Current location - Training Enrollment Network - Books and materials - Bibliography of mechanical and electrical engineering management and practice
Bibliography of mechanical and electrical engineering management and practice
The first electromechanical engineering technology

Chapter I Classification and Use of Mechanical and Electrical Engineering Materials

Section 1 Classification and Use of Metal Materials

Section 2 Classification and Use of Non-metallic Materials

Classification and use of the third power-saving bar

Chapter II Electrical Engineering Technology

Section 1 Circuits and Electrical Equipment

Section 2 Installation of Electrical Equipment

Chapter III Automatic Control and Instrument Engineering Technology

Section 1 Composition and Types of Automatic Control System

Section 2 Installation Technology of Automation Instrument Engineering

Chapter IV Water Supply and Drainage Engineering Technology

The first section building internal water supply system

Section 2 Water supply mode

Section 3 Layout and Laying of Indoor Water Supply Pipelines

The fourth quarter high-rise building water supply system

Section 5 Building Internal Drainage System

Section 6 Fluid Mechanics

Section 7 Pipeline Installation

Chapter V Installation Technology of Mechanical Equipment

Section 1 Equipment Foundation

Section II Preparation of Foundations and Accessories

Section 3 Unpacking Inspection of Equipment

Section 4 Equipment Installation

Section 5 Equipment Cleaning and Assembly

Chapter VI Container Installation Technology

Section 1 Classification and Construction Permit of Pressure Vessels

Section 2 Installation of Steel Vertical Storage Tank

Section III Installation of Spherical Tank

Chapter VII Lifting Technology

The first section lifting rigging and spreader

Section 2 Classification, Basic Parameters and Loads of Hoisting Machinery

The main contents of the hoisting scheme in the third quarter

Chapter VIII Welding Technology

Basic knowledge of steel fusion welding in section 1

Welding deformation and welding stress in the second quarter

The third quarter welding process

Chapter IX Heating, Ventilation and Air Conditioning Engineering Technology

The first section heating system

Section 2 Ventilation and Air Conditioning System

The third quarter clean air conditioning system

Chapter 10 Installation Technology of Intelligent Building Engineering

The first section to master the composition of building intelligent system

The second quarter to understand the technical requirements of building intelligent engineering construction

Chapter 11 Installation Technology of Fire Fighting Engineering

The first section fire engineering acceptance

Section 2 Examination and Approval of Fire Protection Works before Construction

Section 3 Key points of fire control system construction technology

The fourth quarter industrial engineering project fire control system construction characteristics

Chapter XII Anti-corrosion and Thermal Insulation Technology for Equipment and Pipes

Section 1 Anti-corrosion and Derusting of Equipment and Pipelines

The second section equipment and pipeline insulation engineering construction technology

Chapter XIII Surveying Engineering Technology

The first section to master the requirements of mechanical and electrical engineering survey

The second quarter to understand the method of mechanical and electrical engineering measurement

Article 2 Management Practice of Electromechanical Engineering Construction

Chapter XIV Composition of Mechanical and Electrical Engineering Projects

Section 1 Composition of Mechanical and Electrical Engineering Projects

The characteristics of mechanical and electrical engineering projects in the second quarter

Chapter 15 Bidding and Contract Management of Electromechanical Engineering Projects

The first section mechanical and electrical engineering project bidding application

Section 2 Preparation of Bidding Documents for Mechanical and Electrical Engineering Projects

The third quarter mechanical and electrical engineering project contract claims

The fourth quarter mechanical and electrical engineering project construction contract management

Section 5 Cases

Chapter 16 Construction Organization Design and Resource Management of Electromechanical Engineering Projects

Section 1 Preparation of Construction Organization Design for Electromechanical Engineering Projects

The second quarter mechanical and electrical engineering project construction scheme

Section 3 General Plan of Mechanical and Electrical Engineering Project

The fourth quarter mechanical and electrical engineering project construction resource management

Section 5 Cases

Chapter 17 Progress Control of Mechanical and Electrical Engineering Projects

The first section mechanical and electrical engineering project construction schedule

