason, the safety technical disclosure shall be carried out again when it is resumed.
(2), safety technical disclosure must be carried out before the process construction, and ensure that the disclosure to all workers in the construction team step by step. The order of disclosure of construction organization design (construction scheme) is: project technical director-project construction management personnel; The order of disclosure of the divisional construction scheme is: project construction management personnel? Team leader; The order of disclosure of the sub-item construction scheme is the project construction management personnel? Team leader? Operator.
(3), safety technical disclosure must be targeted, guidance and operability, disclosure both sides need to sign in writing, and each hold a set of written information.
(4) The written information of safety technical disclosure comes from the construction organization design and special construction scheme, and the disclosure information shall be supervised by the full-time safety management personnel of the project. Safety management personnel shall review and file the accuracy, comprehensiveness and pertinence of safety technical disclosure.
(4) Cooperate with the technical person in charge of the project to educate the project staff on safety production, safety knowledge, safety skills, safety regulations and legal system, and carry out this regular popularization education throughout the whole management process.
5], the use of new technologies, new processes, new equipment, new materials and change jobs, operators should carry out new technology operation and new job safety education.
4. Be responsible for supervising the project department to sign labor subcontracting safety management agreement and temporary electricity safety management agreement with the labor subcontracting unit, and require all the laborers involved in the project to purchase personal accident insurance and purchase insurance before entering the site.
5. Establish safety management data.
6, safety production monthly report.
7, participate in the review of construction organization design (construction scheme) and safety technical measures plan.
8. Organize safety activities and regular safety inspections.
(1), careful and detailed safety inspection records;
(2) put forward the rectification plan, including hidden danger registration, rectification, review and cancellation.
9. Make statistics, analysis and report on industrial accidents, participate in the investigation and handling of industrial accidents, and insist on? Four don't let go? Its principle, generally according to the following steps:
(1), quickly rescue the wounded and protect the scene;
(2) set up an investigation team to carry out investigation;
(3) Field investigation;
(4) Analyze the cause of the accident and determine the nature of the accident;
5], formulate measures to prevent similar accidents from happening again;
[6], write a survey report;
Once, the trial and closing of the accident.
Second, the scene situation and information
1. Conduct on-the-spot investigation on the site before construction, be familiar with the construction site and geological characteristics (geological investigation report), understand the surrounding people flow and social conditions, and have the resident identity and linkage of public security police stations, medical units and government agencies. The general layout of the construction shall be submitted for approval according to the requirements of the local safety supervision department.
2, preparation materials before construction:
(1) Participate in the preparation of construction organization design. (Relevant safety shall conform to the actual situation of this project)
(2) Participate in the preparation of temporary electricity and water use plans for construction.
(3) Safe and civilized construction scheme.
(4) Participate in the preparation of earthwork excavation scheme (foundation excavation is more than 2m).
5] Participate in the preparation of foundation pit supporting construction scheme.
[6] Participate in the preparation of collapse prevention and fall prevention scheme.
Once the production safety accident emergency plan.
Being seasonal construction scheme (winter, rainy season, summer).
Levies safety accident emergency drills.
⑽ Hazard identification and risk factors questionnaire.
⑾ List of major hazard sources and control scheme.
⑿ Management of major hazard sources.
[13] Major hazard source management plan.
[14] Major hazard source management ledger.
⒂ List of safety laws, regulations and standards.
Third, the construction site and overlay safety civilization
1, according to the site layout civilization construction:
(1), fence:
(1), the height of the fence around the construction site and the overlay facilities should not be less than 2.5m in the main sections of the city and 1.8m in the general sections. Hard materials such as bricks and colored steel plates should be used, which are firm, stable, neat and beautiful, and the size and layout of publicity and spraying on the fence should be designed in strict accordance with the company's requirements.
(2) The setting of the gate shall conform to the unified requirements of the company, and a doorman shall be set up and a doorman system shall be formulated.
2, the construction site:
Hardening construction of service road shall be carried out according to the site layout, and the construction service road shall run through the whole site; The floors of entrances and exits, offices, dormitories, kitchens, toilets, material storage areas, processing areas and warehouses of the project department and the construction site shall be hardened.
(3), on-site fire prevention:
(1), fire protection requirements shall be arranged at the same time as the construction tasks are arranged on site, and the systems in important parts such as material processing area, dangerous goods warehouse and power distribution room shall be put on the wall. Equipped with a sufficient number of suitable fire extinguishers.
