Job responsibilities of data supervisor
Responsibilities of Information Directors (Selected 10)

In daily life, job responsibilities are used more and more frequently, and formulating job responsibilities is conducive to improving work efficiency and quality. So do you really know how to formulate job responsibilities? The following is the job responsibilities of the information director (selected 10) compiled by me for your reference, hoping to help friends in need.

Responsibilities of information supervisor: 1 1. Supervise the general contractor to submit the relevant information of subcontractors for approval, including auditing the qualifications of subcontractors, post certificates of personnel, quality assurance information of materials, etc.

2. After receiving all kinds of materials and documents issued by superiors, register and file them in time and distribute them to relevant units or individuals in time.

3. Complete the transmission of engineering data in time. After receiving all kinds of information reported by the construction unit, it shall be classified and filed in time. For unqualified materials, react with the director and professional engineers in time, and feed back to the construction unit, requiring them to be revised and reported to the supervision department again, and handle them according to the procedures. All the documents and materials have been registered.

4. Complete the word processing work of the department in time, and cooperate with the professional supervision engineers to make meeting minutes (50 copies), monthly supervision report (12), supervision engineer's notice (173 copies), work contact list (2 1 copy), weekly safety inspection records (43 copies) and monthly safety hazard investigation.

5. Complete the collection, sorting, summary, compilation and filing of engineering data. This year's materials are mainly decoration projects, and there are more than 3,500 materials signed by the supervisor in the inspection lot alone.

6, daily data management work, are recorded in the supervision log. Do a good job of summarizing the supervision log of the supervision project department. Summarize the contents of supervision logs of various professional engineers into the general supervision log, and sign it by the director.

Responsibilities of information director 2. Familiar with construction drawings, master construction specifications and acceptance criteria.

Second, go deep into the construction site, learn more about the progress of the project, and make hidden records and quality records of various projects in time. Do a good job of signing, sorting, filing and filing the technical data of partial projects.

Three, timely grasp the site construction progress, cooperate with the budget officer to report the project payment and visa. Communicate and cooperate with the budgeter in time when the construction site changes, and collect the data measurement and image data of the construction site.

Fourth, master the inspection methods of various materials, collect certificates and inspection reports of various materials, and submit test materials in time.

Five, in accordance with the provisions, do and maintain the physical and chemical tests of concrete and mortar test blocks and main materials.

Six, do a good job in all kinds of documents, construction drawings, changes, came, meeting minutes and various rules and regulations, such as sending and receiving, registration, establish a data account.

Six, timely and accurately distribute all kinds of information to relevant personnel, and establish a receiving and dispatching account.

Seven, check the foreman's construction drawings, collect and keep technical data, to prevent the loss of damage, affect the construction.

Eight, responsible for printing and copying technical data and drawings.

Nine, the reference room (library) books and materials to do a good job of establishing accounts, numbering and classification. Go through the borrowing registration formalities in strict accordance with the technical data and technical files.

Ten, formulate the management system of the office, do a good job in the daily management of the office.

Eleven, complete other work arranged by the leadership.

Responsibilities of Information Supervisor Article 3 These responsibilities are formulated in order to strengthen project management, ensure the standardized management of engineering data, ensure that the project is completed on schedule with good quality, minimize project cost, save investment and achieve the overall goal of the project.

Article 2 under the leadership of the project manager, the documenter is mainly responsible for the collection, sorting, screening, archiving and archiving management of company documents and engineering documents.

Section 2 Specific Responsibilities

Article 3. Seriously implement the company's management rules and regulations, and establish and improve the post responsibility system for engineering data management.

Article 4 Be responsible for collecting and sorting out the construction technical data synchronously according to the progress of the project, and cataloguing and archiving them according to the provisions of the state.

Article 5 Be responsible for compiling construction technical data to ensure the authenticity, integrity and effectiveness of the data.

Article 6 be responsible for filing and handing over the construction technical data. Do a good job in the management of construction technical data.

Article 7 Implement the relevant management measures of the company's documents and materials to ensure the orderly management of the documents and materials of the unit and department.

Eighth responsible for the issuance, recycling, borrowing and circulation of documents and materials of the unit and department, and timely convey.

Ninth establish and improve the effective control of documents and records, to prevent documents from being damaged or lost.

Article 10 Assist and cooperate with employees of this department to carry out related daily work.

Eleventh to complete other tasks assigned by the leadership.

