Reply of Nanning Municipal Development and Reform Commission on the Proposal for Reconstruction and Expansion of Xinmin Campus (Junior Middle School) of Nanning No.2 Middle School
Nanning No.2 Middle School:
Your request for instructions on the reconstruction and expansion project of Xinmin Campus (junior middle school) in Nanning No.2 Middle School and related materials have been received. According to the Decision of the State Council on Investment System Reform (Guo Fa [2004] No.20), the project proposal is hereby approved as follows:
1. In order to promote the development of education in Nanning and improve the school-running environment, it is agreed to establish the reconstruction and expansion project of Xinmin Campus (junior middle school) in Nanning No.2 Middle School.
2. Project code: 2103-450100-04-01-281844.
Three. Location of the proposed project: No.29 Xinmin Road, Qingxiu District, Nanning (within Nanning No.2 Middle School).
Four. Proposed scale and main construction contents
(1) Proposed scale: A new junior high school with 60 classes will be built after the reconstruction and expansion of this project. The project plans to demolish the original building of 642 1 m2 (2,303 m2 for the first teaching building, 2,463 m2 for the second teaching building, 0.583 m2 for the gymnasium, 36 m2 for the power distribution room and 36 m2 for the water pump room); Renovation of the original building of 78 16 square meters (2,393 square meters for the teaching and experimental building, 0/.256 square meters for the third teaching building and 4 1.67 square meters for the art class); The newly-built total construction area is 274 12 square meters, of which the above-ground construction area is 210/2 square meters (teaching auxiliary room 78 12 square meters, indoor sports room 4030 square meters, library1kloc-0/70 square meters, administrative management.
Main construction contents: demolition project, construction project, structural project, water supply and drainage project, electrical project, fire protection project, heating and ventilation project, outdoor sports ground, road square, earthwork project, greening project, retaining wall project, outdoor hydropower project, outdoor swimming pool and equipment, kitchen equipment, etc.
5. Total investment of the project: the estimated investment of the project is 1740 1 10,000 yuan, of which the first part of the project cost is133.94 million yuan, the second part of other expenses is 20.05 million yuan, and the reserve fund is 20.02 million yuan.
Intransitive verbs Source of funds: municipal financial financing.
Seven, please organize the preparation of feasibility study report after receiving the article, and go through the preliminary procedures related to land, planning, environmental protection, water conservancy and energy conservation. , after the completion of the feasibility study report submitted to our committee for approval.
Eight, since the date of the approval issued, the original project proposal approval (No.4 [2065438+06] of Nanfa Reform Society) is invalid.
nanning municipal development and reform commission
20219 March