② The general temporary facilities area is equipped with a 10 L fire extinguisher, carpentry room, mechanical warehouse, etc. every 50m2. A suitable fire extinguisher shall be provided every 25m2, and the warehouse where oil and dangerous goods are stored shall be provided with sufficient quantity and types of fire extinguishers. Dry powder fire extinguishers are suitable for fighting fires of petroleum, petroleum products, paints, organic solvents and electrical equipment; Foam extinguisher is suitable for places with polar solvents such as ether, alcohol, ester, ketone, organic acid and heterocyclic ring. The carbon dioxide fire extinguisher is suitable for extinguishing the initial fire of live appliances, valuables, equipment, books, instruments and other places below 600 volts, as well as the fire of general flammable liquids; 12 1 1 The fire extinguisher is suitable for extinguishing flammable liquids, flammable liquids and flammable gases. )
(3) The three-level hot work examination and approval system shall be strictly implemented, and the guardian shall strictly perform his duties under the condition that the hot work certificate, operation certificate and fire-fighting equipment are complete.
(4), the site signs:
(1), the main entrance should be? Eight cards and one picture? Signs.
(2), the main entrance should be publicity column, newspaper column, blackboard newspaper, bulletin board.
(3) Signs and columns shall be clean and tidy, which shall meet the unified design and planning requirements of the company.
(4) Safety signs must be set up in the main areas of the construction site, and signs such as prompt, explanation, prohibition and warning can be set up in the areas according to the nature of the areas. , hanging various slogans consistent with the construction site.
5], health care first aid:
(1), according to the requirements of civilized construction site, the construction site should have a clinic, which should be equipped with a medicine box.
(2), the scene should have a first aid plan and first aid equipment.
(3), the scene should have trained first aid personnel.
[6], environmental protection:
(1), dust and noise prevention measures should be taken.
(2), night construction should handle the night construction permit.
(3) It is forbidden to burn any garbage and waste on the construction site.
(4) The site and service road shall be cleaned every day.
2. The living quarters meet the safety conditions:
(1), dormitory:
(1), it is forbidden to build temporary dormitory in the construction project.
(2) The construction area should be clearly separated from the office area and living area.
(3), should maintain a good sanitary environment around the dormitory, a person, regularly clean the dormitory public * * * area. The dormitory area should be equipped with necessary living facilities.
(4), the dormitory should be kept clean and tidy, and the daily necessities should be placed neatly.
(2) Public security and comprehensive management
The project department shall establish a strict public security system, which shall be set in a conspicuous place in the dormitory area together with the dormitory management system, and the system responsibility shall be decomposed to people.
Four, the site construction safety should comply with the requirements of the construction plan:
1, inspection scheme:
(1), foundation construction must have a supporting scheme or construction organization design.
(2) According to geological conditions and surrounding environment, targeted measures (such as monitoring scheme and excavation scheme, etc.) must be specified in the foundation pit supporting scheme or construction organization design. ), and the control parameters must be clearly given.
(3) For trenches or foundation pits with an excavation depth of more than 5m, or with an excavation depth of less than 5m, but the geological conditions and surrounding environment are complicated, special support design or special construction scheme demonstrated by experts must be carried out by qualified design units.
(4) The supporting design scheme or special construction scheme must be examined and approved according to the company's internal management regulations.
2, earthwork excavation:
(1), it is forbidden for construction workers to enter within the working radius of the excavator, and written safety technical disclosure must be made to the mechanical driver.
(2), excavator driver must hold relevant certificates.
(3), earthwork construction must be carried out in strict accordance with the plan. Soft soil foundation pit or trench should be excavated evenly in layers. If the layered thickness is thick, the slope must be reserved according to the slope height required by the supporting scheme or construction organization design.
3, groove and pit wall support:
(1), the slope ratio of excavated trench and foundation pit must meet the requirements of supporting scheme or construction organization design, and the slope stability should be calculated according to the geological report.
(2) Through monitoring and observation, it is found that when the supporting system changes abnormally (such as sudden water seepage, water leakage or soil cracking at the edge of the groove, etc.). ), we must analyze the reasons in time and formulate and implement corresponding measures.
4, drainage measures:
Effective drainage measures must be taken inside and outside the pit. According to the requirements of support scheme and support design or construction organization design, light well point dewatering or other methods shall be carried out in the pit. Open ditch drainage should be used outside the pit to prevent water from entering the pit, and at the same time prevent too much water from infiltrating into the ground to increase the lateral pressure.