Responsibilities of the information director. Responsible for the safety work, cleaning and hygiene work, daily management and other work of the reference room, and manage it scientifically according to the chapter; Collect the information of books and materials of various disciplines in the college, and order and collect relevant books and materials in time. Coordinate the borrowing of books and periodicals by graduates of various majors.

Second, according to the requirements of the college, do a good job in booking, acceptance and financial reimbursement of new books and periodicals; Do a good job in sorting, classifying, numbering, putting on shelves, summarizing and cataloging the data, and compile the data index.

3. Handling the collection, registration, filling and binding of periodicals; Newspapers and magazines should be bound monthly or annually and properly kept.

Four, do a good job in the collection and storage of books, periodicals and materials, and regularly invite relevant professionals to weed out the old.

Five, enthusiastic service for readers, patiently handle the borrowing and returning procedures of books and periodicals, and answer relevant inquiries.

Six, the implementation of a semester inventory of books and materials, two weeks before the winter and summer vacations each year, the next semester to re-apply for borrowing procedures.

Seven, strictly implement the college library management system, master the real-time data of all books and materials.

Eight, complete the relevant tasks of the school library on time, upload and publish the information of relevant functional departments in time.

Nine, responsible for drafting the book management work summary, submitted to the director of the office after being audited by the competent leader.

Ten, assist and participate in the service of large-scale activities of the college.

Eleven, complete other temporary work assigned by the hospital leadership.

Responsibilities of data supervisor 5 1. Cooperate with professional supervision engineer to strictly control the engineering data of each construction unit. Because the engineering data is the true reflection of the engineering construction achievements, and the data is all kinds of information records formed in the process of engineering construction. Only the supervision engineer and the construction unit librarians fully cooperate can this work be completed and done well.

2, responsible for the management of supervision data, and supervision data collection, sorting and archiving. Supervision data is a real record of supervision work in the process of engineering construction, and it is a systematic project. It involves the substantive work of engineering contractors such as supervision units, construction units, construction units and design units, and is a symbol of scientific, standardized and legal supervision work. Supervision data reflects the level of supervision work and is an important basis for measuring and evaluating supervision work.

3, according to the contract, in the survey and design stage, the formation, accumulation, composition and filing of survey and design documents.

4. Writing meeting minutes and monthly supervision report is the summary of the project progress and supervision work by the supervision department within one month, and it is also an important basis for the relevant departments to check and evaluate the work of the supervision department. Therefore, it is very important and crucial to do this work well.

5, according to the data specification will be included in the scope of supervision of urban construction archives data handed over to the urban construction archives. Only when all the previous links are done well can the files be handed over smoothly and the supervision work be completed smoothly.

Responsibilities of the information director 6 1. Responsible for receiving, counting, registering, distributing, filing and managing all drawings of the project;

2. Collect and file all technical changes, negotiation records, meeting minutes and other materials in the construction process;

3. Be responsible for filling, countersigning, sorting, submitting and filing the archival materials;

4. Supervise and inspect the compilation and management of the construction data of the construction unit, so as to be complete, timely and synchronized with the construction progress;

5. Hand over to the group archives room on time: after the project is completed, be responsible for filing the documents and engineering data and handing them over to the company.

6 responsible for the transfer of files to the municipal urban construction archives:

7. Instruct the engineers and technicians to keep the construction technical data (including the unpacking data of the equipment entering the site);

8. Be responsible for summarizing and reporting the completion and output value of the construction site and compiling monthly construction statistics;

9. Be responsible for the file management of various contracts related to the project;

10. Responsible for providing the main image progress information of the project to the sales planning;

1 1. Responsible for the indoor management of the project.

12. Assist the project manager in external coordination and reception;

13. Responsible for the indoor management of the project:

14. Responsible for the logistics support of the project;

15. Complete other tasks assigned by the engineering manager.

Responsibilities of the information director 7 1. Be familiar with the drawings carefully and make a budget within half a month after receiving them.

2. According to the requirements of drawings and the materials actually used on site, put forward the material plan of the project.

3. When the drawings are changed, sign for them from the relevant units or individuals, and take back the drawings for modification.

4. Organize relevant majors, departments and personnel to do a good job of the blue prints.the design and self-examination.

5. The collection of all kinds of original materials and the storage of counters, the delivery of drawings and materials, and the relevant visa procedures.

6. Review the accuracy of the foreman's receiving work in each section, and report it to the assistant project manager for review after signing.