The second quarter mechanical and electrical engineering project construction progress implementation

Section 3 Deviation Analysis of Mechanical and Electrical Engineering Project Construction Schedule

Section 4 Cases

Chapter 18 Quality Control of Mechanical and Electrical Engineering Projects

Section 1 Quality Plan and Quality Pre-control

Section 2 Process Quality Inspection

The third quarter engineering quality accident treatment

Chapter 19 Pre-settlement and Cost Control of Mechanical and Electrical Engineering Projects

Section 1 Composition of Construction and Installation Expenses

Section 2 Composition of Mechanical and Electrical Engineering Project Cost

Section 3 Cost Control of Mechanical and Electrical Engineering Projects

The fourth quarter bill of quantities valuation

Section 5 Project Advance Payment and Completion Settlement

Section 6 Construction Budget

Section 7 Cases

Chapter 20 Safety Management of Electromechanical Engineering Projects

The first section mechanical and electrical engineering project construction site safety production responsibility system

The second section of mechanical and electrical engineering project construction site hazard identification

The third quarter mechanical and electrical engineering project construction safety technical measures

The fourth quarter mechanical and electrical engineering project construction safety emergency plan

Section 5 Handling of Safety Accidents on the Construction Site of Electromechanical Engineering Projects

Section 6 Cases

Chapter 21 Trial Operation of Mechanical and Electrical Engineering Project

Section 1 Steps and Requirements for Trial Operation

Section 2 Single Machine Debugging

Section III Linkage Trial Operation

Section 4 Cases

Chapter 22 Acceptance of Mechanical and Electrical Engineering Projects

The first section of construction and installation engineering construction quality acceptance evaluation

The second quarter industrial installation engineering construction quality acceptance evaluation

The third quarter mechanical and electrical engineering project completion acceptance

Section 4 Cases

Article 3 Laws, regulations and relevant provisions of electromechanical engineering

Chapter 23 People's Republic of China (PRC) and the State Metrology Law

The first section to master the provisions of the use of measuring instruments

Master the requirements of metrological verification in the second quarter

Chapter XXIV People's Republic of China (PRC) Electric Power Law

The first section to master the provisions of the user's electricity consumption

In the second quarter, master the provisions of the construction work in the power facilities protection zone.

Chapter 25 Regulations on Safety Supervision of Special Equipment

Section 1 General Provisions

Section 2 Production of Special Equipment

Section 3 Use of Special Equipment

Section 4 Inspection and Testing

Section 5 Supervision and Inspection

Section 6 Accident Prevention, Investigation and Handling

Section 7 Legal Liability

Section 8 Supplementary Provisions

Chapter 26 General Code for Construction and Acceptance of Mechanical Equipment Installation Project (GB 5023 1)

The first section grasps the applicable scope of construction and acceptance of mechanical equipment installation project.

In the second quarter, understand the general provisions of mechanical equipment commissioning.

In the third quarter, understand the quality inspection and acceptance regulations of mechanical equipment installation engineering

Code for Construction and Acceptance of Welding Engineering of Field Equipment and Industrial Pipes (GB 50236)

Section 1 Qualification of Welding Personnel

The provisions of the second quarter weld nondestructive inspection

Chapter 28 of Code for Acceptance of Construction Quality of Steel Structure Engineering (GB 50205)

The first section to master the provisions of the steel structure installation

Familiar with the provisions of the second quarter steel structure division project completion acceptance.

Chapter 29 Code for Construction and Acceptance of High-voltage Electrical Apparatus in Electrical Equipment Installation Project GBJ 147

The first section to master the provisions of the high voltage electrical installation

Section 2 Project Handover Acceptance

Chapter 30 Code for Construction and Acceptance of Industrial Furnace Masonry Engineering GB 502 1 1

The first section to master the provisions of the industrial furnace masonry engineering process handover

Familiar with the provisions of the second quarter industrial furnace masonry engineering safety technical measures.

In the third quarter, understand the provisions of the acceptance of industrial furnace masonry engineering

Main references

……