Who is the designer of the Bird's Nest in China?
The designers of Chinese Bird's Nest are Pierre de Mellon, Li Xinggang and Herzog.

1, Swiss pierrede meuron, world architect, winner of the 200 1 Pritzker Architecture Award. It is famous for designing the main stadium of the 2008 Beijing Olympic Games with Herzog.

2. Li Xinggang, deputy chief architect of China Institute of Architectural Design and Research, has won more than 20 international and domestic awards, including British World Architecture Nomination Award, Asian Architecture Promotion Award and China Architecture Art Award.

Chief designer of China Bird's Nest, deputy chief architect of China Architectural Design and Research Institute, 1969, from Laoting County, Tangshan. 199 1 Graduated from architecture department of Tianjin University, 1998 went to study in France. He participated in the work practice of Herzog and De Mellon, famous Swiss firms, which laid the foundation for the later cooperation in designing the Bird's Nest. 2 1 year architectural design career.

Difficulties in expanding data structures

1. The components are large in size and heavy in weight.

As the main load-bearing component of the roof structure, the truss column has a maximum section of 25m×20m, a height of 67m and a maximum weight of 500 tons. However, the height of the main truss is 12m, the maximum span of the double-span truss is145.577+12.788m, and the maximum span of the non-span truss is 102.95438+0m. Truss columns and main trusses are bulky and heavy.

2. Nodes are complex

Because all the members of this project are box-section members, there is a phenomenon that multiple members intersect in space, whether between the main structures or between the primary and secondary structures. In addition, the substructure is complex and changeable, and the regularity is less, which leads to the complexity of the node structure of the main structure, the variety of node types, and the high accuracy of fabrication and installation.

3. The construction period is tight

The engineering quantity is large, but the installation period is quite short. The project started on February 24, 2003, with a capacity of 65,438+,and was completed before the end of 2007 and by the end of March 2008. The construction period is tight, overlapping with civil works, and the plane site is tense.

4, the welding quantity is large

The site connection of this project is divided into multi-section welding and hoisting, and the site weld length is long. In addition, thick plate welding, high strength steel welding, steel casting welding, etc. Most of them are involved, which leads to considerable workload, high difficulty and more overhead welding.

5, winter rainy season construction

The hoisting time of the main structure of this project needs to span winter and Spring Festival, and it is difficult to construct in winter and rainy season.