7. According to the provisions of the "office management measures" for inspection.

8. Participate in the preparation of construction organization design, and make economic calculation of the scheme.

9. Participate in civilized construction inspection and make records.

10. Submit the progress plan and schedule completion table to the construction unit, supervision unit and relevant departments of the company.

1 1. Manage all kinds of contracts, check the implementation of relevant departments according to the contract terms, and put forward assessment opinions on the inspection results.

12. Handle the report on the commencement and completion of the project.

13. Put forward the work plan that needs bidding, and report it to the functional departments and competent leaders of the company to participate in the bidding work.

14. Do a good job in collecting, sorting out and paying employees' attendance sheets.

Responsibilities of Information Supervisor 8 (1) Carry out the regulations of higher authorities on information management of water conservancy and hydropower projects.

(2) Be responsible for the timely receipt, sorting, distribution, borrowing, preservation, engineering drawing change, etc. of all engineering contracts, data drawings, negotiation records and correspondence.

(3) With the development of the project, collect and sort out relevant project data synchronously.

(4) Register the documents and design schemes that need to be changed by numbers, and deliver them to the users of engineering and technical documents in time and effectively.

(5) Collect and sort out the documents and materials formed in the project preparation stage and completion acceptance stage, and start archiving as soon as possible.

(6) Archive documents must be complete, complete, systematic and accurate.

(7) The archived documents and materials must be organized and conform to their formation rules.

(8) Archived documents must accurately reflect the real content and historical process of various activities such as production, scientific research, capital construction, operation and management.

(9) Strictly implement data work requirements, strengthen daily management and protection of data, conduct regular inspections, report problems to the competent manager in time, and take effective measures to ensure data security.

(10) Evaluate the data periodically according to its storage cycle.

(1 1) Maintain the integrity and safety of the project engineering data, and refuse to provide any use that violates this system or is improperly used.

(12) Participate in the arrangement and handover of the company's project completion drawings.

Responsibilities of information supervisor 9 I. Daily work

1. Implement the regulations of the Executive Department on information management of construction projects.

2. Be responsible for sending, receiving, communicating and managing documents and materials with the construction unit, supervision unit and other units.

3. All the collected construction project materials are bound in plastic, and customers are ready to visit the company.

4. According to the data storage period, the data are regularly identified, and the data five years ago are sealed and put into storage.

5. Assessment key points: According to the regulations of the company's data management;

Second, the construction project data management

6. Be responsible for timely receiving, sorting, distributing, borrowing and saving all construction contracts, data drawings, negotiation records and correspondence documents;

7. With the development of the project, collect and sort out relevant project data synchronously;

8. Collect and sort out the documents formed in the preparation stage and completion acceptance stage of the project to form archived binding materials;

9. Archive documents must be complete, complete, systematic and accurate;

10. The archived documents and materials must be organized and conform to their formation rules.

1 1. Strictly implement the data work requirements, strengthen the daily management and protection of data, check regularly, report problems to the project manager in time, and take effective measures to ensure data safety.

12. Handle all kinds of public relations.

13. evaluation focus: integrity of construction project data;

Third, cooperate with the construction

Cooperate with the project manager to deal with some problems encountered in construction projects.

Responsibilities of information supervisor: 10 1. Manage all kinds of documents, materials and design drawings on the construction site, and establish engineering files of project construction drawings and design changes; Responsible for receiving, issuing, borrowing and signing procedures with the general contractor, supervision and relevant departments of the company.

2. Timely handle the reports and correspondence between projects, classify and file according to projects and categories, list the contents, and file them after being approved by the engineering manager.

3. Collect and establish standards, documents, building materials and equipment related to engineering construction, and do a good job in receiving, classifying, sorting and archiving all kinds of files for easy storage and utilization.

4, according to the relevant provisions of the competent department of construction and urban construction archives, collect, check and review the construction project completion data; Cooperate with other departments of the company to summarize and sort out the project establishment basis documents, on-site audio-visual files and so on.

5. Be responsible for the classification, login and filing of management documents and technical documents received every day. The original design changes (including minutes of blue prints.the design) shall be filed. Do a good job of collecting and sorting out information to ensure the full realization of management objectives.

6. Attend relevant engineering meetings and make records.

7. Centralized archiving of electronic documents of this department to avoid the loss of important documents due to computer problems.

8. Strictly abide by the company's confidentiality system at work.

9. Complete other tasks assigned by the leaders on time.

;