Model 1 of land use application report:
Construction land application report
Xuanwu Branch of xx Municipal Bureau of Land and Resources:
Our unit is responsible for the development and construction of the project has completed the relevant preliminary work, and hereby declare the pre-examination of land for construction projects. The relevant information of this project is reported as follows:
First, the basic situation of the construction unit
The establishment, nature (central state organs, institutions, troops stationed in Beijing or other units), business scope and existing land use of the unit.
Second, the basic situation of the construction project
The relevant background and necessity of the project construction;
The specific location, planning basis and functional orientation of the land to be used for the project, and the detailed contents of the construction planning such as the total scale, land use nature, building scale and functional layout of the construction project;
Total investment and sources of funds of the project;
The progress of the preliminary work of the construction project and the relevant approval documents obtained;
Other circumstances that need special explanation.
Three. Land for construction projects
Relevant basis, standards and procedures for determining the total scale of land for construction projects;
The present situation of land ownership of construction projects, including the total land area with land and collective land in China, the area of agricultural land, construction land and unused land in the present situation of land utilization, the area of cultivated land or basic farmland occupied, the supplementary methods, standards and fund implementation of occupied cultivated land; Ways of land use for construction projects (including requisition and occupation), etc. ;
Land use indicators related to construction projects, including building density, floor area ratio, land for administrative office and living service facilities (or shared land area), etc.
I hereby report it.
Attachment:
① Business license of enterprise legal person or certificate of institution legal person and organization code certificate of administrative organ (copy); Legal representative's ID card (photocopy) and power of attorney (original);
(3) Topographic map (original) indicating the scope and coordinates of the project land;
④ Other relevant materials (copies).
(Seal of the applicant)
Year? Month? sun
Model land use application report Part II: Application report for planned land use
Zhengzhou Shangjie District Construction Bureau:
The basic situation of the new campus construction project of Zhengzhou Railway Senior Technical School has been included in the construction project of "Zhengzhou Livable Vocational Education City". China Railway Engineering Corporation, Zhengzhou Human Resources and Social Security Bureau and Zhengzhou Land and Resources Bureau have sent letters (documents) agreeing to carry out the preliminary work. The construction scale of the project is 400,000 square meters (600 mu), including campus construction of 355,573 square meters (533.36 mu), urban roads of 28,685 square meters (43.03 mu) and public green space 15742 square meters (23.6 1 mu). The newly-built building area is 204,246 square meters, of which the above-ground building area is198,966 square meters and the underground building area is 5,280 square meters.
The building contents include: the main teaching building covers an area of12500m2, the teaching building covers an area of 31000m2, the experimental training building covers an area of 49488m2, the practice workshop covers an area of 4100m2, and the library covers an area of 1373 1 m2. Storm playground covers an area of 4,800 square meters. The student canteen covers an area of15,009 square meters, the staff canteen covers an area of 1966 square meters, and the living welfare and ancillary buildings cover an area of 9,070 square meters. The total planned investment is 502,782,700 yuan.
Proposed site planning: The new campus project of Zhengzhou Railway Senior Technical School is located in Zhengzhou Livable Vocational Education City, Shang Jie District, Zhengzhou City, between Wanquan Road South, Wuyun Road North, Baimiao Village and Weigang Village. Construction land has been approved by the municipal land department and incorporated into the overall land use planning. Now the "construction land planning scheme" is submitted for approval.
Year, month and day (sealed by the unit applying for land use)
20xx year x month x day
Demonstration report on land use application Part III: Land use application for construction projects
Beijing Municipal Bureau of Land and Resources Branch (Ministry of Land and Resources or Beijing Municipal Bureau of Land and Resources):
Our unit is responsible for the development and construction of the project has completed the relevant preliminary work, and hereby declare the pre-examination of land for construction projects. The relevant information of this project is reported as follows:
First, the basic situation of the construction unit
Main contents: the establishment, nature (central state organs, institutions, troops stationed in Beijing or other units), business scope and existing land use of the unit.
Second, the basic situation of the construction project
Main contents: related background and necessity of project construction; The planning basis and specific location of the project land, the detailed contents of the construction plan such as the total scale, nature, building scale and functional layout of the construction project, and the total investment and funding sources of the project; The progress of the preliminary work of the construction project and the relevant approval documents obtained; Other circumstances that need special explanation.
Three. Land for construction projects
Main contents: the total scale of land for construction projects and related determination basis and standards; The current ownership of land for construction projects, including the total land area, agricultural land, construction land and unused land area, occupied farmland or basic farmland area, supplementary methods, standards and fund implementation of China; Ways of land use for construction projects (including requisition and occupation), etc. ; Land use indicators related to construction projects, including building density, floor area ratio, land for administrative office and living service facilities (or shared land area), etc.
I hereby report it.
Attachment: 1, enterprise business license or legal person code certificate (copy);
2. Legal person identity certificate and power of attorney (copy);
3. Topographic map (original with official seal);
4. Relevant approval documents or other auxiliary materials.
(Seal of the applicant)
A, foam extinguisher can form a foam coating on the surface of combustible materials, so that the surface of combustible materials is isolated