Chapter I Classification and Use of Mechanical and Electrical Engineering Materials
Section 1 Classification and Use of Metal Materials
Section 2 Classification and Use of Non-metallic Materials
Classification and use of the third power-saving bar
Chapter II Electrical Engineering Technology
Section 1 Circuits and Electrical Equipment
Section 2 Installation of Electrical Equipment
Chapter III Automatic Control and Instrument Engineering Technology
Section 1 Composition and Types of Automatic Control System
Section 2 Installation Technology of Automation Instrument Engineering
Chapter IV Water Supply and Drainage Engineering Technology
The first section building internal water supply system
Section 2 Water supply mode
Section 3 Layout and Laying of Indoor Water Supply Pipelines
The fourth quarter high-rise building water supply system
Section 5 Building Internal Drainage System
Section 6 Fluid Mechanics
Section 7 Pipeline Installation
Chapter V Installation Technology of Mechanical Equipment
Section 1 Equipment Foundation
Section II Preparation of Foundations and Accessories
Section 3 Unpacking Inspection of Equipment
Section 4 Equipment Installation
Section 5 Equipment Cleaning and Assembly
Chapter VI Container Installation Technology
Section 1 Classification and Construction Permit of Pressure Vessels
Section 2 Installation of Steel Vertical Storage Tank
Section III Installation of Spherical Tank
Chapter VII Lifting Technology
The first section lifting rigging and spreader
Section 2 Classification, Basic Parameters and Loads of Hoisting Machinery
The main contents of the hoisting scheme in the third quarter
Chapter VIII Welding Technology
Basic knowledge of steel fusion welding in section 1
Welding deformation and welding stress in the second quarter
The third quarter welding process
Chapter IX Heating, Ventilation and Air Conditioning Engineering Technology
The first section heating system
Section 2 Ventilation and Air Conditioning System
The third quarter clean air conditioning system
Chapter 10 Installation Technology of Intelligent Building Engineering
The first section to master the composition of building intelligent system
The second quarter to understand the technical requirements of building intelligent engineering construction
Chapter 11 Installation Technology of Fire Fighting Engineering
The first section fire engineering acceptance
Section 2 Examination and Approval of Fire Protection Works before Construction
Section 3 Key points of fire control system construction technology
The fourth quarter industrial engineering project fire control system construction characteristics
Chapter XII Anti-corrosion and Thermal Insulation Technology for Equipment and Pipes
Section 1 Anti-corrosion and Derusting of Equipment and Pipelines
The second section equipment and pipeline insulation engineering construction technology
Chapter XIII Surveying Engineering Technology
The first section to master the requirements of mechanical and electrical engineering survey
The second quarter to understand the method of mechanical and electrical engineering measurement
Article 2 Management Practice of Electromechanical Engineering Construction
Chapter XIV Composition of Mechanical and Electrical Engineering Projects
Section 1 Composition of Mechanical and Electrical Engineering Projects
The characteristics of mechanical and electrical engineering projects in the second quarter
Chapter 15 Bidding and Contract Management of Electromechanical Engineering Projects
The first section mechanical and electrical engineering project bidding application
Section 2 Preparation of Bidding Documents for Mechanical and Electrical Engineering Projects
The third quarter mechanical and electrical engineering project contract claims
The fourth quarter mechanical and electrical engineering project construction contract management
Section 5 Cases
Chapter 16 Construction Organization Design and Resource Management of Electromechanical Engineering Projects
Section 1 Preparation of Construction Organization Design for Electromechanical Engineering Projects
The second quarter mechanical and electrical engineering project construction scheme
Section 3 General Plan of Mechanical and Electrical Engineering Project
The fourth quarter mechanical and electrical engineering project construction resource management
Section 5 Cases
Chapter 17 Progress Control of Mechanical and Electrical Engineering Projects
The first section mechanical and electrical engineering project construction schedule
The second quarter mechanical and electrical engineering project construction progress implementation
