Current location - Training Enrollment Network - Books and materials - Which part of the environmental impact assessment should be done in the construction process?
Which part of the environmental impact assessment should be done in the construction process?
In the process of environmental impact assessment, the whole process of environmental protection construction of enterprises is to first build, rebuild, expand and relocate projects, then carry out environmental impact assessment, and then submit an environmental impact assessment report to the Environmental Protection Bureau, which will give an environmental impact assessment reply before starting construction. During the construction process, pollution control facilities will also be put into operation at the same time, and then they will enter the trial production stage. During this period, the three wastes (waste water, waste gas and noise) will be monitored. After the monitoring is qualified, the Environmental Protection Bureau accepts it and then applies for sewage discharge. Therefore, environmental impact assessment is needed at the beginning of project construction.

Who has the curriculum design of environmental impact assessment? Go to the library to find an EIA case.

Just take some photos.

Undergraduate design bar

Correct attitude, neat handwriting, up to standard space, no problem.

Which comes first, environmental impact assessment or geological survey? The project establishment process is in your order. First, carry out geological survey, analogy and determine the proposed site. After that, entrust qualified intermediary units to prepare feasibility study report, cleaner production audit report and fixed assets investment report, and submit the report to the development and reform department with approval authority for filing and project establishment.

After obtaining the approval document from the development and reform department, it is necessary to apply to the environmental protection department for pre-assessment opinions, which requires on-site investigation. After obtaining the pre-trial opinions and the documents of the development and reform department, entrust the unit with EIA qualification to prepare the corresponding EIA documents (reports, forms and registration forms), and then report them to the environmental protection department for approval.

When preparing the EIA document for you, the EIA unit needs your employer to provide relevant technical data, such as topographic map, environmental map, meteorological analysis data and monitoring data of environmental quality. For projects closely related to the geological environment, such as mining, land resources development, agriculture, forestry and water conservancy, it is necessary not only to collect information from relevant departments, but also to conduct on-site geological investigation for those with high evaluation level.

According to the latest "Technical Guidelines for Environmental Impact Assessment of Planning and Construction", at present, the environmental impact assessment of construction projects is the main assessment content of all chapters and elements involved in planning and environmental impact assessment. In the future, the national environmental protection department will gradually introduce special assessment content for all elements of planning according to the national environmental protection development trend and requirements. Among them, the contents of the ecological environmental assessment mainly include:

First, the investigation and evaluation of ecological status:

1, ecological background investigation and evaluation (1) (natural ecology-vegetation type, distribution, coverage, biomass, diversity, important value, whether there are rare and national key protected species and their protection status requirements; Species, quantity, distribution, food source, water source, reproductive characteristics, migration law, rare and endangered species and national key protected species of wild animals. (1) Agroecology (type and quantity of land occupation, whether it involves basic farmland and quantity, types of cash crops, soil thickness, fertility, parent materials of soil formation, etc.). (1) Soil erosion (erosion modulus, erosion area, erosion amount, relationship between soil erosion and engineering, development trend, etc.). (4) Landscape ecology (planning the key protection targets and protection status of nature reserves and scenic spots in the project area, etc. (5) social ecology (whether resettlement, cultural relics protection, etc. Project areas participating in the plan)

2. Investigate and evaluate the ecological problems in the planning area and its affected areas (there are major ecological problems that mainly restrict the sustainable development of this area, such as environmental pollution, soil erosion, species invasion, rocky desertification, etc.). )

Two, the planning project area and its influence area of ecological impact prediction and evaluation

Main ecological impacts (including vegetation, wildlife, soil and water, agricultural ecology, landscape ecology, social ecological impacts, etc.). ) caused by the implementation of the planned project,

Three. Environmental protection measures and effect analysis (put forward various vegetation protection measures, animal protection measures, soil and water conservation measures, reasonable resettlement, landscape protection, cultural relics protection measures, etc.). , and determine the choice according to the actual situation of the planned project)

Case study on curriculum design of environmental impact assessment

Very detailed.

Design case analysis ........

Tell me about your requirements.

Where can I buy textbooks for environmental impact assessors? Baoding Blueprint Architecture Bookstore sells it, tell you the telephone number: 2202873.

A good environmental impact assessment engineer is a professional technician who has obtained the professional qualification certificates of environmental impact assessment engineers in People's Republic of China (PRC) and China and is engaged in environmental impact assessment after registration.

The professional qualification system of environmental impact assessment engineer is suitable for professional and technical personnel engaged in environmental impact assessment, technical assessment and environmental protection acceptance of planning and construction projects. The examination for environmental impact assessors is organized by the State Environmental Protection Administration and the Ministry of Personnel. The examination content includes the following four subjects: environmental impact assessment related laws and regulations, environmental impact assessment technical guidelines and standards, environmental impact assessment technical methods, and environmental impact assessment case analysis. The assessment results are managed in a rolling way, with a period of two years.

Kneel for the invitation code of EIA forum: eibbs. /home.php? Invite and invite. id= 1 1846。 C = y2mp8m[ copy ]y2mp8m[ copy]

:eiabbs。 /home.php? Invite and invite. id= 1 1845。 C = o 1r 9 gt[ copy ]o 1r 9 gt[ copy]

:eiabbs。 /home.php? Invite and invite. id= 1 1844。 C=af8rll [copy] af8rll [copy]

:eiabbs。 /home.php? Invite and invite. id= 1 1843。 C=cvee9i [copy] cvee9i [copy]

:eiabbs。 /home.php? Invite and invite. id= 1 1842。 C=ijj99g [copy] ijj99g [copy]

:eiabbs。 /home.php? Invite and invite. id= 1 184 1。 c = ma 6 1mm[copy]ma 6 1mm[copy]

:eiabbs。 /home.php? Invite and invite. id= 1 1840。 C = n 1t4 a4[ copy ]n 1t4 a4[ copy]

:eiabbs。 /home.php? Invite and invite. id= 1 1834。 C=fn68op [copy] fn68op [copy]

:eiabbs。 /home.php? Invite and invite. id= 1 1833。 C=skn0xr [copy] skn0xr [copy]

:eiabbs。 /home.php? Invite and invite. id= 1 1832。 C=zr55fh [copy] zr55fh [copy]

:eiabbs。 /home.php? Invite and invite. id= 1 183 1。 C=q0muxn [copy] q0muxn [copy]

:eiabbs。 /home.php? Invite and invite. id= 1 1829。 C = jyf [copy] jyyf [copy]

:eiabbs。 /home.php? Invite and invite. id= 1 1828。 C=lcyfmt [copy] lcyfmt [copy]

:eiabbs。 /home.php? Invite and invite. id= 1 1827。 c=my38xg

What is the biggest workload in environmental impact assessment, and what is the focus of environmental impact assessment? Engineering analysis. This is the focus of industrial attention.

If it is ecological, I think it should be collecting information.