Feng Fei pointed out that in the planning and project construction, the tourist highway around the island should fully reflect the tourism function, adhere to the ecological red line, and reflect the functional differences from ordinary highways. It is necessary to improve the working mechanism and coordinate the design of highways and post stations.
2. Hainan Island Tourism Highway Bidding Publicity
G98 Expressway is located in Hainan, which is a highway around Hainan. To the north of G98 Expressway is Haikou City, Wanning.
On May 3, 2022, Kloc-0, Hainan Provincial Traffic Engineering Construction Bureau held a public tender for the preparation of the safety evaluation report for the expansion project of the Greater Sanya section of the G98 Ring Expressway.
Extension Project of Daxianya Section of G98 Roundabout Expressway
It is understood that the starting point of the main line of the expansion project of the Greater Sanya section of the G98 Ring Expressway is located near Nanpingju on the north side of Lingshui County, which is connected with the expansion line of the Wanning section of the G98 Ring Expressway. The whole line adopts the new double-track expansion scheme, passing through Longguang Town, Yingzhou Town, Sandao Town and Nanlin Township of Baoting County, Ban Ling Reservoir, Fuwan Reservoir, Gaofeng Township, Caili Farm, Baogu Reservoir, Ningyuan River and Dasha River of Sanya City.
3. Hainan Island Tourist Highway Bidding Announcement
That is, Sanying Technology (Shenzhen) Co., Ltd. should be easy to handle.
The company was established on February 26th, 20001year with a registered capital of USD 43 million. Jiang Wenzeng, legal representative, lives at No.2, Donghuan Second Road, Longhua Pinus tabulaeformis 10th Industrial Zone, Longhua New District, Shenzhen. Business scope includes general business items: licensed business items: software design and development, communication network design, software and hardware system integration and related technical services, and related scientific and technological consulting. Production of photoelectric devices, sensitive components, semiconductors, photoelectric materials, new display devices and spare parts of the above products. Develop and produce digital cameras and key components. Engaged in the import and export, wholesale business and related supporting services of similar products of the above products. Smart wearable electronic products, smart home electronic products, mini projector wholesale. Engaged in the management of non-quota licenses and the purchase and sale of non-franchised commodities (the import and export of the above commodities does not involve state-owned trade, import and export quota licenses, export quota bidding, export licenses and other special management commodities, and other special management commodities shall be handled in accordance with relevant state regulations).
4. Hainan Island Highway Bidding Announcement
Hongqi River has not yet started construction.
The ecological problem in northwest China is the biggest ecological problem in China. The ecological environment of drought and water shortage in northwest China leads to a serious imbalance in regional development in China, which seriously restricts China's sustainable development ability. Only by thoroughly solving the problem of water resources in northwest China can we effectively ensure the development space of our country. Therefore, the S4679 research group organized six academicians, twelve professors and many young doctors to tackle key problems and study the water transfer problem in the west. After more than two years' efforts, a practical, scientific and reasonable water transfer route-Hongqi River has been explored. This is a water diversion loop that flows into Xinjiang along the edge of the Qinghai-Tibet Plateau, which will change the ecological pattern of China in one fell swoop.
A red flag leads the way, and a big river brings glory. Hongqi River Project is a water transfer project in the west, focusing on the big ecology, big pattern and big strategy. It's an artery in China. Economic development and cultural integration; It is an ecological project, a livelihood project, a strategic project, and a Millennium plan! This is a Chinese dream that benefits the country and the people and realizes the great cause and great rejuvenation of the Chinese nation!
5. Hainan Island Highway Bidding Hainan Service Platform
Detailed route from Kaiyuan to Jianshui
1. From the starting point to the east, drive 170 meters and turn right.
2. Drive 140m and turn left into Dongxin Road.
3. Drive along Dongxin Road for 260m, turn right, cross the right side (Guangdian Building) and enter Xingyuan North Road.
4. Drive along Xingyuan North Road for 490 meters, and then take St.
14. Continue along G326 for 6.9 kilometers, then turn right into G323.
15. Drive along G323 for 790 meters, get off at the second exit around the island and enter Jige Expressway.
16. Drive along Jige Highway for 2.8km, turn right in Jianshui/Shiping direction and enter Jishi Expressway.
17. Drive along Jishi Expressway for 26.5km and drive on the left (some sections are charged).
18. Continue to drive along Jishi Expressway for 2 1.6km, turn right into Jianshui Interchange (full fare).
19. Drive along Jianshui Interchange for 490 meters, turn left in Jianshui direction (Jianshui Interchange) and enter Tongjian Expressway (all sections are charged).
20. Drive along Tongjian Expressway for 920 meters and go straight into G323 (full highway toll).
2 1. Drive along G323 for 450 meters, drive in the direction of Confucius Temple/Jianshui Avenue, and get off at the third exit around the island to Jianshui Avenue.
22. Drive along Jianshui Avenue1.2km, turn right and enter the roundabout.
23. Drive around the island 1 10 meters and get off at the first exit around the island.
24. Drive140m to the finish line (on the left side of the road).