Section 3 Deviation Analysis of Mechanical and Electrical Engineering Project Construction Schedule
Section 4 Cases
Chapter 18 Quality Control of Mechanical and Electrical Engineering Projects
Section 1 Quality Plan and Quality Pre-control
Section 2 Process Quality Inspection
The third quarter engineering quality accident treatment
Chapter 19 Pre-settlement and Cost Control of Mechanical and Electrical Engineering Projects
Section 1 Composition of Construction and Installation Expenses
Section 2 Composition of Mechanical and Electrical Engineering Project Cost
Section 3 Cost Control of Mechanical and Electrical Engineering Projects
The fourth quarter bill of quantities valuation
Section 5 Project Advance Payment and Completion Settlement
Section 6 Construction Budget
Section 7 Cases
Chapter 20 Safety Management of Electromechanical Engineering Projects
The first section mechanical and electrical engineering project construction site safety production responsibility system
The second section of mechanical and electrical engineering project construction site hazard identification
The third quarter mechanical and electrical engineering project construction safety technical measures
The fourth quarter mechanical and electrical engineering project construction safety emergency plan
Section 5 Handling of Safety Accidents on the Construction Site of Electromechanical Engineering Projects
Section 6 Cases
Chapter 21 Trial Operation of Mechanical and Electrical Engineering Project
Section 1 Steps and Requirements for Trial Operation
Section 2 Single Machine Debugging
Section III Linkage Trial Operation
Section 4 Cases
Chapter 22 Acceptance of Mechanical and Electrical Engineering Projects
The first section of construction and installation engineering construction quality acceptance evaluation
The second quarter industrial installation engineering construction quality acceptance evaluation
The third quarter mechanical and electrical engineering project completion acceptance
Section 4 Cases
Article 3 Laws, regulations and relevant provisions of electromechanical engineering
Chapter 23 People's Republic of China (PRC) and the State Metrology Law
The first section to master the provisions of the use of measuring instruments
Master the requirements of metrological verification in the second quarter
Chapter XXIV People's Republic of China (PRC) Electric Power Law
The first section to master the provisions of the user's electricity consumption
In the second quarter, master the provisions of the construction work in the power facilities protection zone.
Chapter 25 Regulations on Safety Supervision of Special Equipment
Section 1 General Provisions
Section 2 Production of Special Equipment
Section 3 Use of Special Equipment
Section 4 Inspection and Testing
Section 5 Supervision and Inspection
Section 6 Accident Prevention, Investigation and Handling
Section 7 Legal Liability
Section 8 Supplementary Provisions
Chapter 26 General Code for Construction and Acceptance of Mechanical Equipment Installation Project (GB 5023 1)
The first section grasps the applicable scope of construction and acceptance of mechanical equipment installation project.
In the second quarter, understand the general provisions of mechanical equipment commissioning.
In the third quarter, understand the quality inspection and acceptance regulations of mechanical equipment installation engineering
Code for Construction and Acceptance of Welding Engineering of Field Equipment and Industrial Pipes (GB 50236)
Section 1 Qualification of Welding Personnel
The provisions of the second quarter weld nondestructive inspection
Chapter 28 of Code for Acceptance of Construction Quality of Steel Structure Engineering (GB 50205)
The first section to master the provisions of the steel structure installation
Familiar with the provisions of the second quarter steel structure division project completion acceptance.
Chapter 29 Code for Construction and Acceptance of High-voltage Electrical Apparatus in Electrical Equipment Installation Project GBJ 147
The first section to master the provisions of the high voltage electrical installation
Section 2 Project Handover Acceptance
Chapter 30 Code for Construction and Acceptance of Industrial Furnace Masonry Engineering GB 502 1 1
The first section to master the provisions of the industrial furnace masonry engineering process handover
Familiar with the provisions of the second quarter industrial furnace masonry engineering safety technical measures.
In the third quarter, understand the provisions of the acceptance of industrial furnace masonry engineering
Main references
……