5, trough, pit load:
Water accumulation, material stacking, transportation vehicles running, mechanical equipment construction, etc. during construction. At the pit edge, it must be arranged according to the groove edge distance required by design, so as to minimize the lateral pressure caused by the ground load at the groove edge.
6, limb protection:
For pits with a depth of more than 2m, protective railings must be set at the edges and closed with dense mesh. The railings should be erected firmly. The railings shall be made of steel pipes with yellow and black paint on the surface.
7, temporary construction electricity:
(1), inspection plan:
(1), temporary electricity construction organization design must be compiled by the project leader and approved by the competent department of the company, and then submitted to the supervisor for approval.
(2) Be targeted, including load calculation, distribution line design, grounding or neutral protection measures, safe electricity use and electrical fire prevention measures.
2. On-site implementation:
TN-S system must be adopted for temporary power consumption on site, and special protective zero line should be set, and five-core cable distribution system is required. Three-level distribution and two-level protection? At the same time, it is stipulated that the switch box must be equipped with leakage protector. One machine, one brake, one box and one leak? Each equipment has its own special switch box regulations, thus improving the essential safety of temporary electricity consumption.
(3), grounding and zero protection system
(1), field grounding and repeated grounding must meet the requirements.
② TN-S system should be adopted.
(3) The setting of special protection zero line meets the requirements.
(4), protective zero line and non-protective zero line shall not be mixed.
(4), distribution box, switch box
(1), what should be observed? Three-level distribution and two-level protection? Requirements.
(2) The switch box (final stage) should have leakage protection, and the protector must be effective.
(3) The parameters of the leakage protection device should match the on-site electricity consumption.
(4), isolating switch must be set in the electric box.
⑤、? One machine, one brake, one leak and one box? You should abide by the rules.
6. The distribution box and switch box installed on the ground should be flat above the ground, and sundries should not be piled up nearby.
All landowners, distribution box, switch box installed electrical equipment should be in good condition, and flexible, good and reliable, contact should not have ablation phenomenon.
⑧ Doors and locks should be installed in the electric box, and rainproof measures should be taken.
5], distribution lines:
(1), the wires shall be kept intact and not aged, and the damaged parts shall be bandaged.
(2) Protective measures shall be taken for the line corridor.
(3) The buried depth of the pole should be 15% of the pole length plus 0.3m, but in soft soil, the buried depth should be appropriately increased or reinforced with chuck.
(4), overhead lines must use insulated copper wire or insulated aluminum wire, overhead lines must be erected on special poles, it is forbidden to erect trees and scaffolding.
⑤ Five-core cables must be used for construction electricity, and four-core wires shall not be used instead of five-core wires.
⑥ The buried depth of the cable shall not be less than 0.6m Fine sand with a thickness of not less than 50mm shall be evenly laid up and down the cable, and then hard protective layers such as bricks shall be covered.
All landowners, rubber cable overhead laying, should be set along the wall or pole, and fixed with insulating clips, fixed spacing should ensure that the rubber cable can bear the load brought by its own weight.
Five, production safety inspection
1, check regularly:
(1), the weekly inspection shall be organized by the project manager to participate in the project safety officer and related personnel, conduct a safety inspection on the site, and fill in the notice of rectification of potential safety hazards.
(2) The safety officer shall conduct safety patrol inspection on the construction site every day, and fill in inspection records regularly.
2, professional or special inspection:
(1), professional inspection shall be organized by project professionals, and special inspections shall be conducted on safety protection, electricity safety, mechanical safety and fire safety, and a notice of potential safety hazards shall be filled in.
2. The flood control safety inspection shall be organized by the leading group for flood control of the project, and shall be reported to the branch and the higher authorities after inspection.
3, seasonal inspection:
(1), the project manager shall organize relevant personnel for each project to conduct targeted safety inspection on the construction site once a month.
(2) The project manager shall organize relevant personnel to supervise and inspect the key parts once a week, and the team safety officer and post director shall supervise and inspect the key parts of the team every day.
Six, information input
1, operator management:
In this entry, the contract number and contract name are entered by other departments. Safety management needs to input the detailed information of workers. If it is a special type of work, the operation certificate of the special type of work should be uploaded together.
