Current location - Training Enrollment Network - Books and materials - How to design the library corridor load, is it the same as the general floor load? The teacher said that the corridor should have a ceiling. I'm a little confused. Please give me some advice. Thank yo
How to design the library corridor load, is it the same as the general floor load? The teacher said that the corridor should have a ceiling. I'm a little confused. Please give me some advice. Thank yo
How to design the library corridor load, is it the same as the general floor load? The teacher said that the corridor should have a ceiling. I'm a little confused. Please give me some advice. Thank you. The floor load is divided into dead load and live load, and the corridor of the library should be a fire escape. According to Article 4. 1. 1 of the Dutch Code, the live load should be 3.5KN/m2. According to the use function, the general floor load can be obtained by looking up the table according to the requirements of Dutch code.

Ceiling is a secondary decoration load, which can be included in the dead load for strength checking together with the floor decoration load. Generally take 0.2 ~ 0.5 kn/m2; If the ceiling is special, it needs to be calculated according to the actual weight.