2, the construction unit's business license, organization code certificate or enterprise name pre-approval notice and other legal identity documents copy;
3. Fire protection design documents (which should meet the requirements of the Ministry of Public Security for the declaration of fire protection design documents for construction projects, including fire protection design instructions, general plan, outdoor fire hydrant layout and complete single building design drawings made and signed by the design unit), and the drawings must be folded into A4 specifications;
4. Design the CD-ROM of electronic files of drawings, and the format of electronic files is non-modifiable, such as DWF format;
5. Technical scheme and description of special fire protection design, or Chinese text of international standards and foreign fire protection technical standards adopted in the design, as well as other technical materials such as application examples and product descriptions related to fire protection design;
6, the construction unit power of attorney or power of attorney, legal representative, the client's ID card copy.
Extended data
The fire control institutions of public security organs shall, in accordance with the evaluation criteria for fire control acceptance of construction projects, organize fire control acceptance of construction projects that have passed the fire control design audit. The fire control institutions of public security organs shall issue fire control acceptance opinions for the construction projects that are qualified through comprehensive evaluation; If the comprehensive evaluation conclusion is unqualified, it shall issue unqualified opinions on fire control acceptance and explain the reasons.
Baidu encyclopedia-fire inspection and acceptance