2, comprehensive management:
In this entry, there is only one module of integrated safety management, in which the system, temporary plan, pre-plan, on-site rules and regulations and safety management agreement formulated by the project are entered.
3, safety planning:
(1). Pre-preparation: This item is divided into two modules: accident insurance and safety report. In accident insurance, it is necessary to enter the insurance policy, the insured list and the insured amount in time. If there is any personnel change in the project in the later period, the application for personnel change correction shall be handled in time and uploaded in time; Before the project starts, the person in charge of the project shall timely submit the required information to the safety supervision organization for supervision, and issue a safety supervision letter after the project is approved to be built with safe production conditions. The safety officer is responsible for collecting and keeping, uploading in time, and indicating the safety supervision number.
(2) Safety responsibility system: this item is divided into 19 sub-items. Some management systems, safety reward and punishment regulations, and safety management network diagram formulated for the project should be formulated one by one. Various systems and management regulations should be studied together with the project leading group and uploaded in time after confirmation.
(3) Division of project safety responsibilities: according to the safety inspection specifications of the Ministry of Construction, fill in the competent leaders, responsible persons and relevant responsible persons of each inspection area of the project.
(4) Safety technical measures scheme: the project safety civilization plan is entered into the safety management planning scheme of this item, and all kinds of schemes are collected and sorted in time, uploaded and entered; In the division of responsibilities on the construction site, the project leading group negotiates the division of responsibilities on the construction site, and formulates the division of responsibilities of regional leaders. The safety officer collects and informs the regional leaders, and uploads them in time.
(5) Safety management work plan: make monthly, quarterly and annual work plans and upload them for input.
4. Safety objectives and assessment: After the project starts, collect and sort out the safety objective responsibility letters signed with various project ports, as well as the safety assessment problems for workers and project management personnel, and upload and input them by classification.
5. Hazard source and hazardous operation management: In this item, the Hazard Source Identification and Evaluation Form will be uploaded and entered according to the actual situation of the project. If there are risky subdivisional work on site, timely collect and upload the special construction plan compiled by the chief project engineer and approved (or demonstrated by experts) and the safe operation management of risky subdivisional work.
6. Safety inspection and rectification: This item is mainly composed of general inspection of production safety organized by the project manager, special inspection of safety personnel and irregular inspection. The inspection records shall be uploaded and entered by classification, and the traces left after inspection and the rectification notice of potential safety hazards shall be uploaded and entered together with the reply.
7. Safety management activities: This item is mainly aimed at the safety production activities organized by the project and initiated by the company and superior units. It is necessary to collect relevant information during the activity and upload it in time, and summarize and upload it after the activity.
8. Safety education and training: The education and training plan in this item refers to the compilation of the effects and purposes of various kinds of education in the construction process, which is uploaded and entered after being reviewed by the project chief engineer. Education and training records should be educated according to the training plan, and signed on the records, which will be collected, sorted and uploaded by the safety officer.
9. Subcontracting management: collect and sort out subcontractor information, upload and enter the qualification grade, labor subcontracting safety management agreement and temporary electricity consumption safety management agreement signed with subcontractors.
10, emergency management: in the emergency plan, the comprehensive emergency plan is uploaded and entered, and the special plan of the project department is compiled according to the actual situation on site, and uploaded and entered after being reviewed by the project chief engineer; Upload and input the emergency drill records and photos organized by the project in time.
1 1. accident management: in this entry, if there is a safety accident in the project, the cause, process, treatment result and list of injured persons should be entered in detail; The statistical report of project casualty accidents shall be submitted to the monthly project safety report before 1 every month, and uploaded and entered after being reviewed by the deputy manager in charge of the branch.
12. safety cost management: when the project starts, the special safety funds are classified according to the total project cost, and the expenses generated by safe and civilized construction during the construction process are counted and uploaded. (Some safety expenses are purchased or leased by ministry of materials and equipment, such as cables, steel pipes and distribution boxes. , and shall communicate with the project material supervisor at any time to count the expenses); According to the project reward and punishment system, the information of fines and rewards should be uploaded and entered in time.
13, fire control and occupational health management: this item involves the need to collect certificates, test reports, health certificates and other related materials with the project materials and equipment department and logistics management personnel, which should be collected, sorted and uploaded in time.
Remarks on information input: During the input process, most of the original handwritten forms need to be input. The information input platform has built-in photos, but it is not practical. You can take photos with your mobile phone and then import them into your computer to upload.
;