The new campus of Tianjin University will build a water ecological campus with lakes and constructed wetlands as the core. All buildings will be built by water, forming a unique lakeside waterscape campus. The new planning model based on "discipline belt+function belt" includes engineering discipline belt, engineering discipline belt, basic discipline belt, arts and sciences discipline belt and administrative external function area, teaching experiment function area, physical education teaching function area, student life function area, sports leisure function area and so on. , fully meet the needs of teachers and students in study, life and work. At the same time, the new campus will also establish a long axis of history and culture of a century-old prestigious school.
20 15 after the completion of the first phase of the new campus project, the school will divide the time nodes and implement the relocation work step by step according to three parts: cross-campus, on-campus and new student registration. Among them, the cross-campus relocation scope includes all students of Mechanical College, Computer College, Software College, Civil Engineering College, Chemical Engineering College, Materials College, Environment College, Science College, Law College, Marxism College, Education College and Qiushi Department (excluding third-and fourth-year undergraduates majoring in electrical and electronic engineering); 20 14 undergraduates from lean college, automation college and information college. 15 freshmen of grade 20 15 who moved from college (department) across the campus report to the new campus; 12 the freshmen of the graduate students who moved to the college (department) on 20 15 reported to the new campus.
As of July 20 14, the construction of the new campus has been accelerated, the renovation project of state-funded projects has been fully launched, and the main structure and secondary structure of the financing construction projects have been constructed separately. The main structure of more than 500,000 square meters of buildings in the new campus is capped.
Wall plastering and roof waterproofing of the library group are all completed to 90%, and the ground cushion is completed to 20%; 45% shale bricks are laid on the outer wall of the comprehensive teaching experimental building, and doors and windows curtain walls are installed10%; 50% of the decoration works of the mechanical teaching group were completed, and 60% of the installation of the main frame of the window was completed. More than 300,000 square meters of financing construction projects, such as North District, Central District, South District, Master's, Doctor's Living Group, Second Teaching Building, Computer Software Teaching Group and Chemical Materials Teaching Group North District Building, were carried out with secondary structural masonry and interior wall plastering, and the student living group began to be renovated in mid-August; The construction of the main structure of the first teaching building, the student activity center, the third and fifth canteens with an area of about 30,000 square meters is nearing completion; The main building, water construction teaching group, east living group, administrative center and comprehensive gymnasium are partly built together with the main structure above ground, and some are in the foundation construction stage. Infrastructure supporting projects were promoted in an orderly manner.
It is estimated that by 20 1 1 and 65438+February, the mechanical teaching group and comprehensive experimental building will be fully completed, and the library, some discipline groups and most student dormitories will be renovated. In 20 13, the construction of roads and bridges in the school was promoted one after another, the central rivers and lakes were excavated one after another, the landscape greening project was further improved, and the prototype of the new campus appeared. April-August, 20 15, and the rest of the projects were completed and put into use. According to the arrangement of the school, the celebration activities for the 20th anniversary of 20 15 120 will be held in the new campus, and the first batch of colleges moving into the new campus will be settled in the summer of 20 15.