Current location - Training Enrollment Network - Books and materials - How to fill in the building eaves height in the project introduction? This paper indicates the height of the building. How to calculate. If it is urgent and correct, it will add 10 wealth value.
How to fill in the building eaves height in the project introduction? This paper indicates the height of the building. How to calculate. If it is urgent and correct, it will add 10 wealth value.
In 1, JGJ3-20 10 (high code) and several articles, it refers to the height from the outdoor ground to the main roof. Cornice, a term of building structure, is used for sloping roofs in traditional books, but most modern buildings are flat roofs, so it is difficult to determine the specific position of cornice, which is a vague position, so the word "main roof" has been used in high codes (including JGJ3-2002 edition).

2. The project summary table is not a national standard format, and its wording has not been strictly scrutinized.

3. The column of "Building cornice height" in the project profile is only a general situation, and there is nothing wrong with filling in "Building height" without strict scrutiny.

4. Therefore, it should be filled in according to the building height value shown in the design drawings, so as to achieve the purpose of summarizing the general situation of the project.